Eweb ITB 23-154-g trail bridge debris boom
Closed State & local contract opportunity Posted
- Solicitation number
- S-P00140-00007636
- State
- Oregon
- Responses due
Opportunity facts
- Jurisdictions
- NIGP code
Opportunity details come from oregonbuys.gov. Updated .
About this opportunity
The Eugene Water & Electric Board (EWEB) has issued an Invitation to Bid (ITB) #23-154-G for the procurement of a new debris boom and boat ramp for the main spillway at Trail Bridge Reservoir, located within EWEB's Carmen-Smith Hydroelectric Project in Lane County, Oregon. The solicitation seeks an experienced producer of heavy-duty marine equipment capable of manufacturing, transporting, and delivering the specified marine infrastructure. Key deliverables include the debris boom, boat ramp, and comprehensive engineering calculations supporting the product selection, which must be signed and stamped by a professional engineer registered in Oregon. Bidders are required to demonstrate their ability to meet specific design loads developed by Jacobs, the project's design engineer, and provide a minimum 5-year warranty on parts. The bid deadline has been extended to August 30, 2023, at 2:00 pm, with potential bidders required to acknowledge receipt of addenda by signing and returning documentation with their response. Evaluation criteria appear to focus on technical capabilities, engineering specifications, and the bidder's ability to meet the precise technical requirements outlined in the ITB documents.
The solicitation documentation does not explicitly specify set-aside designations or restrictions on organizational types that can respond to the bid. No incumbent vendors or current contractors are identified in the available materials. The sample contract indicates a potential not-to-exceed compensation amount, though the specific value is redacted, and suggests the contract may be extended up to five years. EWEB reserves the right to remove unsatisfactory product parts and purchase replacements from alternative sources. The project involves heavy-duty marine equipment for a hydroelectric project infrastructure, which implies a specialized procurement requiring sophisticated engineering and manufacturing capabilities. While precise budget ranges are not disclosed, the comprehensive technical requirements and specialized nature of the project suggest this is a significant municipal infrastructure investment. The contract includes provisions for sustainability, safety, and independent contractor status, indicating a comprehensive approach to vendor selection and project management.
Opportunity text
The Eugene Water & Electric Board (EWEB) seeks an experienced producer of heavy-duty marine equipment to provide the manufacturing, transportation, and delivery of a new debris boom and boat ramp for the main spillway at Trail Bridge Reservoir, located at EWEBÃ???s Carmen-Smith Hydroelectric Project. The Work will also include the calculations supporting ContractorÃ???s product selection.
Files
| File | Type | Posted |
|---|---|---|
| Addendum 3~6.pdf | ||
| Bid tabulation~10.pdf | ||
| Addendum 1~14.pdf | ||
| Exhibit 1-Sample Contract.doc | DOC document | |
| Addendum 2~9.pdf | ||
| Bid Tab~9.pdf | ||
| 23-154-G Debris Boom at Trail Bridge.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity