EMERGENCY Notice Boiler Control Emergency Replacement
Closed State & local contract opportunity Posted
- Solicitation number
- 22-444DHS-ISDIS-B-28256
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- UNSPSC codes
- 72154100 Distribution and conditioning system equipment maintenance and repair services
- 72101511 Air conditioning installation or maintenance or repair service
- 72151005 Boiler pressure controller installation
- 72151006 Boiler pressure controller maintenance or repair or operation
- 72151207 Heating and cooling and air conditioning HVAC installation and maintenance service
- 72154102 Heat exchanger maintenance or repair service
- 72154110 Fin fan cooling tower maintenance and repair service
Opportunity details come from bidbuy.illinois.gov. Updated .
About this opportunity
This state and local contract opportunity is for the emergency replacement of boiler controls at a state facility in Mercer County, Illinois. The Illinois Department of Human Services has issued an emergency purchase for Environmental Control Solutions to remove the existing boiler controls, gas valve, combustion air actuator, and O2 monitoring controls, and install a new servo-driven gas valve, combustion air servo motor, VFD for blower motor control, O2 probe, and new control wiring. The expected start date is April 1, 2022, with an estimated end date of June 30, 2022. The total cost of the emergency purchase is $134,930, and it is being funded through State Appropriated Funds and the Plant Improvement Fund (PIF). Environmental Control Solutions was selected for this contract due to their knowledge of the system and being the best equipped to replace the malfunctioning boiler controls.
This contract opportunity does not appear to have any set-aside designations or restrictions on the types of organizations that can respond. The existing contract with Environmental Control Solutions was competitively bid over the past 4.5 years, and they were selected for the emergency purchase. No other incumbent vendors or current contractors are mentioned. The budget range for this contract is $134,930.
Opportunity text
Emergency Notice, Replace Boiler Controls
Files
| File | Type | Posted |
|---|---|---|
| Covid Notice~30.docx | DOCX document | |
| B-28256 Emergency Purchase Statement Boiler Control Replacement.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity