The City of Adairsville, Georgia is soliciting bids for purchase and installation of a 75 horsepower backwash pump at the municipal water treatment facility, with proposals due November 3, 2026.

The scope includes a complete backwash pump system providing redundancy at the existing water plant. Work encompasses construction of a concrete pad with anchoring and dowelling to the existing floor; provision, installation, and coordination of piping, fittings, and valves to connect to the existing backwash system; addition of a check valve on the existing backwash line; electrical wiring from motor to control panel (existing conduit in place); system startup, testing, and operator training; and all material, labor, tools, equipment, and miscellaneous items necessary for a fully operational installation. SCADA system integration will be coordinated by the owner with their existing system integrator and funded through a separate allowance item, not included in the pump installation contract.

The advertisement does not specify contract value, incumbent contractor, evaluation criteria, pre-bid or site-visit dates, question deadline, or other procurement timeline details beyond the November 3 proposal due date. Interested parties should contact the City of Adairsville directly for complete procurement procedures, bid submission requirements, and scheduling information.

Opportunity text

The Project includes all material, labor, and related appurtenances for the purchase and installation of a 75Hp Backwash Pump at the existing Water Plant for use as an additional Water Plant Backwash Pump, providing redundancy at the facility. The Work also includes building a concrete pad for the pump and motor (with appropriate anchoring/dowelling to the existing concrete floor); the provision, install, and coordination of associated piping, fittings, and valves to connect to the existing Backwash System; addition of a check valve on existing backwash line; electrical wiring from the motor to the control panel (conduit pipe already in place); start up and testing of the system after installation; training for system use; all material, labor, tools, equipment, and any other miscellaneous items necessary for a complete, working, additional Backwash Pump at the Water Plant. SCADA system integration will be coordinated by Owner with their existing system integrator and paid for through the Allowance Item.

Files

File Type Posted
Water Plant Backwash Pump Advertisement For B.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors