Double bridges road pathway, muddy neck to neptune drive
Cancelled State & local contract opportunity Posted
- Solicitation number
- T201769009
- State
- Delaware
Opportunity facts
- Jurisdiction
- UNSPSC code
- Point of contact
-
- dot-ask@delaware.gov dot-ask@delaware.gov (302) 760-2031
Opportunity details come from mmp.delaware.gov. Updated .
About this opportunity
The Delaware Department of Transportation is soliciting on a pathway construction project, Double Bridges Road Pathway from Muddy Neck to Neptune Drive in Sussex County, designated as federally-aided project CMAQ-2020(38). Posted September 9, 2026, the solicitation references Contract T201769009 with construction plans, a proposal document, and a business plan holder list available; no explicit proposal deadline is stated in the source.
The scope includes approximately 2.5 miles of pedestrian pathway construction along Double Bridges Road (S363) from Station 2070+65.00 to Station 2109+61.78, with grading, drainage improvements, bituminous and concrete pavement, curb and gutter installation, stormwater management features (bioswales and vegetated channels), pedestrian connections, and site restoration. Drainage specifications include reinforced concrete pipe installations from 12 to 18 inches in diameter; curb installations use both precast concrete and impervious concrete curb-and-gutter types; guardrail installations with specific end treatments; and landscape restoration with topsoil, seed, and mulch. The roadway is classified as a Major Collector with a design speed of 45 miles per hour and current Average Annual Daily Traffic of 3,100 vehicles. All construction must comply with Delaware Department of Transportation Standard Specifications (January 2026) and design standards. Electronic design data files in .DGN format are available to bidders. The contractor must contact the Delaware Traffic Management Center at 302-659-4600 prior to any unmanned aerial vehicle operations.
Proposals must address site preparation, construction sequencing, traffic management during construction, environmental compliance, insurance and bonding provisions, and mobilization planning. No contract value, incumbent contractor, or detailed evaluation criteria are identified in the source materials provided.
Files
| File | Type | Posted |
|---|---|---|
| T201769009 Addendum 2.pdf | ||
| T201769009 Proposal.pdf | ||
| T201769009 Construction Plans.pdf | ||
| T201769009 REVISED Construction Plans.pdf | ||
| T201769009 Addendum 1.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity