Bid Notice-Chip Seal - Washington County.pdf
PDF 7 MB Posted
- Attached to
- Chip Seal - Washington County State and local contract opportunity
- Solicitation number
- 526096242
- Issued by
- Stevens County, Kansas
About this file
This is a Bid Notice and Contract Proposal issued by the Kansas Department of Transportation (KDOT) Bureau of Construction and Materials for a chip seal construction project in Washington County. The project involves applying chip seal surfacing to US Route 36 from the eastern city limits of Washington to the Little Blue River Bridge in Washington County, covering a total length of 9.176 miles. The work includes emulsified asphalt application, cover material placement, flexible raised pavement markers, and traffic control measures. The letting date is September 16, 2026, with proposals due by 1:00 p.m. Local Time on that date. The contract allows for 10 restricted working days to open the project to unrestricted traffic and 20 total contract working days for project completion, with an earliest start date of May 31, 2027, and latest start date of August 17, 2027. Electronic internet proposals must be submitted through the Bid Express website at http://ui.bidx.com using AASHTO's Project Bids software, with bids opened and read on a conference call at 3:00 p.m. Local Time on the letting date. Contractors must notify KDOT of their intent to bid as a prime contractor by 5:00 p.m. on the Monday preceding the letting date.
The project is funded entirely by state funds administered by KDOT. The bid tabulation shows limited line items with set pricing for specific components: mobilization and traffic control are bid items without unit prices listed, a flagger position is set at $30.00 per hour, emulsified asphalt (CRS-1HP) for seal coating is required at 297 tons, cover material (CM-L-2) totals 1,386 cubic yards, chip seal manipulation spans 482 stations, flexible raised pavement markers (4-inch broken at 3-foot intervals) cover 482 stations, and water for flexible pavement is set at $40.00 per million gallons. Contractors must be prequalified with KDOT, obtain a current Tax Clearance Certificate from the Kansas Department of Revenue, and comply with multiple required contract provisions including certifications for noncollusion, financial prequalification, and federal fund restrictions. The contract must be executed within 10 business days after award notification. All bidding documents, special provisions, standard specifications, and plans are available on KDOT's website and through the Bid Express system.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dwight D. Eisenhower State Office Building 700 S.W. Harrison Street Topeka, KS 66603-3745
Phone: 785-296-3576 Hearing Impaired - 711 publicinfo@ksdot.org http://www.ksdot.org
Bureau of Construction and Materials
STATE PROJECT NUMBER: U036-101 KA 8125-01
CALL ORDER NUMBER: 624
PROPOSAL NUMBER: 526096242
LETTING DATE 09/16/2026
COUNTY: WASHINGTON
FUND TYPE: STATE
JUNCTION CITYKDOT CONSTRUCTION OFFICE:
PROJECT DESCRIPTION
CHIP SEAL. US36; FR ECL WASHINGTON TO LITTLE BLUE RIVER BR
IN WS CO. LGTH 9.176 MI.
RESTRICTED DAYS
(10)
TOTAL CONTRACT DAYS
(20)
MAY 31, 2027
AUGUST 17, 2027
Earliest Start Date:
Latest Start Date:
9:45:23AM8/19/2026 @
Letting 09/16/2026 Kansas Department of Transportation Project No. U036-101 KA 8125-01
Contract No. 526096242
U036-101 KA 8125-01 U036-101 KA 8125-01
CONTRACT PROPOSAL
DOT Form No. 202 Rev. 02/19
Contract ID: 526096242
1. The Secretary of Transportation of the State of Kansas [Secretary] will accept only electronic internet proposals from prequalified contractors for construction, improvement, reconstruction, or maintenance work in the State of Kansas, said work known as Project No.:
U036-101 KA 8125-01 / U036-101 KA 8125-01
The general scope, location and net length are:
CHIP SEAL. US36; FR ECL WASHINGTON TO LITTLE BLUE RIVER BR
IN WS CO. LGTH 9.176 MI.
2. This is the Proposal of
[Contractor] to complete the Project for the amount set out in the accompanying Unit
Prices List.
3. The Contractor makes the following ties and riders as part of its Proposal in addition to state ties, if any:
4. Contractors and other interested entities may examine the Bidding Proposal Form/
Contract Documents (see paragraph 11 below) at the County Clerk's Office in the County in which the Project is located and at the Kansas Department of Transportation [KODT] Bureau of Construction and Materials, Eisenhower State Office Building, 700 SW Harrison, Topeka, Kansas 66603. Contractors may examine and print the Bidding Proposal Form/Contract
Documents by using KDOT's website at http://www.ksdot.gov and choosing the following selections: "Doing Business", "Highway Contractors" and "Highway Letting Information",and using the links provided in the Project information for this project. KDOT will not print and mail paper copies of Proposal Forms. Contractors shall notify KDOT of their intent to bid as a prime contractor by identifying themselves as a Bid Holder on the website above.
Contractors shall furnish this notice no later than 5:00 P.M. on the Monday preceding the scheduled Letting Date. For a fee, Contractors and other interested entities may order paper copies of the KDOT Standard Specifications for State Road and Bridge Construction, 2015 Edition, [Standard Specifications] by using KDOT's website of http://www.ksdot.org and choosing the following selections: "Doing Business", "Highway Contractors", "Contractor Resources and "Specifications".
5. Contractors shall use the AASHTO's Project Bids software in combination with the electronic bidding system file created for the Project with Project Bids software [EBSX file] to generate an electronic internet proposal. The Project Bids software and Project
EBSX file are available on Bid Express' website at http://ui.bidx.com.
Contractor: Page 1 Check: FE19DCE05C
6. Contractors shall only use the Project Bids software to create a proposal and submit an electronic internet proposal to KDOT using the Bid Express website at http:// ui.bidx.com.
7. The KDOT Bureau of Construction and Materials will only accept electronic internet proposals on-line using Bid Express until 1:00 P.M. Local Time on the Letting Date. KDOT will open and read these proposals at the Eisenhower State Office Building, 700 SW
Harrison, Topeka, Kansas 66603 at 3:00 P.M. Local Time on the Letting Date. Bids are read on a conference call at 785-414-8630. The conference ID is 856 616 050#.
8. The Contractor shall execute a contract for the proposed work within ten (10) business days after notice of the award of the contract.
9. The contractor shall complete work to open the project to unrestricted traffic within
_10_ Restricted Days and shall complete the work within the total Contract Working Days of _20_.
10. The Contractor shall complete the Project according to the plans, Standard
Specifications, provisions identified in the Special Provision List and all other
Contract Documents identified in Standard Specifications subsection 101.3
11. The undersigned declares that the Contractor has carefully examined the Bidding
Proposal Form for the Project. The Contractor understands the following:
A. The Bidding Proposal Form consists of the following documents: the Project EBSX files on the Bid Express website (which includes DOT Form 202, required contract provisions, and the Unit Prices List), special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, any addenda, all questions and answers posted on the Bid Express website, and any amendments the Secretary provides for the Project. The Contractor can obtain these documents at KDOT's website (see paragraph 4).
B. The special provision list identifies all required contract provisions, project special provisions and special provisions that apply to the Project.
C. The Bidding Proposal form becomes the Contractor's Proposal after the Contractor completes the EBSX file, electronically signs the Proposal where required on DOT Form
202, and submits the completed EBSX file documents and bid bond to KDOT using Bid
Express. The special provision list, project special provisions, special provisions, Standard Specifications, plans, exploratory work documents, any additional contract information, all questions and answers posted on the Bid Express website, and any addenda are incorporated by reference into the Proposal. These documents are part of the
Contractor's Proposal.
D. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the contents of the Proposal or the procurement process.
12. The Contractor has inspected the actual location of the work. The Contractor has determined the availability of materials. The Contractor has evaluated all quantities and conditions. In electronically signing this Proposal, the Contractor waives the right to claim that the Contractor misunderstood the scope of the work.
Contractor: Page 2 Check: FE19DCE05C
13. SPECIAL PROVISIONS REQUIRING INFORMATION. The following Required Contract Provisions
(I-XVII) require the Contractor to furnish information. The current versions of these provisions are contained in the Project EBSX file. Some or all of these apply to the
Project as indicated in the Special Provision List. The Contractor shall complete these provisions within the EBSX file. When these documents are required, the Secretary will reject proposals that fail to contain completed Provisions I, II, III, or IV in the EBSX file, and may reject proposals that fail to contain completed Provisions V, VI, VII, VIII, IX, X, XI, XII, XIII, XIV, XV, XVI, or XVII in the EBSX file.
I. 08-10-66 Certification-Noncollusion & History of Debarment
II. 04-30-82 Certification-Financial Prequalification Amount
III. 04-26-90 Declaration-Limitations on Use of Federal Funds for Lobbying
IV. 08-04-92 Certification-Contractual Services with a Current Legislator or a Current Legislator's Firm
V. 10-10-00 Price Adjustment for Fuel
VI. 06-01-06 Price Adjustment for Asphalt
VII. 08-31-09 Price Adjustment for Emulsified Asphalt
VIII. 08-08-01 Furnishing and Planting Plant Materials Unit Cost
IX. 05-18-07 Repair (Structures) Unit Cost
X. 11-15-17 Electric Lighting System Unit Cost
XI. 04-06-09 ITS Unit Cost
XII. 08-17-16 Water System Unit Cost
XIII. 06-19-19 Sanitary Sewer System Unit Cost
XIV. 01-01-18 Smart Work Zone System Unit Cost
XV. 08-12-24 CORS Unit Cost
XVI. 04-06-26 Federal Restrictions on Foreign Drones
XVII. 01-01-11 Kansas Department of Revenue Tax Clearance Certificate
14. The funding source for this Project is STATE. On Projects involving City or County funds, the Secretary acts as the Agent of the City or County and as the administrator of federal or state funds. Each governmental entity's responsibilities are described in a contract between the entities which is available on request.
15. FEDERAL AID DOCUMENTS INCLUDED IN PROPOSAL. If the Project is supported in whole or in part by Federal funds, the latest revisions of the following provisions (I - IV) also apply to the Project. These documents are not included in the Project EBSX file but are accessible on KDOT's website and incorporated by reference into the proposal like other provisions and the exploratory work documents.
I. 11-03-80 Affirmative Action For EEO
II. 11-15-96 Affirmative Action & EEO Policies
III. 09-06-94 U.S. DOT Fraud Hotline
IV. FHWA-1273 Federal-Aid Required Contract Provisions
16. The Secretary reserves the right to reject any and all proposals and to waive any or all technicalities.
Contractor: Page 3 Check: FE19DCE05C
17. SIGNATURE SECTION:
A. Electronic Internet Proposal
The person submitting the electronic internet Proposal, on the Contractor's behalf, shall be the person whose digital identification is used to submit this Proposal. That person shall complete paragraphs B and C. The person whose digital identification is used to electronically sign this Proposal binds the Contractor to this Proposal and binds the named individual to the certification in paragraph B.
B. Certification
I CERTIFY THAT I AM AUTHORIZED TO REPRESENT THE CONTRACTOR IN PREPARING AND PRESENTING
THIS PROPOSAL. I CERTIFY UNDER PENALTY OF PERJURY THAT THE FOREGOING (INCLUDING BUT NOT
LIMITED TO THE INFORMATION CONTAINED IN THE SPECICIAL PROVISIONS REFERENCED IN PARAGRAPH
13) IS TRUE AND CORRECT.
EXECUTED ON
C. Signature
Number of company or joint venture:
Name of company or joint venture:
Name of person signing:
Title of the person signing:
Signature: Electronic Internet Proposal
RELEASED FOR CONSTRUCTION:
Date:____________________________________
Chief of Construction and Materials
Contractor: Page 4 Check: FE19DCE05C
KANSAS DEPARTMENT OF TRANSPORTATION
SPECIAL PROVISION LIST
PAGE:
DATE:
08/12/26
STATE PROJECT NO: U036-101 KA 8125-01 STATE CONTRACT NO: 526096242
FEDERAL PROJ NO.
PRIMARY DISTRICT:
DESCRIPTION:
PRIMARY COUNTY: WASHINGTON2
CHIP SEAL. US36; FR ECL WASHINGTON TO LITTLE BLUE RIVER BR IN WS CO.
LGTH 9.176 MI.
PROVISION NO. DESCRIPTION
NOTE: THE FOLLOWING LIST OF SPECIAL PROVISIONS ARE FOR THIS PROJECT.
OMISSION OF ALL OR PART OF A SPECIAL PROVISION IN THE ATTACHED
PROPOSAL (CONTRACT) DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY FOR OBTAINING THE COMPLETE PROVISION AS LISTED.
REQUIRED CONTRACT PROVISION-NONCOLLUSION / HISTORY-DEBARMENT08-10-66-R05
REQUIRED CONTRACT PROVISION-FINANCIAL PREQUALIFICATION04-30-82-R07
REQUIRED CONTRACT PROVISION-CONTRACTUAL SERVICES-LEGISLATOR08-04-92-R03
REQUIRED CONTRACT PROVISION-EMULSIFIED ASPHALT ADJUSTMENT08-31-09-R01
REQUIRED CONTRACT PROVISION-EEO REQUIREMENT11-15-96-R06
REQUIRED CONTRACT PROVISION - BOYCOTT OF ISRAEL PROHIBITED07-01-17-R1
MINIMUM WAGE RATE (WASHINGTON COUNTY)KS20260127
REQUIRED CONTRACT PROVISION-TAX CLEARANCE CERTIFICATE01-01-11-R01
ERRATA SHEET FOR STD SPEC BOOK FOR RD & BR CONST, 2015 ED15-ER-1-R23
POLICY AGAINST SEXUAL HARASSMENT03-01-18
REQUIRED CONTRACT PROVISIONS KS FUNDED CONST CONTRACTS15-01003
EMULSIFIED ASPHALT ADJUSTMENT15-01010
ENVIRONMENTAL CONCERNS - MIGRATORY BIRD TREATY ACT15-01011-R06
SEASONAL LIMITATIONS15-01012-R01
PROSECUTION AND PROGRESS15-01016-R04
CONTROL OF WORK15-01019-R02
BIDDING REQUIREMENTS AND CONDITIONS15-01021-R03
SCOPE OF WORK15-01022-R04
BIDDING REQUIREMENTS AND CONDITIONS15-01023
AWARD AND EXECUTION OF CONTRACT15-01024
CHIP SEALS15-06011
WORK ZONE TRAFFIC CONTROL AND SAFETY (FOR 1R'S)15-08001-R04
WORK ZONE TRAFFIC CONTROL & SAFETY15-08019-R04
WORK ZONE TRAFFIC CONTROL AND SAFETY (WORKERS PRESENT SIGNS)15-08029
STORMWATER POLLUTION MANAGEMENT15-09002-R05
GENERAL REQUIREMENT DIVISION 120015-12001-R01
STEEL SIGN POSTS15-16002-R03
IMAGE SYSTEMS15-22005-R03
RETROREFLECTIVE SHEETING15-22006-R01
ROLL-UP SIGNS15-22011
RAISED PAVEMENT MARKERS15-22015
WOOD POSTS15-23001-R03
FIELD HANDLING AND PRESERVATIVE TREATMENT OF WOOD PRODUCTS15-23003-R02
PART V15-25001-R07
MATERIALS CERTIFICATIONS15-26001-R13
SPECIAL PROVISION LIST
PAGE:
DATE:
08/12/26
END OF SPECIAL PROVISION LIST
REQUIRED CONTRACT PROVISION - 08-10-66-R05 (Rev. 07/05)
CERTIFICATION - NONCOLLUSION AND HISTORY OF DEBARMENT
K.A.R. 36-30-4, 49 C.F.R. 29.335, 23 U.S.C. 112(c), 49 U.S.C. 322
Complete the exceptions below if applicable. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this
Certificate.
NONCOLLUSION
I certify that the Contractor submitting this bid has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action, in restraint of free competitive bidding in connection with the submitted bid.
HISTORY OF DEBARMENT
I certify that, except as noted below, the Contractor submitting this bid and any person associated with this Contractor in the capacitiy of owner, partner, director, officer, principal, investigator, project director, manager, auditor, or any position involving the administration of federal funds:
1. Are not currently suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency;
2. Have not been suspended, debarred, voluntarily excluded or disqualified from bidding by any federal or state agency within the past three years;
3. Do not have a proposed debarment pending;
4. Within the past three years, have not been convicted or had a civil judgment rendered against them by a court of competent jurisdiction in any matter involving fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and
5. Are not currently indicted or otherwise criminally or civilly charged by a federal, state, or local government with fraud, anti-trust violations, theft, official misconduct, or other offenses indicating a lack of business integrity or business honesty; and
6. Have not had one or more federal, state, or local government contracts terminated for cause or default within the past three years.
Answer 'Yes' if there are exceptions to the above described circumstances. Answer 'No' if there are no exceptions.
Yes No
The exceptions, if any, are:
Contractor: Page 5 Check: FE19DCE05C
REQUIRED CONTRACT PROVISION - 04-30-82-R07 (Rev. 01/11)
CERTIFICATION - FINANCIAL PREQUALIFICATION AMOUNT
Select the appropriate response below to indicate whether this Proposal exceeds the
Contractor's financial prequalification amount. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.
I understand that I may be required to identify the outstanding contract and subcontract work of my firm, association or corporation on DOT Form 284 prior to an award of contract. Unless I obtain approval, I understand that the Secretary may reject this
Proposal if the dollar value of work on this Contract combined with unearned amounts on our unfinished contract and subcontract work exceeds our prequalification amount.
I certify that the amount of this Proposal plus the total unearned amount of other contracts with the Kansas Department of Transportation plus the unearned amount of all other contracts in this state or other states exceeds does not exceed the financial prequalification amount of our firm, association or corporation. I also certify that our firm, association or corporation has the financial ability to do the work.
If this Proposal exceeds the financial prequalification amount, I certify that I obtained approval to submit this bid from the KDOT representative I have listed below. (Prior approval to exceed the prequalification limit may be made by telephone or personal contact).
KDOT Approval Granted by:
KDOT Approval Date:
Contractor: Page 6 Check: FE19DCE05C
REQUIRED CONTRACT PROVISION - 08-04-92-R03 (Rev. 07/05)
CERTIFICATION - CONTRACTUAL SERVICES WITH A CURRENT
LEGISLATOR OR A CURRENT LEGISLATOR'S FIRM
Select the appropriate response below to indicate whether this contract is with a legislator or a firm in which a legislator is a member. The Contractor's signature on the last page of the Contractor's Proposal (DOT Form 202) supplies the necessary signature for this Certificate.
Kansas Law, K.S.A. 46-239(c), requires this agency to report all contracts entered into with any legislator or any member of a firm of which a legislator is a member, under which the legislator or member of the firm is to perform services for this agency for compensation. The Contractor certifies that:
This Contract is is not with a legislator or a firm in which a legislator is a member. That Legislator is:
Name:
Address:
City State Zip:
Business Telephone:
Contractor: Page 7 Check: FE19DCE05C
REQUIRED CONTRACT PROVISION - 08-31-09-R01 (Rev. 03/15)
PRICE ADJUSTMENT FOR EMULSIFIED ASPHALT
The Contractor may accept or reject the application of Special Provision 15-01010 (latest revision) "Emulsified Asphalt Price Adjustment."
Answer 'Accept' if you accept this provision. Answer 'Reject' if you reject this provision and the provision will not be part of the contract.
Accept Reject
Contractor: Page 8 Check: FE19DCE05C
REQUIRED CONTRACT PROVISION - 01-01-11-R01 (01-01-11-R01)
TAX CLEARANCE CERTIFICATE
Answer 'Yes' if the Contractor has a current Tax Clearance Certificate. Answer 'No' if the Contractor does not have a current Tax Clearance Certificate.
Yes No
Insert the Tax Clearance Confirmation Number if available at the time of bidding:
Contractors shall have a current Tax Clearance Certificate from the Kansas Department of
Revenue [KDOR] at the time of contract award. The Tax Clearance process is a tax account review by KDOR to determine that the Contractor's account is compliant with Kansas tax laws administered by the Director of Taxation. The Secretary will reject the Contractor's
Proposal as non-responsive if the Contractor does not have a current Tax Clearance
Certificate at the time of the contract award.
To obtain a Tax Clearance Certificate, the Contractor shall complete and submit to KDOR an Application for Tax Clearance obtained from KDOR's website at http:// www.ksrevenue.org/taxclearance.htm. The Application Form can be completed and submitted on-line, by mail, or by fax. After the Contractor submits the Application, KDOR will provide the Contractor a Transaction ID number. The Contractor shall use the Transaction
ID number to retrieve the Tax Clearance Certificate. Decisions on on-line applications are generally available the following business day.
After the Contractor obtains the Tax Clearance Certificate, the Contractor shall insert on this Required Contract Provision the Confirmation Number contained in the Certificate or the Contractor shall submit a copy of the Tax Clearance Certificate to the KDOT Bureau of Construction and Materials by hand delivery, mail, e-mail or fax. Before awarding a contract, the Bureau of Construction and Materials will authenticate the Certificate through the Confirmation Number inserted on this Required Contract Provision or contained on the Certificate submitted.
If the Contractor is unable to retrieve the Tax Clearance Certificate or if KDOR denies the Contractor's Application for Tax Clearance, the Contractor shall call KDOR's Special
Projects Team at 785-296-3199 to determine why KDOR failed to issue the certificate.
Tax Clearance Certificates are valid for 90 days after issue. To renew a clearance, submit a new Tax Clearance Application. Information pertaining to a Tax Clearance is subject to change for various reasons, including a state tax audit, federal tax audit, agent actions, hearings, and other legal actions. The Tax Clearance Certificate is not
"clearance" for all types of taxes the State of Kansas may assess.
Subcontractors also shall have a current Tax Clearance Certificate from KDOR before the
Secrtary approves them for subcontract work. The Contractor shall submit to the KDOT
Field Office the Subcontractor's Tax Clearance Certificate with KDOT Form 259, Request for Approval of Subcontractor.
Contractor: Page 9 Check: FE19DCE05C
Line Number Item Number Quantity Unit Unit Price Extension Price
Section 01
COMMON ITEMS
1 025323 1.000 LS
MOBILIZATION /
2 025324 1.000 LS
TRAFFIC CONTROL /
3 070580 1.000 HOUR $30.000 $30.00
FLAGGER (SET PRICE) /
Section 01 Total $30.00
Section 02
ASPHALT SURFACING ITEMS
4 080672 297.000 TON
EMULSIFIED ASPHALT (CRS-1HP) (SEAL) /
5 010813 1386.000 CUYD
COVER MATERIAL (CM-L-2) /
6 012809 482.000 STA.
MANIPULATION (CHIP SEAL) /
7 071992 482.000 STAL
FLEXIBLE RAISED PAVEMENT MARKERS (4" BROKEN (3 FT.)) /
8 010112 1.000 MGAL $40.000 $40.00
WATER (FLEXIBLE PAVEMENT) (SET PRICE) /
Section 02 Total $40.00
Item Total $70.00
Contractor: Page 10 Check: FE19DCE05C
�� ������������������������������������������������������������������������������+��,����-�������������������������������������������������������������������.����������������������/���#��*0'+.�+12,*(+���0*+.3�0.�� .,44�.,���3,��0��555555556�7�5�7��������������������5��----------------------------------------------------------------�,.0�����-�����8�������������������������������������������������������������.����������������������/���#��,.0�'0.�+.9���.2��2.345555555555555555555555555555556�7:5��������������������785��----------------------------------------------------------------��2�����:-��������:����:�����������������������������������������������������.����������������������/���#���.2��� .,;+.��0//�.03 ��.2��5555555555555555555555556���57��������������������5���.2��� .,;+.��/43�<+ �3� �40'<0=555555555555555555556��:5���������������������5���.2��� .,;+.�� 2(*�3� ��3� +(555555555555555555555556���5�:�������������������5���.2��� .,;+.���'3�+.��.2��555555555555555555555555556���5���������������������5���.2��� .,;+.���*,��2*��.2��55555555555555555555555556���5�:�������������������5���.3//,���0��.04�����+.;,�+� .,;+.55555555555555555556��85���������������������5���+.;,�+(3���+12,*(+��55555555555555555555555555555556���577�������������������5�80*+.3�0.����.,*,���(3�",�+555555555555555555555555556��:5:7������������������858:0*+.3�0.��.0�0�(,44��.02� (3�555555555555555555555556���57��������������������5��0*+.3�0.��.0�0�(,445555555555555555555555555555555556���5���������������������5��0*+.3�0.����.3��0.55555555555555555555555555555555556���5�8�������������������5��0*+.3�0.�����.++ 555555555555555555555555555555555556���5���������������������5��0*+.3�0.�����.3*+.55555555555555555555555555555555556���5���������������������5��0*+.3�0.���.044+.555555555555555555555555555555555556��85���������������������5��0*+.3�0.���*3;+.��>3�*"34�9�3��.+�3�+9�3� ��0��.+�+?55555555555555555555555555555555555555555556���5�7�������������������5��0*+.3�0.���(+�"3�,�5555555555555555555555555555555556���5���������������������5��0*+.3�0.���(3�+.,34��.3��/+.�;+",�4+55555555555555556��75:��������������������5��0*+.3�0.���403 +.555555555555555555555555555555555556���5���������������������5��0*+.3�0.����.3 +.�<43 +555555555555555555555555555556���5�:�������������������5��0*+.3�0.��� ,��.,<2�0.5555555555555555555555555555556���5�:�������������������5��0*+.3�0.����.3�+5555555555555555555555555555555555556���5���������������������5��0*+.3�0.����0��.+�+��3'555555555555555555555555555556���5���������������������5��0*+.3�0.����0��.+�+�/,�,�",���(3�",�+5555555555555556���5���������������������5��0*+.3�0.���<244 0@+.555555555555555555555555555555556���5���������������������57�0*+.3�0.���<.00(��'++*+.55555555555555555555555555556��75�8�������������������5��0*+.3�0.���<0<�3����, ���++.���, �403 +.5555555555556���5:��������������������5��0*+.3�0.���<3��"0+�+A�3;3�0.��.3��"0+5555555555555556���5���������������������5�:0*+.3�0.���3�*"34��*43��55555555555555555555555555556��85���������������������5��
BCDCEBF�DGHH�IJ KIJLMNO
PQQRSGCCSTULMNOCVTMWXYWQWZU[\TQ[N\C]KEHEBĤE_Ĉ Ĉ̀
��������������������������&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&"�������&��'(')*'�+,-'�.+'/(+)0'1�23+�(+,2-�.'+23+4)563.'+,-)35�-3�78)(8�7'91)56�)/�)5()1'5-,9�::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::�3-'���;'(<-)*'��+1'+�=��>� $�#���/-,09)/8)56��,)1��)(?��',*'23+� '1'+,9��35-+,(-3+/�,..9)'/�-3�,99�(35-+,(-/�/<0@'(-�-3�-8'�,*)/&�,(35��(-�23+�78)(8�-8'�(35-+,(-�)/�,7,+1'1�=,51�,5A/39)()-,-)35�7,/�)//<'1>�35�3+�,2-'+�B,5<,+A� $����2�-8)/(35-+,(-�)/�(3*'+'1�0A�-8'�����-8'�(35-+,(-3+�4</-�.+3*)1''4.93A''/�7)-8� �83<+�32�.,)1�/)(?�9',*'�23+�'*'+A� ��83<+/-8'A�73+?��<.�-3��#�83<+/�32�.,)1�/)(?�9',*'�',(8�A',+��4.93A''/�4</-�0'�.'+4)--'1�-3�</'�.,)1�/)(?�9',*'�23+�-8')+375�)995'//��)5@<+A�3+�3-8'+�8',9-8&+'9,-'1�5''1/��)5(9<1)56.+'*'5-)*'�(,+'C�-3�,//)/-�,�2,4)9A�4'40'+�=3+�.'+/35�783�)/9)?'�2,4)9A�-3�-8'�'4.93A''>�783�)/�)99��)5@<+'1��3+�8,/�3-8'+8',9-8&+'9,-'1�5''1/��)5(9<1)56�.+'*'5-)*'�(,+'C�3+�23+�+',/35/+'/<9-)56�2+34��3+�-3�,//)/-�,�2,4)9A�4'40'+�=3+�.'+/35�783�)/9)?'�2,4)9A�-3�-8'�'4.93A''>�783�)/�,�*)(-)4�32��134'/-)(*)39'5('��/';<,9�,//,<9-��3+�/-,9?)56����11)-)35,9�)523+4,-)3535�(35-+,(-3+�+'D<)+'4'5-/�,51�73+?'+�.+3-'(-)35/�<51'+�-8'���)/�,*,)9,09'�,-8--./�%%777�139�63*%,6'5()'/%781%63*'+54'5-&(35-+,(-/��3-'���;'(<-)*'��+1'+� #�!�6'5'+,99A�,..9)'/�-3�(35-+,(-/�/<0@'(-�-3�-8'��,*)/&�,(35��(-�-8,-�7'+'�,7,+1'1�35�3+�0'-7''5�B,5<,+A� ��,51�B,5<,+A�����������,51�-8,-�8,*'�53-�0''5�+'5'7'1�3+�';-'51'1�35�3+�,2-'+�B,5<,+A� ����������;'(<-)*'��+1'+� #�!�13'/�53-�,..9A�-3�(35-+,(-/�/<0@'(-�359A�-3�-8'��,*)/&�,(35��'9,-'1��(-/�+'6,+19'//�32�78'5�-8'A�7'+'�,7,+1'1���2�,�(35-+,(-�)/�/<0@'(-�-3��;'(<-)*'��+1'+� #�!��-8'�(35-+,(-3+�4</-�.,A�,99�(3*'+'1�73+?'+/�,-�9',/-�� �#��.'+�83<+�=3+�-8'�,..9)(,09'�7,6'�+,-'�9)/-'1�35�-8)/�7,6'�1'-'+4)5,-)35��)2�)-�)/�8)68'+>�23+�,99�83<+/�/.'5-�.'+23+4)56�35�-8'�(35-+,(-�2+34��,A�
�����#��-8+3<68��'('40'+� �����#����8'�,..9)(,09'��;'(<-)*'��+1'+�4)5)4<4�7,6'�+,-'�7)99�0'�,1@</-'1�,55<,99A��11)-)35,9�)523+4,-)35�35�(35-+,(-3+�+'D<)+'4'5-/�,51�73+?'+�.+3-'(-)35/�<51'+��;'(<-)*'��+1'+� #�!�)/�,*,)9,09'�,-�777�139�63*%781%63*(35-+,(-/��59)/-'1�(9,//)2)(,-)35/�5''1'1�23+�73+?�53-�)5(9<1'1�7)-8)5-8'�/(3.'�32�-8'�(9,//)2)(,-)35/�9)/-'1�4,A�0'�,11'1�,2-'+,7,+1�359A�,/�.+3*)1'1�)5�-8'�9,03+�/-,51,+1/�(35-+,(-�(9,</'/=��� ������=,>�= >�=)))>>�&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&�8'�031A�32�',(8�7,6'�1'-'+4)5,-)35�9)/-/�-8'�(9,//)2)(,-)35/,51�7,6'�+,-'/�-8,-�8,*'�0''5�23<51�-3�0'�.+'*,)9)56�23+�-8'-A.'=/>�32�(35/-+<(-)35�,51�6'36+,.8)(�,+',�(3*'+'1�0A�-8'�7,6'1'-'+4)5,-)35���8'�(9,//)2)(,-)35/�,+'�9)/-'1�)5�,9.8,0'-)(,93+1'+�<51'+�+,-'�)1'5-)2)'+/�)51)(,-)56�78'-8'+�-8'�.,+-)(<9,++,-'�)/�,�<5)35�+,-'�=(<++'5-�<5)35�5'63-),-'1�+,-'>��,�/<+*'A+,-'��,�7')68-'1�<5)35�,*'+,6'�+,-'��,�/-,-'�,13.-'1�+,-'��3+�,/<..9'4'5-,9�(9,//)2)(,-)35�+,-'��5)35��,-'��1'5-)2)'+/
EFGFHEI�GJKK�LM NLMOPQR
STTUVJFFVWXOPQRFYWPZ[\ZTZ]X̂_WT̂Q_F̀NHKHEKaHbFa HFc
| ���� | ||
| ��� | ��� | �� |
| ���� | |
| � | �� |
| ��� | ����� |
| � | �� |
| ���� | ����� | � | |
| �� | ��������� | ||
| ���� | |||
| ��� | ���� | ��� |
| �� | |
| � | �������� |
| �"� | ���� | � | ���������� | ���� | ���$��"� | ���%�����'()*��0� | � |
| ! |
| �"� | ���� | ��� |
| ���� | ��� |
| � | ���� | �� |
| �"� |
| ��0� | ��� |
| ��',-'(-.'./�� |
| � | !�"�� | ����� | |
| � | � | �� | � |
| �� | ��� | ||
| ���� | |||
| � | �"�� |
| ��� |
| �� |
| ��� | ����� | |
| ����� | ��� | |
| ���� | ����� | |
| �� | ||
| ��� | �� | � |
| � | ��� | �� |
| �" | � |
| ��� | �� | ��� |
| �� |
��123��
| � | ��� |
| �� |
| � | ����� | � |
| �� | ������� |
| ����� | " | |
| �4�5�6���� | � |
| ��� | ��� | �7� |
| �8� | ||
| ��� | ��0� | �������� |
| ��� | ��� |
| �� | ��� | ||
| ��� | ���� | ����� | |
| ��� | ����������� |
�(''9����
| � | ��� |
| ��� | ��� |
| ����� | |
| � | ����������� |
| ��� | �� | � |
| ��� |
��� :�&$% #�����;2�''('�'(-'(-.'./��������
| � | ��� | |
| ������ | ��� | |
| ��� |
| ��� | ��� | ��� |
| ��;2�� |
| �� | |
| � | �� |
| ����;����0� | � |
| ! |
| � | ���� | �� |
| �"� |
| ��0� | ��� |
| ��'(-'(-.'./� |
| �� | ||
| � | ��� | |
| � | ||
| � | ���� | �� |
| �"� |
| �� | ||
| ��� | �� | � |
| ��� | ��� | ��� |
| ���������� | ||
| ������� | ����� | |
| ��� | ||
| � | ���� | ������������� |
| �� | �� | � | |
| ���� | ��� | ||
| ���� | ��� | ���� | |
| � | ����� |
| � | ���� | � |
| �� | ������� |
| � | ��� | ||
| ������� | ������ | ��7� | |
| �8� | |||
| ��� | ��0� | �������� | |
| ��� | ��� |
| � | � |
| � | ������ |
| �� | � |
| ��� | ���� | ��4���� | �� |
| ��� |
�.)��=7�(�.6�����
| � | ��� | ||
| ������ | ��� | ������"�� |
| ����� | ��� | ||
| ���� | ��� | ��� | |
| ���� | ��� |
| � | ��� | |
| �� | ��� | |
| ��� |
| �������� | ��� | ||
| ��� | ��� | ��� | |
| �� | |||
| ���� | �������� | ||
| ��� | ��� | ||
| ��� |
| �� | |
| � | ��� |
| �������� | |
| �� | � |
| ������� | ��� | ||
| ���� | ��� | �������� | ���� |
| �� | |
| � | �� |
| ����=��������.'..���� | ||
| � | � | ������ |
| � | ����� | ��� |
| ���� | ��� | ���0� | � |
| ! |
| � | ���� | �� |
| �"� |
| ��0� | ��� |
| �>-.,-.'./�� |
| �� | ||
| � | ����� | ����"�� |
| ���� | |
| � | ����������� |
| ��� | |
| � | �� |
| ��� | ���������� | ��� |
| �� | ||
| ���������� | "�� |
| ���2�� | � | ��� | |
| � | �1�� | �� |
��2����3������ �41236�����
| �������� | |
| ��� | |
| � | ��.)��=7�(�>4�64(6�� |
| ����� | ||
| ��7� | ||
| �8� | ||
| ��� | ��0� | �������� |
| ��� | ��� |
| ��� | ����� |
| ����� | ��� |
| ��� |
�4��������6���� �
| �� | � | ���� | ||
| ��� | ||||
| � | ��.)���=�7�(�?4�6�4�6��� !�"�� | #���& .'.?�'','(-'?-.'./������ | �� | � |
| � | ��� | |
| ���� | �� |
| ����� | ||
| ���& � | � | ��� |
| ����&�� | ||
| ��.'.?���� | ||
| � | �� | ������� |
| ���"�� | ||
| �� | ||
| � | ����� | ��� |
| � | ���� |
| ������������ |
| ���� | ���� | ���0� | � |
| ! |
@ABAC@D�BEFF�GH IGHJKLM
NOOPQEAAQRSJKLMATRKUVWUOUXSYZROYLZA[ICFC@F\C]A\ Â_
�#####################################################################################################$!%&�'&�&()*+!�*,+�!--&!. �-(,/& �0�1������������������������� �����2�����������3������������0���� �4�5� � ���5����������� �������������������0�������������� ������ �������������������0������������$1'���������������������������������������������������������� 0������������������ �����6�
�����0� �������,��� �4�5������� ������7 ���������
���������� �4�5������ � ��������$1'�8��������$���� �4�5���(�7 ������������� � �4���� �4�����������9 �����4�����5�
| ������3������������8���������$���� | �4�5�������������$������ | |
| �1� | ��'�4�����������������:� ��'����� | |
| �������.��������������������/������ | �����!4�� | ���+�$�������������$�����������'/������(���� |
������5������������
| ������������7 | ����������������� |
| ������������ | � |
| ��������$1'�8���������/����� | ������$����'���� | |
| ���������(�7 | ������������� | � |
�4���� �������8/$'#,�����9 �����4����5� ������3������������8���������/����� ������$����'����
| �1� | ��'�4�����������������:� ��'����� | |
| �������.��������������������/������ | �����!4�� | ���+�$�������������$�����������'/�������0�*������������� |
| �������������������� | � |
���������5���������� ����5�6������������� ��5�����������0������ ��������������7 ������4������ �1� ��!
�����������6 ����;�/<(�-������=��� ��;�/<(�-����>0�(�7 �����������4������ �4��� �������9 �����4�����5� ������3������������$������ �1� ��!
�������.��������������������/������ �����!4�� ���+�$�������������$�����������'/������������7 ������� � ��5���� �������� �����5?������������� ���5������ ������6�������5
| �������������0�����������7 | ����������� |
| ��������4�������������� | ���0�*������ |
��������������������4������������������� �����5� �5�������� ������5��������!
���������4�(�4����8��� �6��� ���5�����$����!�������8��� 0���$�������3������������!
���������4��(�4����8��� �������.��������������������/������ �����!4�� ���+�$�������������$�����������'/�������AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA����������&+'�,<�%&+&(!.�'&/* *,+B��������
CDEDFCG�EHII�JK LJKMNOP
QRRSTHDDTUVMNOPDWUNXYZXRX[V\]UR\O]D̂LFIFCI_F̀D_ aDa l l l l l l l l l l l l l l l l l l l l l l l o
°5
0'
°4
0'
°0
0'
-97°10'
-97°20'
-97°00'
-96°50'
-97°20'
-97°00'
-96°50'
°0
0'
-97°10'
°5
0'
°4
0'
Rainbow Rd th
R d th
R d
All American Rd th
R d
Xavier Rd
Big Bear Rd th
R d
3r d
R d
7t h
R d
Jade Rd
Thunder Rd
Fox Rd
Meridian Rd rd
R d
Indian Rd th
R d th
R d
Bismark Rd th
R d th
R d
S ta te L in e
R d
Wagon Train Rd
9t h
R d
Upland Rd
5t h
R d
Gypsum Rd th
R d th
R d
Liberty Rd nd
R d
Quivira Rd
Cross Creek Rd
Sunflower Rd
All American Rd th
R d
4t h
R d th
R d
Heritage Rd
Victory Rd
6t h
R d
Heritage Rd
1s t R d nd
R d
Osage Rd th
R d th
R d
Eagle Rd
Rainbow Rd
Osage Rd
2n d
R d
3t h
R d
7t h
R d
Zenith Rd
8t h
R d st
R d
County Line Rd
Thunder Rd th
R d
Fox Rd
King Rd th
R d
Concord RdConcord Rd
Prairie Rd
Zenith Rd
S ta te L in e
R d th
R d
2n d
R d
9t h
R d th
R d
1s t R d
Wagon Train Rd
P ar al le l R d
Gypsum Rd th
R d
Madison Rd st
R d th
R d th
R d
Quivira Rd
Deer Rd
Yankee Rd th
R d
Big Bear Rd
5t h
R d
Indian Rd
6t h
R d
Eagle Rd
National Rd rd
R d th
R d
Bismark Rd
Deer Rd th
R d th
R d
King Rd th
R d th
R d
Yankee Rd
8t h
R d
Victory Rd
Madison Rd
Upland Rd th
R d
National Rd th
R d th
R d
Liberty Rd
Cross Creek Rd
Prairie Rd
Arrowhead Rd th
R d
County Line Rd th
R d
Arrowhead Rd
Sunflower Rd th
R d
4t h
R d
Xavier Rd
P ar al le l R d
Jade Rd
Meridian Rd th
R d
17 2920
10 27
R 1 W R 1 W
R 5 E
T
S T
S
T
S T
S
T
S T
S
T
S
T
S T
S
T
S
R 2 E
T
S
T
S
R 3 E
R 4 E
R 1 E
R 5 E
R 4 E
R 1 E
R 2 E
R 3 E
R 1 E R 1 E
R 6 E
T
S T
S
T
S T
S
T
S
T
S T
S
T
S
R 3 E
T
S
T
S
R 4 E
R 5 E
R 2 E
R 6 E
R 5 E
R 2 E
R 3 E
R 4 E
F ir st S ta n d a rd P a ra ll el
S ou th
W as hi ng to n
C ou nt y
S ta te La ke
Plum Cr.
A sh Cr.
Be averCr.
W.Fancy Cr
Cam pC r.
Mer cerC r.
Jo y C r.
Bo llin g C r.
La ne
B ra nc h
Malo ne
Cr.
ScribnerCr.
M ill C
r. SpringCr.
Iow aC r.
Stu b C r.
Horse sh oeCr.
SchoolBranch
N
.F or k M ill C r.
Turkey Cr.
Devi lsCr.
Jon ah Cr
C ed ar C r.
Sulph urCr.
N.
Ot te r C r.
Kn edli k C r.
B o w m an
Cr.
S.
Fo rk
M il lC r.
Ca rter C r.
Davi s Cr.
W.Bran chS cr ib ne r C r.
Myer C r.
DeadmanCr.
N. Fo rk F anc y Cr.
St an le y
B ra n ch
S a lt C r.
Bu ffa lo
C r.
ParsonsCr.
P eats C r .
RiddleCr.
Mu lbe rry Cr.
Dry C r.
C o on
C r.
Li ttl e
Blu e R.
Jon es Cr.
Mountain Cr.
E.
BranchParsonsCr.
Me lvi n C r.
GrayB ranch
E no sd al e
La nh am
T hr oo p
C al de rh ea d
K im eo
B ra nt fo rd
E m m on s
PA
R
AL
LE
L R
D M
C S
MCS 10107
MCS 10121
MCS 10141
MCS 10127
M C
S
MCS 10129
M C
S
MCS 10119
MCS 10117
MCS 10139
MCS
10103
MCS 10109
M C
S
MCS 10125
MCS 10123
M C
S
MCS
10101
MCS 10113
MCS 10133
M C
S
M C
S
M C
S
MCS 10131
M C
S
MCS10137
M C
S
MCS 10111
MCS 10105
M C
S
MCS 10135
RS 578
RS 1099
R S
R S
R S
R S
R S
R S
RS1095
R S
RS 1494
R S
RS 1105
R S
RS 1493
RS 1101 RS 1104
RS 1106
R S
RS 1094RS 658
R S
R S
RS 125
RS 1097
R S
RS 657
RS 656
R S
R S
RS 1420
RS 654
R S
N eb ra sk a
County
C ou nt y
Cloud
County
C ou nt y
G ag e
R ile y C la y
Republic
Je ffe rs on
C o.
County
Marshall
C ou nt y
6.
.1
3.5
3.
13.1
7.0
0.
3.
.0
7.0
6.
3 7.
0.
3.1
4.
0.8
0.5
4.5
9.4
.5
0.
6.
4.
W as hi ng to n
C ou nt y
V et er an
's M em or ia l A irp or t
TO
W
AT
ER
VI
LL
E
TO
B
EL
LE
VI
LL
E
TO
C
LY
DE
TO
A
G
EN
D A
TO CLAY
TO
M
AR
YS
VI
LL
E
TO FAIRBURY, NEB.
CENTER
W as hi ng to n
(1 ,0
C lif to n
(4
Li nn
(3
M ah as ka
(4 4)
H an ov er
(6
B ar ne s
(1
M or ro w vi lle
(1
V in in g
(3 9)
H ol le nb er g
(1 2)
H ad da m
(1
P al m er
(1
G re en le af (3
9 14
9 14
9 15
9 15
UP
U P
M ile s
F E
B R
U A
R Y
6s
K D
O T m ak es n o w ar ra nt ie s, g ua ra nt ee s, o r re pr es en ta tio ns fo r th e ac cu ra cy o f t hi s in fo rm at io n an d as su m es n o lia bi lit y fo r er ro rs o r om is si on s.
G E
N E
R A
L H
IG
H
W A
Y M
A P
W A
S H
IN
G
T O
N C
O U
N T
Y K
A N
S A
S P
R E
P A
R E
D B
Y T
H E
K A
N S
A S
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
TA
T
IO
N
B U
R E
A U
O F
T R
A N
S P
O R
TA
T
IO
N
P L
A N
N
IN
G
IN
C
O O
P E
R A
T
IO
N W
IT
H
T H
E U
.S . D
E P
A R
T M
E N
T O
F T
R A
N S
P O
R
TA
T
IO
N
F E
D E
R A
L H
IG
H
W A
Y A
D M
IN
IS
T R
A T
IO
N
K an sa s
R eg io na l C oo rd in at e
S ys te m
K
R C
S
K R
C S
S al in a
N A
D
T M
U S
F ee t
H
IG
H W
A Y
M A
R K
E R
S
In te rs ta te
N u m b e re d H ig h w a y
K a n sa s T u rn p ik e A u th o ri ty
U .S
N u m b e re d
H ig h w a y
S ta te N u m b e re d
H ig h w a y
H
IG
H W
A Y
C L
A S
S
IF
IC
A
T
IO
N S
In te rs ta te
K an sa s
T ur np ik e (K
TA
U .S
. o r
S ta te R ou te
C on tr ol le d A cc es s
U .S
R o u te
D iv id e d
S ta te R o u te
D iv id e d
S ta te R o u te
U n d iv id e d
B O
U N
D A
R
IE
S
S ta te C ap ito l
C ou nt y
S ea t
P op ul at ed P la ce
Lo ca leC
IT
IE
S
O R
T O
W N
S o
C om m er ci al
A irp or t o
M ili ta ry
A irp or t o
O th er A irp or t
R ou nd ab ou t
In te rc ha ng e
M aj or C ol le ct or
U np av ed
Lo ca l - P av ed
Lo ca l - S oi l
R ai l T ra il
Le ve e or
D ik e
D R
A
IN
A G
E
R O
A D
C L
A S
S
IF
IC
A
T
IO
N S
R O
A D
S Y
S T
E M
D E
S
IG
N A
T
IO
N
M A
P S
Y M
B O
L S
A
IR
W A
Y S
A N
D A
IR
P
O R
T S
E nd o f D es ig na te d
S ys te m
P oi nt s
B et w ee n W hi ch
D is ta nc es a re M ea su re d l l
0.
C ou nt y
R oa d S ys te m 1S
T R
D
M aj or C ol le ct or
R S
M in or D ra in ag e
R iv er o r M aj or
D ra in ag e
La ke o r
R es er vo ir (w ith D am
M aj or R iv er
M aj or C ol le ct or
P av ed
Lo ca l - S to ne o r
G ra ve l
U .S
R o u te
U n d iv id e d
S ta te B ou nd ar y
C ou nt y
B ou nd ar y
M ili ta ry
F or t B ou nd ar y
In di an R es er va tio n
P ar k or
W ild lif e
A re a
N at ur al o r
C on cr et e F or d
(H is to ric
L oc at io ns
R ai lro ad
B rid ge
C lo se d to T ra ffi c
B rid ge
O pe n to
T ra ffi c
In co rp or at ed
C ity
L im it (P op ul at io n)
U rb an B ou nd ar y
M in or C ol le ct or
U np av ed
M in or C ol le ct or
P av ed
S ec tio n
Li ne
M in or C ol le ct or
M C
S
M aj or U rb an
S tr ee t
-1
K
A
5-
General Notes
4/23/2026
36-101
Note
1. The Contractor is responsible for establishing and maintaining centerline of the traveled way for the duration of the project. Splitting the traveled way with a tape measure is an acceptable technique to establish centerline. This work is considered subsidiary to other items on the contract.
2. Permanent Pavement Marking shall be completed by KDOT.
3. The quantities of traffic control devices are estimates only. Contractor operations may require additional signs and traffic control devices, this will be subsidiary to the bid item Traffic Control.
4. No 28” cones will be allowed to be used for traffic control. Only approved 42” trim lines will be allowed.
5. The lightweight aggregate may be stockpiled at KDOT Mixing Strip #2155 located 1 ¼ miles east of ECL Washington. Contract the Junction City Office at 785-238-4900 prior to hauling the material.
6.
Project No.
NoNo.
KA 8125-01
If harvesting operations occur that affect contract work, Special Provision 15-01012-R01 will be enforced.
7. All work should be coordinated so that all lanes will be open to traffic by one half hour before sunset. No lane closures or detours will be allowed overnight.
8. Additional flaggers may be required at the US36/Upland Rd Intersection and any other locations depending on the contractor’s operation. These additional flaggers shall be subsidiary to the bid item Traffic Control.
TYPICAL SECTION
C
Slope Varies
Chip Seal
Match Existing Surface not to scale
ROADWAY WIDTHS
Approx. Approx.
Location mile Width Location mile Width
OT/DK Co. Line east to E K18/K15 Jct
12.969 28'
RATE OF APPLICATION
Cover Material CM-L-2 @ 0.0082 yd3/yd2 Emulsified Asphalt (CRS-1HP) @ 0.42 gal/yd2
Date: 6/28/2021 11:33 AM
KANSAS DEPARTMENT OF
TRANSPORTATION
Dickinson Co. PROJ. NO. 106 D TITLE: CHIPSEALHIADT
Widenings Approx SQYDs
Exceptions Bridge 101-0048 258 ft
36-101
US 36 ECL Washington to Little Blue River Bridge
9.176 30
Entrances (28) Intersections (13) Turn Lane at Upland Rd Turn Lane at Yankee Rd
840.00 5220.22 2134.44
99.56
Washington Co. KA 8125-01
SUMMARY OF TRAFFIC CONTROL DEVICES
(FOR INFORMATION ONLY)
All traffic control devices shall be placed in accordance with the applicable KDOT Traffic Control Standards. The contractor shall provide all signs and other traffic control devices for proper traffic control of all construction activities. Quantities listed are estimates only. Contractor operations may require additional signs and traffic control devices, this will be subsidiary to the bid item traffic control.
WORK ZONE SIGNS *
SIGN
NO.
SIZE – SQ. FT.
0-9.25 9.26-16.25 16.26 & OVER
R2-1
R4-1 2
W3-4 2
W3-5
W8-11
W14-3 2
W20-1 5
W20-4 4
W20-5
W20-7 6
W21-5
W8-15
W8-15P
G20-4 1
KG20-5 6
KM4-20
KG20-2 8
KI-104a
KI-105a
LIGHTED DEVICES *
WORK ZONE WARNING LIGHT
(TYPE “A” LOW INTENSITY)
WORK ZONE WARNING LIGHT
(RED TYPE ”B” HIGH INTENSITY)
ARROW DISPLAY
PORTABLE CHANGEABLE MESSAGE SIGN
BARRICADES * CHANNELIZING DEVICES *
TYPE III (4’
TO 12’)
PEDESTRIAN FIXED PORTABLE PEDESTRIAN
SUMMARY OF TRAFFIC CONTROL DEVICES
(EACH)
RECAPITULATION OF QUANTITIES
ITEM QUANTITY UNIT
WORK ZONE SIGNS (0 TO 9.25 SQ. FT.) EADA
WORK ZONE SIGNS (9.26 TO 16.25 SQ. FT.) EADA
WORK ZONE SIGNS (16.26 SQ. FT. & OVER) EADA
WORK ZONE BARRICADES (TYPE 3 – 4’ TO 12’) EADA
WORK ZONE BARRICADES (PEDESTRIAN) EADA
CHANNELIZER (FIXED) EADA
CHANNELIZER (PORTABLE) EADA
CHANNELIZER (PEDESTRIAN) EADA
WORK ZONE WARNING LIGHT (TYPE “A” LOW INTENSITY) EADA
WORK ZONE WARNING LIGHT (RED TYPE “B” HIGH INTENSITY) EADA
ARROW DISPLAY EADA
PORTABLE CHANGEABLE MESSAGE SIGN EADA
PAVEMENT MARKING (TEMPORARY)
4" SOLID (TYPE I) STA./LINE
4" SOLID (TYPE II) STA./LINE
4" BROKEN (8')(TYPE I) STA./LINE
4" BROKEN (8')(TYPE II) STA./LINE
4" BROKEN (3')(TYPE I) STA./LINE
4" BROKEN (3')(TYPE II) STA./LINE
4" DOTTED EXTENSION (TYPE I) STA./LINE
4" DOTTED EXTENSION (TYPE II) STA./LINE
SOLID (LINE MASKING TAPE) STA./LINE
BROKEN (LINE MASKING TAPE) STA./LINE
SYMBOL (TYPE I) EACH
SYMBOL (TYPE II) EACH
FLEXIBLE RAISED PAVEMENT MARKERS (4" BROKEN (8’)) STA./LINE
FLEXIBLE RAISED PAVEMENT MARKERS (4" BROKEN (3’)) 683 STA./LINE
PAVEMENT MARKING REMOVAL LIN. FT.
WORK ZONE SIGN (SPECIAL) (16.25 SQ. FT. & LESS) EACH
WORK ZONE SIGN (SPECIAL) (16.26 SQ. FT. & OVER) EACH
RIGID RAISED PAVEMENT MARKER (TYPE I) EACH
RIGID RAISED PAVEMENT MARKER (TYPE II) EACH
TRAFFIC SIGNAL INSTALLATION (TEMPORARY) LUMP SUM
TRAFFIC CONTROL (INITIAL SET UP) LUMP SUM
TRAFFIC CONTROL 1 LUMP SUM
FLAGGER (SET PRICE) 1 HOUR
NOTES:
1 11/10/16 Removed Replacement Modules Summary Table, Added “(IBS)” to Replacement Modules description
JGB
NO. DATE REVISIONS BY APP’D
TRAFFIC CONTROL
SUMMARY OF DEVICES
RECAPITULATION OF QUANTITIES
TE795
FHWA APPROVAL 06/01/15 APP’D Kristina Erickson
DESIGNED B.A.H. DETAILED R.W.B. QUANTITIES TRACED
DESIGN CK. DETAIL CK. QUAN. CK. TRACE CK.
WORK ZONE SIGN (SPECIAL)
SIGN NO. 16.25 SQ. FT. & LESS 16.26 SQ. FT. & OVER
Dickinson Co. Proj. No. 106 D 2 Title:
36-101 LSUM Traffic Control
P
KR2-6
KR2-11
Washington
KR5-17 6 2
KA 8125-01
File details come from the government source that posted it. Updated .