The Illinois Department of Transportation (IDOT) District 1 is soliciting bids for construction of a three-span PPC IL Beam bridge replacement on Harmony Road over Coon Creek in unincorporated McHenry County, with electronic bids due November 6, 2026 at 12:00 p.m. via the iCX-Integrated Contractors Exchange system. DBE participation requirements are incorporated into the contract.

The scope includes removal of existing pavement and replacement with full-depth hot-mix asphalt, storm sewer and structures, removal of existing Structure Number 056-3138 and replacement with proposed Structure Number 056-3062, a proposed retaining wall, pavement markings, and landscaping. The project is located approximately 0.3 miles east of the intersection of Harmony Road and Payne Road on the section line of Sections 22 and 27, Township 43 North, Range 5 East, Riley Township. The total project length is 816 feet (0.155 miles).

Work must be sequenced to accommodate utility relocations by AT&T, ComEd, and Everstream during Stage 1 (estimated 63 days for new-line installation). Tree removal is subject to northern long-eared bat protections: removal of trees 3 inches or greater in diameter at breast height is prohibited between April 1 and September 30 of any construction year. The contractor must complete tree removal by March 30, 2027 and has three working days for tree removal operations.

Overall project completion is October 30, 2027, with an allowance of ten working days following completion for cleanup and punch-list work. The contractor assumes responsibility for normal maintenance of all existing roadways within project limits beginning on the date work commences. The contract is awarded to the lowest responsive and responsible bidder. The contract incorporates IDOT standard specifications (adopted January 1, 2022, revised January 1, 2026), Illinois Manual on Uniform Traffic Control Devices standards, apprenticeship initiatives, equipment and personnel certification requirements, SWPPP requirements, and U.S. Army Corps of Engineers permit compliance.

Opportunity text

The work consists of removing the existing pavement and replacing it with full-depth hot-mix asphalt pavement, pavement markings, landscaping, storm sewer and structures, removal of existing three span Structure Number 056-3138 and replacement with proposed three span Structure Number 056-3062, proposed retaining wall, and other miscellaneous items to be constructed along the length of the project in accordance with the Drawings, Standard Specifications, and these Special Provisions for furnishing all labor, materials, equipment, and other incidentals necessary for completion of the project as shown on the plans and described herein. Location: The project is located along Harmony Road over Coon Creek in unincorporated McHenry County, approximately 0.3 miles east of the intersection of Harmony Road and Payne Road. The total gross and net length of the improvement is 816 ft (0.155 miles). Harmony Road is on the section line of Sections 22 and 27, in Township 43 North, Range 5 East, in Riley Township.

Files

File Type Posted
ildot 61M72-032.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors