T201769009 Addendum 2.pdf
PDF 3 MB Posted
- Solicitation number
- T201769009
- Issued by
- Sussex County, Delaware
About this file
This is Addendum No. 2 to the bid proposal for Contract T201769009, issued by the Delaware Department of Transportation for the Double Bridges Road Pathway project from Muddy Neck to Neptune Drive in Sussex County. The addendum, issued on October 1, 2026, revises three key documents: the Bid Proposal Cover page, the Draft Utility Bar Chart (page 93), and the complete set of Plans (65 pages). The project scope encompasses approximately 2.5 miles of pedestrian pathway construction along Double Bridges Road (S363) from Station 2070+65.00 to Station 2109+61.78, including grading, drainage improvements, bituminous and concrete pavement, curb and gutter installation, stormwater management features such as bioswales and vegetated channels, pedestrian connections, guardrail installations, and site restoration with topsoil, seed, and mulch. Drainage specifications call for reinforced concrete pipe installations ranging from 12 to 18 inches in diameter. Bids were originally due October 6, 2026, with the deadline extended to October 13, 2026. Bidders may submit proposals electronically through BIDX.com/de or as paper bids at the DelDOT Administration Building in Dover, with all bids due prior to 2:00 p.m. local time on the revised deadline.
The project is federally funded under the Congestion Mitigation and Air Quality (CMAQ) program, designated as Federal Aid No. CMAQ-2020(38) with CFDA 20.205. All construction must comply with Delaware Department of Transportation Standard Specifications (January 2026) and applicable design standards. The roadway is classified as a Major Collector with a design speed of 45 miles per hour and current Average Annual Daily Traffic of 3,100 vehicles. Contractors must contact the Delaware Traffic Management Center at 302-659-4600 prior to any unmanned aerial vehicle operations. Electronic design data files in .DGN format are available to qualified bidders. The solicitation was originally advertised on September 9, 2026, with contract administration handled by Kimberly Smith at (302) 760-2031. No contract value, incumbent information, or detailed evaluation criteria are provided in this addendum document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S H A N T É A . H A S T I N G S S e c r e t a r y
VIA WEBSITE POSTING
October 1, 2026
Contract No. T201769009
DOUBLE BRIDGES ROAD PATHWAY, MUDDY NECK TO NEPTUNE DRIVE
Federal No. CMAQ-2020(38)
Prospective Bidders, Enclosed is Addendum No. 2 for the referenced contract consisting of the following:
1. Revised Bid Proposal Cover, to be substituted for the same page of the Proposal.
2. Revised Draft Utility Bar Chart, page 93 to be substituted for the same page of the Proposal.
3. Revised FULL Set of Plans, 65 pgs., to be substituted for the same pages of the Plans.
4. Amendment file is not required for this addendum.
Please note the revisions listed above and attached, and submit bid based upon this information.
Sincerely, ~signature on file~ Kimberly Smith Contract Administration
(302) 760-2031
Contract No. T201769009
DIGITAL ACCESSIBILITY NOTICE
The Delaware Department of Transportation (DelDOT) is committed to ensuring that its digital services, content, and documents are accessible to all users and is actively working to comply with applicable federal and state accessibility requirements. DelDOT continues to make improvements over time, with current efforts focused on programs, applications, content, and documents that are actively in use and available to the public.
Due to the nature and complexity of certain materials, including construction plans, technical drawings, historical documents, maps, and other graphic-intensive files, some documents may not currently be fully digitally accessible or compliant with current accessibility standards. In some cases, these documents are provided for historical, reference, informational, or procurement purposes only.
If you require an accessible version of a document or need assistance accessing any content, please contact DelDOT at (302) 760-2031 or DOT.ask@delaware.gov, and reasonable efforts will be made to provide the information in an accessible format upon request. DelDOT appreciates your patience and understanding as accessibility improvements continue to be implemented.
ADDENDUM 2
October 28, 2026
STATE OF DELAWARE
DEPARTMENT OF TRANSPORTATION
BID PROPOSAL
CONTRACT T201769009
DOUBLE BRIDGES ROAD PATHWAY,
MUDDY NECK TO NEPTUNE DRIVE
Federal Aid No. CMAQ-2020(38)
CFDA: 20.205
Advertisement Date: September 9, 2026
INCLUDED IN THIS DOCUMENT: ADDITIONAL BID PROPOSAL ITEMS:
BID PROPOSAL:
GENERAL DESCRIPTION
PROSPECTIVE BIDDERS NOTES
GENERAL NOTICES
PREVAILING WAGES
SPECIAL PROVISIONS
STATEMENTS
QUANTITY SHEET SUMMARY
ATTACHED OR POSTED DOCUMENTS:
PROJECT PLANS
QUESTIONS & ANSWERS (if posted)
BIDDERS LIST
PAPER BIDDERS CONTACT DELDOT
FOR BID SUBMITTAL DOCUMENTS:
DRUG TESTING AFFIDAVIT
CERTIFICATION FORM
BID BOND FORM
CD FOR BID PRICE ENTRY & PRINTING
BIDDERS LIST
This Bid Proposal and related documents can be viewed on bids.delaware.gov and bidx.com/de/
Internet Bids for Bidders with Bid Express® accounts can be submitted at BIDX.com/de; OR;
Paper Bids with CD will be received in the Bidder's Room at the DelDOT Administration Building, Dover, DE; ALL BIDS DUE PRIOR TO 2:00 P.M. Local Time, OCTOBER 6, 2026 OCTOBER 13, 2026
ADDENDUM 2
October 1, 2026 https://bids.delaware.gov/ https://bidx.com/de/main Kimberly Smith Cross-Out
Utility Statement State Contract No. T201769009 Double Bridges Road Pathway May 7, 2026 ark~
I76~J!l'l'U,ui,{., 8,~&" 11,,,d P>thw,y, M><d,fy trea Rwl ID N'l"Un• Om, T201769009 Double Bridees Road Pathway, Muddy Neck Road to Neptune Drive
DRAFT Utility Bar Chart 7-May-26
**The purpose of this bar chart, and the associated utility work sequencing and duration, is to assist the Contractor in planning their work. The intent is not to provide a source for construction claims.
6 oe/DOT
Mu-ZJ
X
Work Activity wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4
T201769009 Double Bridges Road Pathway, Muddy Neck Road to Neptune
Drive PSE
Partial
NTP
Phase 1
Phase 2
Phase 3
Phase 4
Utility Companies
***Delaware Electric Cooperative
**Mediacom
*Tidewater
*Sussex County **Verizon
Work Activity wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4
T201769009 Double Bridges Road Pathway, Muddy Neck Road to Neptune
Drive
Full
NTP
EP
Phase 1
Phase 2
Phase 3
Phase 4
Utility Companies
***Delaware Electric Cooperative
**Mediacom
*Tidewater 1 2 2 2 2
*Sussex County 1 1 1 2 2 2 2 **Verizon 1 1 1 1 1 2 2 2 2 2 2
Construction Duration
Construction Phasing
1 Advanced Notice to Utility
2 Relocation Work per Utility
** Continued coordination shall be required for field adjustments
No relocations anticipated
Apr-28
ADV AWD
Nov-27 Dec-27 Jan-28 Feb-28 Mar-28Jun-27 Jul-27 Aug-27 Sep-27 Oct-27
Hwy Contractor to perform (schedule to be coordinated between hwy contractor and utility)
Apr-27 May-27
T201769009 Double Bridges Road Pathway, Muddy Neck Road to Neptune Drive
DRAFT Utility Bar Chart
24-Aug-26 Dec-26 Jan-27 Feb-27 Mar-27Jul-26 Aug-26 Sep-26 Oct-26 Nov-26
File details come from the government source that posted it. Updated .