City Center Stage Modification
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66456-NONST-2026-000000008
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 72153507 Construction site haul away service
- 72152704 Curb construction service
- 95121511 Park
- 30151903 Structural canopy
- 30241704 Polyvinyl fluoride structure membrane structure
- 72141102 Land grading service
- 95121516 Artificial rock and rockwall
- 30241700 Tent and membrane structure framing and covering components
- 30241702 Portable structure canvas section
- 30241703 Polytetrafluoroethylene membrane structure
Show all 21
- 72153900 Building site preparation services
- 95121633 Culvert
- 72103305 Drain laying service
- 72141120 Sewer line construction service
- 30151902 Canopy
- 30241701 Framing beam or rail or tubing
- 72153505 Construction site clean up service
- 72141123 Manhole construction service
- 72141129 Park and garden construction and or remodelling service
- 95121515 Artificial water fall
- 95121508 Childrens play area or playground
- Point of contact
-
- Gary Sanders gsanders@eatontonga.us (706) 485-3311
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Eatonton is soliciting competitive bids for the construction of the City Center Stage Modification project (SE # 2022-213) located in Polk County, Georgia. This construction procurement involves the relocation of an existing drainage pipe, installation of wall seating, concrete walkways and steps, a synthetic turf seating area, and sun shades to cover the seating area. The project has an expected duration of 100 days, and bids will be received at Eatonton City Hall, 201 N. Jefferson Ave, Eatonton, GA 31024, until Thursday, March 5th, 2026 at 2:00 p.m. local time, at which point bids will be publicly opened and read. A pre-bid conference is scheduled for Thursday, February 19th, 2026 at 2:00 p.m. at Eatonton City Hall; attendance is encouraged but not required. Bidding documents are available for purchase from P.C. Simonton Engineering, LLC in multiple formats: full-size or half-size printed drawings at $150 each, or PDF format on compact disc at $50. Bidding documents are also available for public inspection at Eatonton City Hall, Dodge Data and Analytics, ConstructConnect, and Construction Network.
An American Iron and Steel (AIS) requirement applies to this project under Section 746 of Title VII of the Consolidated Appropriations Act of 2017, mandating that all iron and steel products used must be produced in the United States, with applicable waivers available for de minimis components, minor components, and pig iron and direct reduced iron. No specific set-aside designations for disadvantaged enterprises or targeted vendor categories are mentioned in the procurement documents. No incumbent vendors or current contractors are identified for this project. The City of Eatonton anticipates that the project's total bid price will be approximately $250,000, which represents the budget range for this construction endeavor.
Opportunity text
The City of Eatonton (Owner) is requesting Bids for the construction of the following Project: City Center Stage Modification SE # 2022-213 Bids for the construction of the Project will be received at the Eatonton City Hall located at 201 N. Jefferson Ave, Eatonton, Ga 31024, until Thursday, March 5th, 2026 at 2:00 p.m. local time. At that time the Bids received will be publicly opened and read. The Project includes the following Work: The Project will include relocation of an existing drainage pipe, installation of wall seating, concrete walkways and steps, synthetic turf seating area, and sun shades to cover the seating area. Bids are requested for the following Contract: City Center Stage Modification/SE # 2022-213 Owner anticipates that the Project¿s total bid price will be approximately Two Hundred and Fifty Thousand ($250,000) Dollars. The Project has an expected duration of 100 days.
Files
| File | Type | Posted |
|---|---|---|
| CityofEatonton 3x10_5 City Center Stagepdf.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity