DFCM Construction - Prequalified Paving & Site Civil Stage II - Weber State University - Pavement Maintenance and Repairs - Ogden and Davis Campuses - Project #27275810
Closed State & local contract opportunity Posted
- Solicitation number
- CS26097
- State
- Utah
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from utah.bonfirehub.com. Updated .
About this opportunity
The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids for pavement maintenance and repairs at Weber State University's Ogden and Davis Campuses under Stage II Invitation to Bid Project #27275810, with bids due July 14, 2026. Only contractors prequalified under Stage I Prequalification for Contractors and currently listed on the DFCM Prequalified Contractors list as of the solicitation date are eligible to bid — a restrictive eligibility gate that eliminates all non-prequalified competitors.
The scope encompasses removal and replacement of asphalt across multiple parking lots at both campuses; adjustment of utility manholes, catch basins, and valve boxes to grade with concrete collars; crack sealing; mastic patching; high polymer asphalt surface treatment; and slurry seal application. The approved specifications adopt the 2025 Edition of the APWA Manual of Standard Specifications by reference and establish detailed requirements for concrete mix design (ranging from 2,000 to 5,000 psi compressive strength), testing protocols, placement and curing procedures, and quality assurance including compressive strength verification at seven and twenty-eight days compliant with ACI 214 standards. Performance testing includes laboratory extraction and field verification of wet mil thickness for pavement layers, with a Special Inspector required at commencement and near completion of seal coat work.
The construction cost estimate is $474,000. The project is located at the Ogden and Davis Campuses in Weber County, Utah, with administrative oversight at 4110 State Office Building, Salt Lake City. All three lowest bidders must submit a complete subcontractor list within 24 hours of bid opening; subcontractors with agreements of $20,000 or above must be named with contractor license numbers. Contractors must maintain qualified health insurance coverage as a condition of bid eligibility. Time is of the essence; liquidated damages apply at 0.5 percent of contract price for each day beyond fourteen days after Substantial Completion.
Opportunity text
**Stage II Invitation to Bid** **Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project.** The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the referenced project: **Project Description: Removal & replacement of some asphalt at the Ogden and Davis Campuses, adjust utility manholes, catch basins, and valves boxes to grade with concrete collars. Crack sealing, mastic patching, high polymer asphalt surface treatment and slurry seal.** **Construction Cost Estimate: $474,000.00**