T201769009 Addendum 2.pdf

PDF 3 MB Posted

Attached to
DOUBLE BRIDGES ROAD PATHWAY, MUDDY NECK TO NEPTUNE DRIVE
Solicitation number
T201769009
Issued by
Sussex County, Delaware

About this file

This is Addendum No. 2 to the bid proposal for Contract T201769009, issued by the Delaware Department of Transportation for the Double Bridges Road Pathway project from Muddy Neck to Neptune Drive in Sussex County. The addendum, issued on October 1, 2026, revises three key documents: the Bid Proposal Cover page, the Draft Utility Bar Chart (page 93), and the complete set of Plans (65 pages). The project scope encompasses approximately 2.5 miles of pedestrian pathway construction along Double Bridges Road (S363) from Station 2070+65.00 to Station 2109+61.78, including grading, drainage improvements, bituminous and concrete pavement, curb and gutter installation, stormwater management features such as bioswales and vegetated channels, pedestrian connections, guardrail installations, and site restoration with topsoil, seed, and mulch. Drainage specifications call for reinforced concrete pipe installations ranging from 12 to 18 inches in diameter. Bids were originally due October 6, 2026, with the deadline extended to October 13, 2026. Bidders may submit proposals electronically through BIDX.com/de or as paper bids at the DelDOT Administration Building in Dover, with all bids due prior to 2:00 p.m. local time on the revised deadline.

The project is federally funded under the Congestion Mitigation and Air Quality (CMAQ) program, designated as Federal Aid No. CMAQ-2020(38) with CFDA 20.205. All construction must comply with Delaware Department of Transportation Standard Specifications (January 2026) and applicable design standards. The roadway is classified as a Major Collector with a design speed of 45 miles per hour and current Average Annual Daily Traffic of 3,100 vehicles. Contractors must contact the Delaware Traffic Management Center at 302-659-4600 prior to any unmanned aerial vehicle operations. Electronic design data files in .DGN format are available to qualified bidders. The solicitation was originally advertised on September 9, 2026, with contract administration handled by Kimberly Smith at (302) 760-2031. No contract value, incumbent information, or detailed evaluation criteria are provided in this addendum document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S H A N T É A . H A S T I N G S S e c r e t a r y

VIA WEBSITE POSTING

October 1, 2026

Contract No. T201769009

DOUBLE BRIDGES ROAD PATHWAY, MUDDY NECK TO NEPTUNE DRIVE

Federal No. CMAQ-2020(38)

Prospective Bidders, Enclosed is Addendum No. 2 for the referenced contract consisting of the following:

1. Revised Bid Proposal Cover, to be substituted for the same page of the Proposal.

2. Revised Draft Utility Bar Chart, page 93 to be substituted for the same page of the Proposal.

3. Revised FULL Set of Plans, 65 pgs., to be substituted for the same pages of the Plans.

4. Amendment file is not required for this addendum.

Please note the revisions listed above and attached, and submit bid based upon this information.

Sincerely, ~signature on file~ Kimberly Smith Contract Administration

(302) 760-2031

Contract No. T201769009

DIGITAL ACCESSIBILITY NOTICE

The Delaware Department of Transportation (DelDOT) is committed to ensuring that its digital services, content, and documents are accessible to all users and is actively working to comply with applicable federal and state accessibility requirements. DelDOT continues to make improvements over time, with current efforts focused on programs, applications, content, and documents that are actively in use and available to the public.

Due to the nature and complexity of certain materials, including construction plans, technical drawings, historical documents, maps, and other graphic-intensive files, some documents may not currently be fully digitally accessible or compliant with current accessibility standards. In some cases, these documents are provided for historical, reference, informational, or procurement purposes only.

If you require an accessible version of a document or need assistance accessing any content, please contact DelDOT at (302) 760-2031 or DOT.ask@delaware.gov, and reasonable efforts will be made to provide the information in an accessible format upon request. DelDOT appreciates your patience and understanding as accessibility improvements continue to be implemented.

ADDENDUM 2

October 28, 2026

STATE OF DELAWARE

DEPARTMENT OF TRANSPORTATION

BID PROPOSAL

CONTRACT T201769009

DOUBLE BRIDGES ROAD PATHWAY,

MUDDY NECK TO NEPTUNE DRIVE

Federal Aid No. CMAQ-2020(38)

CFDA: 20.205

Advertisement Date: September 9, 2026

INCLUDED IN THIS DOCUMENT: ADDITIONAL BID PROPOSAL ITEMS:

BID PROPOSAL:

GENERAL DESCRIPTION

PROSPECTIVE BIDDERS NOTES

GENERAL NOTICES

PREVAILING WAGES

SPECIAL PROVISIONS

STATEMENTS

QUANTITY SHEET SUMMARY

ATTACHED OR POSTED DOCUMENTS:

PROJECT PLANS

QUESTIONS & ANSWERS (if posted)

BIDDERS LIST

PAPER BIDDERS CONTACT DELDOT

FOR BID SUBMITTAL DOCUMENTS:

DRUG TESTING AFFIDAVIT

CERTIFICATION FORM

BID BOND FORM

CD FOR BID PRICE ENTRY & PRINTING

BIDDERS LIST

This Bid Proposal and related documents can be viewed on bids.delaware.gov and bidx.com/de/

Internet Bids for Bidders with Bid Express® accounts can be submitted at BIDX.com/de; OR;

Paper Bids with CD will be received in the Bidder's Room at the DelDOT Administration Building, Dover, DE; ALL BIDS DUE PRIOR TO 2:00 P.M. Local Time, OCTOBER 6, 2026 OCTOBER 13, 2026

ADDENDUM 2

October 1, 2026 https://bids.delaware.gov/ https://bidx.com/de/main Kimberly Smith Cross-Out

Utility Statement State Contract No. T201769009 Double Bridges Road Pathway May 7, 2026 ark~

I76~J!l'l'U,ui,{., 8,~&" 11,,,d P>thw,y, M><d,fy trea Rwl ID N'l"Un• Om, T201769009 Double Bridees Road Pathway, Muddy Neck Road to Neptune Drive

DRAFT Utility Bar Chart 7-May-26

**The purpose of this bar chart, and the associated utility work sequencing and duration, is to assist the Contractor in planning their work. The intent is not to provide a source for construction claims.

6 oe/DOT

Mu-ZJ

X

Work Activity wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4

T201769009 Double Bridges Road Pathway, Muddy Neck Road to Neptune

Drive PSE

Partial

NTP

Phase 1

Phase 2

Phase 3

Phase 4

Utility Companies

***Delaware Electric Cooperative

**Mediacom

*Tidewater

*Sussex County **Verizon

Work Activity wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4 wk 1 wk 2 wk 3 wk 4

T201769009 Double Bridges Road Pathway, Muddy Neck Road to Neptune

Drive

Full

NTP

EP

Phase 1

Phase 2

Phase 3

Phase 4

Utility Companies

***Delaware Electric Cooperative

**Mediacom

*Tidewater 1 2 2 2 2

*Sussex County 1 1 1 2 2 2 2 **Verizon 1 1 1 1 1 2 2 2 2 2 2

Construction Duration

Construction Phasing

1 Advanced Notice to Utility

2 Relocation Work per Utility

** Continued coordination shall be required for field adjustments

No relocations anticipated

Apr-28

ADV AWD

Nov-27 Dec-27 Jan-28 Feb-28 Mar-28Jun-27 Jul-27 Aug-27 Sep-27 Oct-27

Hwy Contractor to perform (schedule to be coordinated between hwy contractor and utility)

Apr-27 May-27

T201769009 Double Bridges Road Pathway, Muddy Neck Road to Neptune Drive

DRAFT Utility Bar Chart

24-Aug-26 Dec-26 Jan-27 Feb-27 Mar-27Jul-26 Aug-26 Sep-26 Oct-26 Nov-26