City of Harlem, Georgia Shady Grove Paving Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66205-NONST-2026-000000005
- State
- Georgia
- Responses due
Opportunity facts
- NIGP codes
- Point of contact
-
- Mandy Soares msoares@turnipseed.com (706) 863-8800
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Harlem, Georgia is procuring paving improvements for the Shady Grove project, which encompasses patching, overlay installation, restriping, and traffic control services. The scope of work includes the application of 1,792 tons of recycled asphalt concrete 9.5 mm Superpave material, 2,169 gallons of bituminous tack coat, and associated appurtenances necessary to complete the project. Bidders must be capable of completing all construction work within a strict timeframe of 90 consecutive calendar days from project commencement. The opportunity was posted on April 28, 2026, with a submission deadline of May 29, 2026. Qualified contractors should possess experience in asphalt overlay operations, traffic control management, and roadway restriping to meet the technical requirements of this municipal infrastructure project.
The procurement document does not specify set-aside designations for disadvantaged enterprises, minority-owned businesses, or other restricted categories of respondents at this time. No incumbent vendors, current contractors, or existing infrastructure integration requirements are identified in the available documentation. The budget range or award value for this paving improvements contract has not been disclosed in the posted opportunity materials. Interested contractors should contact the City of Harlem, Georgia directly for additional details regarding bonding requirements, insurance specifications, equipment qualifications, and any other technical or administrative prerequisites for bid submission and project execution.
Opportunity text
Paving improvements consisting of patching, overlay with 1,792 tons of recycled asphalt concrete 9.5 mm Superpave, 2,169 gallons of bitum tack coat, restriping, traffic control, and appurtenances. Time allotted for construction is 90 consecutive calendar days for completion.