Demolition Buildings Foundations and Utilities Bundle Phase 2-Site Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- PE-76110-NONST-2025-000000095
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 90656 Landscape Architecture
- 91223 Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, Etc.)
- 91394 Paving/Resurfacing, Alley And Parking Lot
- 91430 Concrete
- 91438 Electrical
- 95108 F & Oi Fences
- 96861 Pavement Marking Services (Including Removal Of Markings)
- 98815 Fence Installation, Maintenance And Repair
- UNSPSC codes
- 72101515 Subsidence service work
- 72141130 Ornamental fountain construction and or remodelling service
- 72152700 Concrete installation and repair services
- 72152709 Concrete pumping service
- 72152711 Concrete patio construction service
- 72152908 Smoke stack installation service
- 72152902 Concrete reinforcement placing service
- 72151500 Electrical system services
- 72151524 Industrial electrical service
- 72151501 Lighting installation services
Show all 28
- 72141511 Digging services
- 72152701 Exterior concrete stucco service
- 72152710 Foundation and footing construction service
- 72152907 Precast concrete structural framing panel placing service
- 72151522 Electrical luminary service
- 72151306 Pavement marking service
- 72154027 Posthole digging service
- 72102906 Landscape architecture service
- 81101517 Landscape architecture and design service
- 72101512 Hoist construction service
- 72101513 Offsite construction service
- 72101514 Refuse area construction service
- 72141507 Pile driving service
- 72152702 Grouting service
- 72152703 Gunite installation service
- 72154012 Concrete forms erection and dismantling service
- 72154013 Fence construction service
- 72154069 Fencing and railing service
- Point of contact
-
- Todd Davis todd@sovereigncooper.com (770) 882-6050
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
Fulton County and the Atlanta Independent School System are procuring a comprehensive demolition and site improvement project located at 1701/1707 Metropolitan Parkway in Atlanta, Georgia. The opportunity, designated as Phase 2 of a demolition and utilities bundle, involves redeveloping an area where buildings have been previously removed and converting the space into an extension of an existing school bus parking depot. The project encompasses seven distinct bid packages, including grading, utilities, asphalt paving, landscaping, fencing, pavement markings, concrete, and site electrical work. Bids are required to be submitted electronically by Friday, July 25, 2025, at 3:00 PM, with all potential bidder questions mandated to be submitted by July 10, 2025. Sovereign Cooper, Inc. will manage the construction, with SSOE, Inc. serving as the project architect, and bidders must respond to bids@sovereigncooper.com to confirm their intent to bid and specify their intended scope package. Interested contractors must review comprehensive bid documents available through a provided Dropbox link, which include plans, sample subcontract, bid package details, and scope of work.
While specific set-aside designations or disadvantaged enterprise requirements are not explicitly detailed in the provided documentation, potential bidders are expected to be qualified contractors capable of executing complex infrastructure improvement projects. The project will be managed by Sovereign Cooper, Inc. from Cumming, Georgia, suggesting a regional focus for potential bidders. No incumbent vendors or specific budget ranges are disclosed in the available documentation. The procurement appears to be open to construction firms with demonstrated capabilities in municipal infrastructure development, particularly those with experience in school district-related site improvement and utility work. Electronic submission of bids is mandatory, indicating a preference for technologically capable and administratively organized contractors. While precise award values are not specified, the multi-package nature of the project suggests a substantial infrastructure investment by the Atlanta Independent School System.
Opportunity text
DESCRIPTION OF PROJECT: Phase 2 -redevelop the area in the location where buildings have been removed and convert into an extension of adjacent school bus parking depot (at 1701/1707 Metropolitan Parkway)
Files
| File | Type | Posted |
|---|---|---|
| Instructions to Bidders.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity