Opportunity details come from bidnetdirect.com. Updated .

About this opportunity

Macomb County Public Works Office is seeking qualified contractors for the Clinton River Spillway Weir SCADA Implementation for Climate Resiliency project, located in Harrison Township, Michigan. The procurement is a Qualification Based Selection (QBS) process with electronic bid submissions originally planned, but later modified to require physical delivery to the Chapaton Pump Station by 2:00 pm on March 14, 2024. The project involves implementing a comprehensive Supervisory Control and Data Acquisition (SCADA) system, which includes installing two stilling wells with level sensors, a new PLC control panel with CompactLogix processor, indoor and outdoor security cameras, LED lighting, an electric unit heater, and modifications to existing pneumatic controls. Bidders will be evaluated using a point-based scoring methodology: 30 points for overall firm experience, 50 points for experience with Macomb County and MCPWO, 10 points for cost, and 10 points for project completion capability. Required submissions include a bid form, bid bond, debarment certification, Iran Linked Business Certification, and a completed Bidders Qualifications form.

The project is funded through an EGLE State High Water Infrastructure Grant and is subject to Davis-Bacon prevailing wage requirements, which may impact contractor eligibility. While no specific set-aside designations for disadvantaged enterprises were explicitly mentioned, contractors must demonstrate technical capability, relevant experience, and financial stability. The existing spillway infrastructure will require integration with the new SCADA system, with specific programming, access control, and camera integration to be performed by the owner (MCPWO). Bidders must comply with federal labor standards provisions and provide detailed documentation of their qualifications. Though a specific budget range was not disclosed, the comprehensive technical requirements and the use of grant funding suggest a significant investment in modernizing the spillway weir control systems to enhance climate resilience. Interested contractors should carefully review the bid documents, particularly Addendum No. 1, which modified the original submission guidelines.

Files

File Type Posted
20240224_Bid_Book_Issued_for_Bids.pdf PDF
20240222_Plans_Issued_For_Bids.pdf PDF
20240306_Addendum_1.pdf PDF