Copernicus Hall 5th Floor Door Replacement Project

Open State & local contract opportunity Posted

Solicitation number
2027 03
State
Connecticut
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from webprocure.proactiscloud.com. Updated .

About this opportunity

Central Connecticut State University is soliciting sealed bids under RFQ 2027-03 for removal and replacement of all doors and hardware on the fifth floor of Copernicus Hall in New Britain, Connecticut, with a mandatory walk-through on November 19, 2026 and bids due December 10, 2026 at 10:00 AM. Addendum 1 moved the walk-through from November 23 to November 19, 2026 at 11:00 AM EST at Copernicus Hall, and all other terms remain unchanged. No set-asides are designated for this procurement.

Bids are submitted to the CCSU Purchasing Department in Davidson Hall, room 22802. Award goes to the lowest responsible qualified bidder, based on past performance, integrity, and conformity to specifications, with consideration of affirmative action and equal employment opportunity compliance under Connecticut General Statutes 4a-60 and 4a-60a.

Scope covers removing and replacing existing doors, predominantly solid core prefinished wood with some hollow metal, along with new hardware installed on factory-prepped doors and preparation and painting of door frames. Work must meet ANSI/SDI A250.8 for hollow metal, AWI/AWMAC/WI for wood doors, and ANSI/BHMA A156 Series for hardware. Painting specifies Paint System No. 1 using Sherwin Williams products or equivalent. Named hardware manufacturers include McKinney, Arrow Lock, Sargent, Rockwood, and Norton Door Controls. Persona Locksets must be keyed and programmed by the CCSU Locksmith, which requires a minimum two-week lead time. Asbestos-containing doors must be removed with hinges intact, wrapped in plastic, and placed in a designated container for disposal by others, while the contractor disposes of all non-ACM doors.

A 10 percent bid bond must accompany the proposal, and performance, labor, and material bonds are required. Prevailing wage rates apply per CTsource. A certificate of insurance naming CCSU as additionally insured is mandatory. The contractor must hold all required Connecticut licenses and permits and secure approval of a safety plan from CCSU Environmental Health and Safety before work begins.

Pricing is a lump-sum bid with unit pricing for adds and deducts on Type 2 doors with hardware set #1, FOB Destination, excluding federal excise taxes and Connecticut sales tax. Onsite work cannot occur during active academic semesters except from 10 PM to 6 AM. Permitted windows are Winter Break (December 14, 2026 to January 18, 2027), Spring Break (March 15–21, 2027), and summer (May 17 to August 2, 2027). The contractor must submit a schedule that secures each room daily.

Questions go to Charles Zsebik at 860-832-0041 or charles.zsebik@ccsu.edu.

Opportunity text

Central is seeking vendors to provide services for door replacement services

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors