23-154-G Debris Boom at Trail Bridge.pdf
PDF 74 MB Posted
- Attached to
- EWEB ITB 23-154-G TRAIL BRIDGE DEBRIS BOOM
- Solicitation number
- S-P00140-00007636
- Issued by
- Lane County, Mcminnville City, Oregon
About this file
This document is an Invitation to Bid (ITB) issued by the Eugene Water & Electric Board (EWEB) for the manufacturing, transportation, and delivery of a new debris boom and boat ramp for the main spillway at Trail Bridge Reservoir, located at EWEB's Carmen-Smith Hydroelectric Project. The Work will also include the calculations supporting the selected Contractor's product. The project is located in Lane County and the City of Eugene, Oregon. The ITB requires an experienced producer of heavy-duty marine equipment to provide the requested products and services. The bid response due date and the anticipated contract award date are not specified.
The ITB does not provide details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient information. The document focuses on the technical requirements of the requested products and services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1~14.pdf | ||
| Addendum 3~6.pdf | ||
| Bid tabulation~10.pdf | ||
| Exhibit 1-Sample Contract.doc | DOC document | |
| Bid Tab~9.pdf | ||
| Addendum 2~9.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .