2027 03_Nov_16_26_solicitation_doc.pdf

PDF 15 KB Posted

Attached to
Copernicus Hall 5th Floor Door Replacement Project
Solicitation number
2027 03
Issued by
Hartford County, Connecticut

About this file

This Request for Quotation (RFQ 2027-03) is issued by Central Connecticut State University for removal and replacement of all doors and hardware on the fifth floor of Copernicus Hall in New Britain, Connecticut. The project encompasses removing existing doors, predominantly solid core prefinished wood with some hollow metal doors, and installing new doors with hardware on factory-prepped units, along with frame preparation and painting. A mandatory walk-through is scheduled for November 19, 2026 at 11:00 AM EST at Copernicus Hall. Sealed bids are due December 10, 2026 at 10:00 AM and should be submitted to the CCSU Purchasing Department in Davidson Hall, room 22802. Award will be made to the lowest responsible qualified bidder based on past performance, integrity, and conformity to specifications, with consideration of affirmative action and equal employment opportunity compliance. The solicitation period runs from November 11, 2026 to December 10, 2026. Onsite work is restricted to Winter Break (December 14, 2026 to January 18, 2027), Spring Break (March 15-21, 2027), and summer (May 17 to August 2, 2027), with work during active academic semesters limited to 10 PM to 6 AM.

Pricing is a lump-sum bid with unit pricing for adds and deducts on Type 2 doors with hardware set #1, FOB Destination, excluding federal excise taxes and Connecticut sales tax. No set-asides are designated for this procurement. A 10 percent bid bond must accompany proposals, and performance, labor, and material bonds are required. Prevailing wage rates apply per Connecticut regulations. The contractor must provide a certificate of insurance naming CCSU as additionally insured, hold all required Connecticut licenses and permits, and secure approval of a safety plan from CCSU Environmental Health and Safety before work begins. Work must meet ANSI/SDI A250.8 for hollow metal doors, AWI/AWMAC/WI for wood doors, and ANSI/BHMA A156 Series for hardware, with painting specified using Sherwin Williams products or equivalent. Persona Locksets must be keyed and programmed by the CCSU Locksmith, requiring a minimum two-week lead time. Asbestos-containing doors must be removed with hinges intact, wrapped in plastic, and placed in a designated container for disposal by others. Inquiries should be directed to Charles Zsebik at 860-832-0041 or charles.zsebik@ccsu.edu.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: 2027 03

Copernicus Hall 5th Floor Door Replacement Project

Request for Quotation (RFQ)

Central Connecticut State Univ.

November 11, 2026 - December 10, 2026

Page:2

General Header Information

This bid has no questions defined.

2027 03

No. 2027 03 Title: Copernicus Hall 5th Floor Door Replacement Project Start Date: November 11, 2026 at 8:00:00 AM EST End Date: December 10, 2026 at 10:00:00 AM EST Vendor Q&A Start Date:

Vendor Q&A End Date:

Estimated Total Value:

Who can respond to this bid? : All Vendors Description: Central is seeking vendors to provide services for door replacement services Delivery Terms: Free On Board Destination Payment Terms: Vendor Specified Contact Information: Central Connecticut State Univ.

Charles Zsebik 1615 Stanley Street New Britain CT, 06050 United States Tel: 860-832-0041 Fax:

charles.zsebik@ccsu.edu

Contact Details: If you have any questions, please contact:

Charles Zsebik 1615 Stanley Street New Britain CT, 06050 United States Tel: 860-832-0041 Fax:

charles.zsebik@ccsu.edu

Selected Categories:

Page:3

Documents:

2023 03 COPERNICUS HALL 5TH FLOOR DOOR REPLACEMENT BID DOCUMENTS.pdf

2027 03 Copernicus Hall 5th Floor Door Replacement Project.pdf

2027 03 Prevailing Wages.pdf

2027 03 Addendum 1.pdf

Page:4

Item Specifications Solicitation has been designated as having no line items.

Page:5

File details come from the government source that posted it. Updated .