Construction of a Single Span PPC Deck Beam Bridge Carrying Farrell Rd. over Spring Creek

Open State & local contract opportunity Posted

Solicitation number
61M06
State
Illinois
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Illinois Department of Transportation (IDOT) is requesting bids on construction of a single-span precast prestressed concrete deck beam bridge replacing an existing structure carrying Farrell Road over Spring Creek in Will County, with bids due November 6, 2026 at 12:00 p.m. via the iCX electronic system. The project is federally funded, triggering Disadvantaged Business Enterprise (DBE) participation requirements and prevailing-wage and federal-employment-practice compliance.

The scope encompasses removal of the existing concrete deck beam structure on concrete abutments and replacement with a single-span PPC deck beam on pile bent abutments, plus approximately 400 feet of full-depth hot-mix asphalt pavement reconstruction, earthwork, pipe culverts, guardrail installation, and incidental work. The project is located 550 feet north of U.S. Route 6 in Joliet and New Lenox Townships, extending north for 450 feet (0.085 miles). Farrell Road will be closed to all traffic during construction. Contractors must coordinate with Nicor Gas for gas line relocation, anticipated to require approximately 10 days beginning in September 2026. Traffic control and protection provisions mandate two changeable message signs positioned two weeks before construction begins. Hot-mix asphalt work requires mixture-design verification, Hamburg wheel and I-FIT testing, and quality control managed by certified technicians. The project incorporates extensive NPDES stormwater compliance, wetland protection, and erosion control (perimeter barriers, ditch checks, inlet protection, temporary seeding, and mulch).

The contract completion date is August 2, 2027, with 15 working days allowed thereafter for cleanup and punch-list items. IDOT will award to the lowest responsive and responsible bidder and reserves the right to reject all proposals and re-advertise. No contract value is specified in the source.

Opportunity text

This project consists of removing the existing single span concrete deck beam structure on concrete abutments carrying Farrell Road over Spring Creek and replacing with a single span PPC deck beam structure on pile bent abutments. Also included is approximately 400 feet of roadway work consisting of full depth HMA pavement reconstruction, earthwork, pipe culverts, guardrail and all other incidental and collateral work necessary to complete the project as shown on the plans and described herein. Location: This project is located in Section 1 of Township 35 North, Range 10 East of the Joliet Township and in Section 6 of Township 35 North, Range 11 East of the New Lenox Township, both of the 3rd Principal Meridian in Will County. The project begins along Farrell Road, 550 feet north of U.S. Route 6 and extends north for 450 feet (0.085 miles).

Files

File Type Posted
ildot 61M06-025.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors