- The Kansas Department of Transportation (KDOT) is requesting electronic bids for milling and hot mix asphalt overlay work on US-36 in Cheyenne County from the Colorado/Kansas state line to Road 11, spanning 10.150 miles, with proposals due September 16, 2026 at 1:00 p.m. Local Time via Bid Express and bids to be opened at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified with KDOT and must identify themselves as bid holders on KDOT's...
- Kansas Department of Transportation is requesting bids for Ultrathin Bonded Asphalt Surface (UBAS) and chip seal work on US-36 in Jewell County, with electronic proposals due September 16, 2026 at 1:00 p.m. local time through Bid Express. Contractors must be prequalified with KDOT and must notify the department of intent to bid by 5:00 p.m. on the Monday preceding the letting date. The scope spans 5.624 miles of US-36 from 4.632 miles east of the US-36/K-14 East Junction to the Jewell/Republic...
- The Kansas Department of Transportation is requesting bids on milling and hot mix asphalt overlay work on US-36 in Decatur County spanning 10.974 miles from the Rawlins/Decatur County line east to the US-36/US-83 junction under contract KA 8054-01, with proposals due September 16, 2026 at 1:00 PM local time. Bidding is restricted to prequalified contractors. Contractors must notify KDOT of intent to bid by 5:00 PM on the Monday preceding the letting date and submit electronic proposals through...
- The Kansas Department of Transportation is requesting bids for milling and Hot Mix Asphalt overlay work on US-36 in Rawlins County, with proposals due September 16, 2026 at 1:00 p.m. local time via Bid Express. This is a federally funded Federal-Aid Highway Program project. The scope covers 16.216 miles of US-36 from the east end of Portland Cement Concrete Pavement in Atwood east to the Rawlins/Decatur County line (project KA 8053-01). Work includes milling of 39,802 tons, HMA overlay of 33,200...
- The Kansas Department of Transportation is soliciting competitive bids for chip seal surface treatment on US-73 (KA 8127-01) in Atchison County, with bids due September 16, 2026. The project extends 12.28 miles from 0.2 miles north of Millwood Road north to the Atchison/Leavenworth county line. The scope is chip seal application on a state highway segment. Bidders must be qualified contractors capable of performing chip seal work to the specifications outlined in the bid documents. The source...
- The Kansas Department of Transportation is requesting bids for milling and hot mix asphalt overlay on K-266 in Republic County, spanning 7.541 miles from the K266/US36 Junction north to the North Route Terminus, with proposals due September 16, 2026 at 1:00 p.m. Local Time through the Bid Express website and bid opening at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified with KDOT and possess a current Tax Clearance Certificate from the...
- The Kansas Department of Transportation (KDOT) Bureau of Construction and Materials is requesting bids on an Ultra-Thin Asphalt Bonded Surface (UBAS) project on K-14 in Jewell County, with proposals due September 16, 2026 at 1:00 p.m. local time via electronic submission through Bid Express, and bids opening at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified with KDOT and possess a current Kansas Department of Revenue Tax Clearance...
- The Kansas Department of Transportation is requesting electronic bids for grading and bridge construction over Ladder Creek in Wallace County, 3.5 miles south and 3.0 miles east of Weskan, with proposals due September 16, 2026 at 1:00 p.m. local time through Bid Express. The project is federally funded through the Federal Aid Highway Program and requires prequalified contractors only; intent to bid must be submitted by 5:00 p.m. on the Monday preceding the letting date. The scope includes...
- <p>Wabaunsee County, Kansas is requesting bids for scrub and chip seal treatment on K-31 highway from the K-99/K-31 Junction to the East Osage/Wabaunsee County Line, with bids due September 16, 2026. The project spans 10.01 miles of road surface treatment within Wabaunsee County.</p> <p>The bid notice is attached. Interested bidders should review the notice for specifications, technical requirements, contract terms, bidding procedures, and any pre-bid meeting or site visit details.</p>
- The Kansas Department of Transportation, procured through the Kansas Department of Administration's Office of Procurement and Contracts, is requesting quotes for traffic control services on US 81 in Caldwell, Kansas from the South City Limits to the North side of Sixth Avenue, with proposals due September 29, 2026 at 2:00 p.m. CST. The scope requires installation, maintenance, and removal of temporary traffic signals, work zone signage, channelizers, temporary striping, rumble strips, and...
The Kansas Department of Transportation is requesting bids on chip seal surfacing for US Route 36 in Washington County, spanning 9.176 miles from the eastern city limits of Washington to the Little Blue River Bridge, with proposals due September 16, 2026 at 1:00 p.m. local time. Contractors must be prequalified with KDOT and hold a current Tax Clearance Certificate from the Kansas Department of Revenue. Bidders must notify KDOT of intent to bid as a prime contractor by 5:00 p.m. on the Monday preceding the letting date. Electronic proposals are submitted through Bid Express at http://ui.bidx.com using AASHTO Project Bids software; bids will be opened and read on a conference call at 3:00 p.m. local time on September 16. The scope includes emulsified asphalt (CRS-1HP) application at 297 tons, cover material (CM-L-2) placement totaling 1,386 cubic yards, chip seal manipulation across 482 stations, installation of flexible raised pavement markers (4-inch, broken at 3-foot intervals) across 482 stations, and traffic control measures. The contract allows 10 restricted working days to open the project to unrestricted traffic and 20 total contract working days for completion. The earliest start date is May 31, 2027, and the latest start date is August 17, 2027. Bid line items include lump-sum mobilization and traffic control, flagging services at $30.00 per hour, and water for flexible pavement at $40.00 per million gallons. The project is funded entirely by state funds. The contract must be executed within 10 business days after award notification. All bidding documents, special provisions, standard specifications, and plans are available on KDOT's website and through Bid Express.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Bid Notice-Chip Seal - Washington County.pdf | 7MB | 9/7/26 |