Construction Inspection & Testing Services For County Of Morris's K-9 Facility
Closed State & local contract opportunity Posted
- Solicitation number
- P26-174
- State
- New Jersey
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Anthony Aponte aaponte@co.morris.nj.us (973) 285-6332
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Morris County, New Jersey is soliciting construction inspection and testing services for its K-9 Training Facility, with responses due November 24, 2026. The opportunity was posted November 12, 2026, and the solicitation is identified as P26-174.
The services cover construction of a one-story pre-engineered building, but not limited to the following: kennel runs for 14 dogs, a specialized HVAC system with provisions for animal dander and fur, and a retaining wall of up to 8 feet high. Interior spaces include a training room, utility and maintenance rooms, storage areas, toilet rooms, offices, a dog grooming room, and a laundry room. Exterior finishes are pre-engineered metal panels. Interior work includes wall panels, acoustical treatments, other ceiling, wall, and floor finishes, and millwork. Footings and foundations must follow geotechnical engineer recommendations and structural drawings. The project also requires interior and exterior signage and the installation, coordination, and final power connections for furniture, fixtures, and equipment.
Opportunity text
The Work consists of construction of but not limited to the following: 1) 1-story pre-engineered building. 2) Kennel runs for 14 dogs 3) Special HVAC system that includes provisions for animal dander and fur 4) Up to 8 high retaining wall. 5) Interior spaces consist of but not limited to, training room, utility spaces, maintenance rooms, storage areas, toilet rooms, office areas, dog grooming room, and laundry room. 6) Exterior finishes consist of pre-engineered metal panels 7) Interior and exterior signage. 8) Footings and foundations in accordance with Geotechnical engineers recommendations and Structural drawings. 9) Interior finishes consist of but not limited to, wall finish panels, acoustical panels / treatments, all other ceiling, wall and floor finishes. 10) Millwork. 11) Installation, coordination and final power connections for all furniture, fixtures and equipment including furniture.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity