City of Huntsville Streets Concrete & ADA Upgrades FY2025 Phase 3
Closed State & local contract opportunity Posted
- Solicitation number
- 47-2025-55
- State
- Alabama
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 210 Concrete And Metal Products, Culverts, Pilings, Septic Tanks, Accessories And Supplies
- 745 Road And Highway Building Materials, Asphaltic
- 750 Road And Highway Building Materials, Non Asphaltic
- 755 Road And Highway Asphalt And Concrete Handling And Processing Equipment
- 912 Construction Services, General, Including Maintenance And Repair Services)
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 929 Equipment Maintenance And Repair Services For Agricultural, Construction, Heavy Industrial, Material Handling, And Road And Highway Equipment
- 967 Production And Manufacturing Services
- 968 Public Works And Related Services
- UNSPSC codes
- 30121700 Road and railroad construction materials
- 73120000 Metal and mineral industries
- 73000000 Industrial Production and Manufacturing Services
- 30121707 Noise protection board
- 22101628 Aggregate washer
- 72140000 Heavy construction services
- 73160000 Machinery and transport equipment manufacture
- 73170000 Manufacture of electrical goods and precision instruments
- 73110000 Wood and paper industries
- 70170000 Water resources development and oversight
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The City of Huntsville is seeking a qualified contractor to perform comprehensive street infrastructure improvements through the Streets Concrete & ADA Upgrades FY2025 Phase 3 project (Bid #47-2025-55). The procurement involves upgrading and repairing fifty streets within Madison County, Alabama, with a total construction timeline of 280 calendar days. Specific deliverables include replacing driveway aprons, sidewalks, crossdrains, curb and gutter sections, and installing 56 Type 1 Parallel Corner handicap ramps with ADA-compliant detectable warning pavers. Bidders must possess a valid Alabama General Contractor's License with either a Highway & Streets (HS) or Municipal & Utility (MU) classification. The city will evaluate bids based on the lowest responsive and responsible bidder, considering factors such as price, specification conformity, financial capacity, and previous performance. Key dates include a pre-bid conference on May 13, 2025, at 10:00 AM CST and bid opening on May 20, 2025, at 2:00 PM CST, with bidders required to submit a 5% bid bond not exceeding $10,000.
Contractors must provide performance and payment bonds for 100% of the contract price and a certificate of insurance. The contract term is one year from the award date, with potential extensions for two additional one-year periods. While no specific set-aside designations for disadvantaged enterprises are explicitly mentioned, the bid documents indicate a comprehensive evaluation process that considers multiple factors beyond price. The project requires contractors to provide all necessary labor, materials, and equipment for concrete and ADA improvements, with specific technical requirements including mandatory use of flowable fill, cold, or hot asphalt mix for backfill, and complete site restoration. Although the current bid sheet shows placeholder pricing, the project represents a significant infrastructure investment focusing on accessibility improvements and street rehabilitation in the Huntsville area. While a precise budget range is not specified, the extensive scope of work involving fifty streets and multiple infrastructure upgrades suggests a substantial municipal investment in urban infrastructure maintenance and accessibility.
Opportunity text
Upgrading and repairing fifty (50) streets in accordance with details, specifications, and general requirements of the City of Huntsville. The purpose of this bid is to provide for the expedient construction of resurfacing projects as designated by the City of Huntsville, utilizing unit prices for the commonly performed contractor work items. Construction of these projects is intended to be performed within 280 calendar days with the work beginning and ending on dates selected by the City of Huntsville.
Files
| File | Type | Posted |
|---|---|---|
| App C Supplement - Streets Concrete _ ADA Upgrades FY25 P3.xlsx | XLSX spreadsheet | |
| Project Manual - Phase 3 Streets Concrete and ADA Upgrades.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity