Designing Stormwater Management Solutions to restore Almy Pond's Water Quality
Closed State & local contract opportunity Posted
- Solicitation number
- 2025-UTL-001
- State
- Rhode Island
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 77000000 Environmental Services
- 81103300 Geomatics engineering
- 77110000 Environmental protection
- 81103402 Front-end engineering design services
- 81103403 Detailed engineering services
- 81103405 Onshore engineering procurement and construction services
- 76100000 Decontamination services
- 76130000 Toxic and hazardous waste cleanup
- 81103400 Engineering procurement and project management services
- 81103404 Offshore engineering procurement and construction services
Show all 11
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The Aquidneck Island Land Trust, in collaboration with the Almy Pond Watershed Protectors, is seeking a qualified engineering firm to design comprehensive stormwater management solutions for the 116-acre northeastern drainage area of Almy Pond in Newport, Rhode Island. The primary objective is to develop a stormwater best management practice, potentially a constructed gravel wetland, to treat runoff and reduce nutrient and bacterial pollution. The project aims to address water quality concerns identified in a 2007 Total Maximum Daily Load (TMDL) assessment, which requires an 80-85% reduction in phosphorus levels. Key deliverables include site assessments, development of 2-3 conceptual design options, community engagement, pre-permitting coordination, and preparation of permit-level designs. The RFP was issued on March 7, 2025, with proposals due by April 4, 2025, and an anticipated project kickoff in April/May 2025 and completion by Spring 2026. Evaluation will be conducted using a 100-point scoring system that assesses technical approach, project experience, timeline, and overall proposal quality.
While the RFP does not explicitly specify set-aside designations or restrictions for disadvantaged enterprises, the proposal will be evaluated based on the firm's technical capabilities and prior experience in environmental engineering and stormwater management. No incumbent vendors or existing contractors are mentioned in the documentation. The specific budget and pricing details are not explicitly stated in the available materials, though the comprehensive nature of the project suggests a significant engineering and design investment. The project is funded through a collaboration of nine local organizations and appears to be a critical environmental restoration initiative for the Almy Pond watershed. Prospective bidders should have demonstrated expertise in hydrology, environmental engineering, and stormwater management solutions, with a particular focus on nutrient reduction and water quality improvement strategies.
Files
| File | Type | Posted |
|---|---|---|
| Almy Pond Request for Proposal Feb 2025.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity