The City of Round Rock is procuring construction services for roadway widening and traffic signal installation at the intersection of Chandler Road and CR 119 in Williamson County, Texas. This sealed-bid procurement encompasses installation of right-turn deceleration lanes along both roadways, a complete traffic signal system with controllers and vehicle detection equipment, pavement markings, drainage work, and erosion control measures. The scope of work includes 88 line items covering site preparation, excavation, embankment work, topsoil placement, seeding, lime treatment, flexible base reinforcement, asphalt paving and milling operations, traffic signal infrastructure with conduit and electrical service connections, concrete traffic barrier installation, and permanent erosion control seeding across approximately 3,266 square yards. The project involves installation of approximately 459 cubic yards of roadway excavation, 1,062 cubic yards of embankment, 1,578 square yards of flexible base, 243 tons of HMA overlay, and 370 feet of concrete traffic barrier. All work must comply with Texas Manual on Uniform Traffic Control Devices, TxDOT Standard Specifications, and the City's Design and Construction Standards, with contractors required to maintain workers' compensation insurance and provide comprehensive general liability, automobile liability, and builders' risk insurance with the City listed as additional insured. Bidding opened online through the Bonfire platform on February 25, 2026, at 8:00 a.m., with bids due by March 26, 2026, at 2:00 p.m., followed by public bid opening and results announcement at 3400 Sunrise Road. Bid security equal to five percent of the total bid amount is required, with contract award anticipated within 60 days of bid opening and Notice to Proceed issued within 60 days following execution.
No specific set-aside designations for disadvantaged enterprises or restrictions on bidder type are identified in the available documentation. Successful bidders must execute the City's standard agreement and furnish performance and payment bonds equal to 100 percent of the contract amount within ten days of award notification, and must file a Form 1295 Certificate of Interested Parties with the Texas Ethics Commission within ten business days of award. Contractors and subcontractors are required to pay prevailing wage rates as determined by the City, and a mandatory preconstruction conference is required prior to commencement of work. The contract includes liquidated damages provisions for failure to achieve Substantial Completion and a one-year warranty period following final acceptance. No incumbent vendor information or budget range is provided in the procurement documents. Bidders are responsible for verifying all addenda issued by the City through the project website at https://roundrocktexas.bonfirehub.com, and the City of Round Rock reserves the right to reject any or all bids and may waive any informalities or technicalities in the bidding process.
Opportunity text
Project includes installation of right turn deceleration lanes along Chandler Rd and CR 119, traffic signal, pavement markings, and drainage work.
Files
| File | Type | Posted |
|---|---|---|
| 2-Plans 100.pdf | ||
| 1-Project Manual 100.pdf | ||
| 3-Fillable Bid Form.xlsx | XLSX spreadsheet |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity