Cogen no. 3 60, 000 hour overhaul project - rebid

Closed State & local contract opportunity Posted

Solicitation number
BCUA-26-C221-R1
State
New Jersey
Responses due

Opportunity facts

Jurisdiction
NIGP codes
UNSPSC codes
Show all 15

Opportunity details come from co-bergen-nj.bonfirehub.com. Updated .

About this opportunity

Bergen County Utilities Authority (BCUA) is soliciting bids on the supply, installation, testing, and commissioning of a re-manufactured cogeneration generator to replace the existing Cogeneration Unit No. 3 at the Little Ferry Wastewater Treatment Plant under Contract No. C221, with proposals due August 20, 2026.

The scope requires a re-manufactured Jenbacher (INNIO) cogeneration unit identical to the existing installation — a JMS 420 GS-N/B.L, 1419 kW, 4.16 kV, spark-ignited, turbo-supercharged, twenty-cylinder V-block alternator and engine — along with in-kind replacement, installation, testing, and commissioning. The existing unit must remain operational until the new unit is ready for handoff. This is a rebid of the same scope originally issued as Contract C221.

No estimated contract value, contract term, incumbent contractor, evaluation criteria, or additional procurement timeline detail is provided in the source.

Opportunity text

The rebid project (Contract No. C221) requires the supply, installation, testing, and commissioning of a re-manufactured Jenbacher (INNIO) cogeneration generator (alternator and engine) to replace, in-kind, the existing Cogeneration Unit No. 3 - an INNIO (formerly General Electric) Jenbacher JMS 420 GS-N/B.L, 1419 kW, 4.16 kV, spark-ignited, turbo-supercharged, twenty-cylinder V-block unit - at the BCUA's Little Ferry Wastewater Treatment Plant.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity