Electric Gate Installation

Closed State & local contract opportunity Posted

Solicitation number
S-KS2410-00014810
State
Oregon
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from oregonbuys.gov. Updated .

About this opportunity

The Salem Area Mass Transit District (SAMTD) is conducting an Invitation to Bid (ITB #25-003) for an Electric Gate Installation project at the Keizer Transit Center in Marion County, Oregon. The procurement seeks qualified firms to design, engineer, permit, construct, and install four automatic vehicle entry gates with comprehensive system integration capabilities. The primary objectives include enhancing safety and operational efficiency by restricting access to a "Bus Only" area, utilizing advanced technologies such as RFID and real-time location systems (RTLS) for vehicle detection and automated gate control. Bidders must provide detailed architectural and engineering services, develop system integration plans, include backup power systems, and create comprehensive training materials. Pre-bid conferences were scheduled on August 7th, 13th, and 20th, with the final bid submission deadline extended to September 10, 2025, at 3:00 PM through Oregon's e-procurement system OregonBuys. The project involves careful site integration with the existing transit center infrastructure, which features solar panels, electric vehicle charging stations, and a carefully planned circular traffic flow design.

The procurement emphasizes significant participation requirements for Disadvantaged Business Enterprises (DBE) and small businesses, mandating good faith efforts in outreach and documentation. Federal transit assistance funding requires strict compliance with regulations including Buy America provisions and Davis-Bacon wage standards. Five potential bidders have been identified through site walkthrough attendance, including companies like Convergint, Town & Country Fence, Pavlov, Lear Electric Co, Inc., and Metro Access Control. While specific contract compensation is not publicly disclosed, the ITB indicates that total contract compensation will not exceed a predetermined amount, with annual monitoring service costs also capped. The contract term is estimated to run from 2025-2026, with potential maintenance renewal options every five years. Vendors must be registered in the OregonBuys system and prepared to submit comprehensive electronic bid documentation demonstrating technical capability, financial stability, and compliance with all specified procurement guidelines.

Opportunity text

Due Date Changed to 9/10 at 3:00 PM

Files

File Type Posted
BiddersList_Walkthrough1 Attendance 8.13.25.pdf PDF
BiddersList_Walkthrough2 Attendance 8.20.25.pdf PDF
KTC Gate - Pictures_1.pdf PDF
IMG_3706.jpg JPG image
KTC Gate Entry Map.pdf PDF
KTC Gate Entry_Final072425.docx.pdf PDF
Breaded Fish~2.docx DOCX document
Addendum 1_25-003ITB KTCGate.pdf PDF
KTCGate_Tabulation.xlsx XLSX spreadsheet
Addendum 2_25-003ITB KTCGate.pdf PDF
KTC elec drawings.pdf PDF
Show all 11

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity