The Request for Proposal (RFP) is issued by the Aquidneck Island Land Trust in collaboration with the Almy Pond Watershed Protectors, a coalition of nine local organizations in Newport, Rhode Island. The RFP seeks a qualified engineering firm to design a stormwater management solution for the 116-acre northeastern drainage area of Almy Pond, with the goal of reducing nutrient and bacterial pollution. The project aims to develop a stormwater best management practice, potentially a constructed gravel wetland, to treat runoff before it enters the pond. Key dates include the RFP issuance on March 7, 2025, proposal due date of April 4, 2025, project kickoff in April/May 2025, and anticipated completion in Spring 2026.
The project is driven by water quality concerns, specifically an 80-85% required reduction in phosphorus levels identified in a 2007 Total Maximum Daily Load (TMDL) assessment. The selected firm will conduct site assessments, develop 2-3 conceptual design options, participate in community engagement, coordinate pre-permitting meetings, and prepare permit-level designs. The budget and pricing details are not explicitly stated, but proposals will be evaluated on technical approach, project experience, timeline, and overall quality. The selection will be made based on a 100-point scoring system, with points allocated across technical, experiential, and responsiveness criteria.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal
Designing Stormwater Management Solu ons to Restore Almy Pond’s Water
Quality
Key Dates
Event Date
RFP Issued March 7, 2025
Proposal Due April 4, 2025
Project Kickoff April/May 2025
An cipated Project Comple on Spring 2026
Background
Almy Pond, located in Newport, Rhode Island, is a vital shallow coastal ecosystem suffering from significant water quality degrada on due to stormwater runoff from a 354‐acre densely developed watershed and aging infrastructure. The Rhode Island Department of Environmental
Management (RIDEM) conducted a Total Maximum Daily Load (TMDL) in 2007 of nine eutrophic ponds. Almy Pond was iden fied as having the most severe nutrient impairment due to its high concentra ons of phosphorus, requiring an 80‐85% load reduc on. Toxic cyanobacteria blooms, driven by elevated nutrient levels, render the pond unsafe for recrea onal use. The stormwater runoff also contributes to high bacterial counts, resul ng in beach closures at Bailey’s Beach and
Reject’s Beach, along Newport’s Ocean Drive.
The City of Newport and project partners, to be described below, have conducted stormwater retrofits in recent years, but water quality is s ll impaired. Significant bacteria and nutrient levels persist from iden fied stormwater ou alls, as highlighted by ongoing water quality monitoring conducted by Salve Regina University in coordina on with the Almy Pond
Watershed Protectors.
The Aquidneck Island Land Trust is an ac ve member of the Almy Pond Watershed Protectors, a coali on of nine local organiza ons which includes Salve Regina University, Newport Tree
Conservancy, Newport Preserva on Society, Save The Bay, Spou ng Rock Beach Associa on
Founda on, the Girl Scouts of Southeastern New England, RI Department of Health (RIDOH), and RI Department of Environmental Management (RIDEM). The Protectors are dedicated to improving water quality in Almy Pond and its environs. The City of Newport is also an ac ve and involved partner.
RFP: Designing Stormwater Management Solu ons to Restore Almy Pond’s Water Quality
Loca on
The project seeks to design a solu on, ideally a stormwater best management prac ce such as a constructed gravel wetland, to treat stormwater from the 116‐acre drainage area in the northeast corner of the pond, the largest sub‐catchment area in the Almy Pond watershed.
As iden fied in the TMDL, one of the major sources of phosphorus to Almy pond is stormwater via ou alls that discharge to Almy Pond. Out of the 13 ou alls iden fied discharging to Almy
Pond in the TMDL, Ou all ID: AP‐L was iden fied as the highest priority ou all; it conducts the majority of stormwater runoff from neighborhoods to the north of Almy Pond. This ou all proposed for retrofit has the largest drainage area of the watershed and has been documented by Salve Regina’s 2021‐2024 water quality monitoring as an ongoing source of nutrient and bacteria pollu on.
Scope of Work
The Aquidneck Island Land Trust seeks qualified firms to design a stormwater management system aimed at trea ng and infiltra ng stormwater from the 116‐acre drainage area located at the northeastern sec on of the Almy Pond watershed. Stormwater management best prac ces should be explored for their effec veness in reducing pollutants to the maximum extent feasible. The City owns a parcel where the proposed retrofit would be located that is adjacent to the ou all and has an easement for access and maintenance.
The project team has poten ally iden fied a stormwater retrofit approach: a constructed gravel wetland consis ng of a depression that contains gravel media and soils planted with wetland vegeta on that provides microbial treatment via the roots and microbes present in the saturated zone. Created gravel wetlands are appropriate for sites with a high water table and areas where infiltra on is not an op on.
Work throughout this project will be in collabora on with the project partners included in the
Almy Pond Watershed Protectors, led by the Aquidneck Island Land Trust’s Resilience Team, in addi on to the City of Newport’s Planning and U li es departments.
Project Goals
This project seeks to design a stormwater management solu on that will help to restore Almy
Pond’s water quality, which is part of a larger effort to grow community engagement and understanding of the root causes of water quality concerns.
Design a stormwater management best prac ce, poten ally a constructed gravel wetland, that effec vely removes nutrients and bacteria from stormwater from the northeastern sub‐catchment area before it enters Almy Pond.
o Priori ze most effec ve pollutant treatment and reduc on strategies.
o Include opportuni es to plant na ve species that are resistant to geese (another major source of phosphorus), are low maintenance, and stabilize soil near freshwater sources.
o Consider designs that would allow for future improvement of public access, such as a boardwalk or nature trails.
Required Ac vi es
1. Par cipate in site visit with project partners
2. Conduct data collec on & review; field reconnaissance
Review project site data and records
Conduct a thorough site assessment, which could include:
o Soil test pits and soil samples o Wetland delinea on (in coordina on with in‐kind staff contribu ons from
Save The Bay)
3. Develop 2‐3 conceptual design op ons, with renderings for review by community partners and the public
Include opinion of cost
4. Par cipate in and provide materials for community engagement efforts including one community workshop, led by the Land Trust and Watershed Protectors
5. Coordinate a pre‐permi ng mee ng with regulatory agencies to inform the final design
6. Prepare permit level designs
7. Develop permit applica on for CRMC
Implementa on Plan
The an cipated meline, key milestones, and deliverables for the project term are as follows:
Timeline Milestone Key Deliverable
Spring 2025 Conduct interviews and select engineering firm
Contract with selected engineering firm
Summer 2025 Complete site assessment and conceptual designs
Site Assessment and Conceptual Design
Fall 2025 Develop renderings and a end one public workshop
Presenta on at public workshop
Fall/Winter 2025 Conduct pre‐permi ng mee ng Clearly defined permi ng processes and next steps
Winter 2025‐2026 Develop permit ready designs 60% designs
Spring of 2026 Develop and submit permit applica on
Permit package
Proposal Submission Requirements
Proposals should be succinct and include:
1–2‐page cover le er, including firm qualifica ons and experience in stormwater management solu on projects for environmental restora on
2 – 4 previous project examples that are similar in scope and complexity, including plans to maintain system performance
Proposed methodology and technical approach
Key personnel and their roles in the project
Timeline
Budget
2 – 3 references
Selec on Criteria
Criteria Points
Technical approach 25
Project experience/qualifica ons and references 25
Proposed meline and budget 20
Overall quality and responsiveness 20
Compliance with RFP requirements 10
TOTAL 100
Submission Instruc ons & Contact Informa on
Proposals must be submi ed by email to paige@aquidneckresilience.org by 5 pm on April 4, 2025 with subject line “RFP Submission: Designing Stormwater Management Solu ons to
Restore Almy Pond’s Water Quality”. For ques ons, please contact:
Paige Mya
Director of Climate Resilience
Aquidneck Island Land Trust paige@aquidneckresilience.org