Demolition of 18-span Bridge and Construction of Three PPC Beam Single Span Bridges

Closed State & local contract opportunity Posted

Solicitation number
61M13
State
Illinois
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Kane County Division of Transportation (KDOT) and Illinois Department of Transportation (IDOT) are soliciting bids for demolition of an 18-span Kirk Road bridge and construction of three single-span precast prestressed concrete (PPC) beam bridges, with electronic bids due July 31, 2026 at 12:00 p.m. in the iCX system. This is a Federal-aid construction project subject to prevailing wage, Equal Employment Opportunity (EEO), and Disadvantaged Business Enterprise (DBE) participation requirements under Federal law.

The project scope spans Kirk Road (2,560 feet / 0.485 miles) in the City of Geneva and unincorporated Geneva Township, Kane County, from Cherry Lane north to Illinois Route 38, approximately 5.5 miles north of I-88. Work includes demolition of the existing structure (S.N. 045-3096); construction of three single-span PPC beam bridges carrying Kirk Road over Reed Road (S.N. 045-3133), the Union Pacific Railroad (S.N. 045-3134), and Whites Creek (S.N. 045-3186); mechanically stabilized earth retaining walls; full roadway pavement removal and replacement with addition of a third striped lane; aggregate column ground improvements; traffic signal modernizations; a multiuse path extending from IL Route 38 to Cherry Lane; storm sewer replacement; detention pond construction and modification; earthwork; pavement markings; and landscaping. Utility relocations in two stages (approximately 80 days each) are required, coordinating with ComEd, AT&T, City of Geneva, Nicor Gas, MCI/Verizon, and Comcast. Construction operations are limited to 7 a.m. to 4 p.m. weekdays (or 9 a.m. to 3 p.m., or as directed by Engineer), with night work requiring written approval. Tree removal is prohibited April 1 through September 30. The contractor must protect an existing septic system on the east side of Kirk Road and coordinate with adjacent IDOT Project #175-61J84 (East State Street) and Kane County Cougar game day activities.

The project completion date is October 31, 2028, with 15 working days following for cleanup and punch list work. The contract will be awarded to the lowest responsive and responsible bidder. Bid documents are attached (ildot 61M13-019.pdf, 15 MB).

Opportunity text

This work consists of the demolition of the existing 18 span, 1,376 x 62 Kirk Road bridge (S.N. 045- 3096) and the construction of three single span bridges (S.N. 045-3133 over Reed Road, S.N. 045- 3134 over UPRR, and S.N. 045-3186 over Whites Creek), along with mechanically stabilized earth (MSE) retaining walls. Full roadway pavement removal and replacement will include the addition of a third striped lane, aggregate column ground improvements, traffic signal modernizations, a multiuse path extending from IL Route 38 to Cherry Lane, storm sewer replacement, construction of a detention pond, existing pond modifications, earthwork, pavement markings, landscaping, and all other work necessary to complete the project as shown on the plans and as described herein. Location: The project is located on Kirk Road (FAP 0360) over the Union Pacific Railroad (UPRR), over Whites Creek, and over Reed Road in the City of Geneva and unincorporated Geneva Township, Kane County. The project begins at the intersection of Kirk Road and Cherry Lane and extends northerly to the intersection of Kirk Road and IL Route 38. Kirk Road is under the jurisdiction and maintenance of the Kane County Division of Transportation (KDOT) Cherry Lane is under the jurisdiction of the City of Geneva and IL Route 38 is under the maintenance and jurisdiction of the Illinois Department of Transportation (IDOT). Relative to major expressways, the project is located approximately 5.5 miles north of the I-88 interchange [ 41 5256 N, 88 1640 W] and located in the following Section, Township, Range: Section 1, Township 39N, Range 8E Section 2, Township 39N, Range 8E Section 11, Township 39N, Range 8E Section 12, Township 39N, Range 8E The total gross and net length of the improvement is 2,560.0 feet (0.485 miles).

Files

File Type Posted
ildot 61M13-019.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors