Central Energy Plant Construction
Closed State & local contract opportunity Posted
- Solicitation number
- 2026-0810
- State
- Florida
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- UNSPSC codes
- 72151500 Electrical system services
- 72151501 Lighting installation services
- 72151524 Industrial electrical service
- 72151522 Electrical luminary service
- 81101602 Mechanical product enclosures design
- 81101603 Machine tool design
- 81101605 Electromechanical services
- 81101513 Building construction management
- 72151100 Plumbing construction services
- 81101600 Mechanical engineering
- Point of contact
-
- Summer Wyllie-Vitt swyllie-vitt@mlbair.com (321) 723-6227
Updated .
About this opportunity
The Melbourne Airport Authority is requesting bids for Central Energy Plant construction at Melbourne Orlando International Airport in Melbourne, Florida, with sealed bids due September 17, 2026 at 2:00 PM EDT and a mandatory pre-bid conference and site visit on August 19, 2026 at 11:00 AM EDT.
This is a lump sum contract requiring the successful bidder to replace mechanical, electrical, and plumbing systems and HVAC infrastructure within the original 1989 terminal by constructing an enclosed Central Energy Plant with new water-cooled chillers, cooling towers mounted on roof, main electrical distribution panel, and pre-purchased generator installation. Work includes demolition of existing structures, structural steel installation, electrical and mechanical upgrades, fire protection modifications, and full compliance with Florida Building Code, Florida Mechanical Code, National Electric Code, and standards from ASHRAE, NFPA, ACI, and AISC. The bidder must maintain traffic control, coordinate with other contractors, and provide maximum operational support while the airport remains active; all subcontractors performing licensed work must be Division II contractors licensed in Brevard County. Construction must be managed using Critical Path Method scheduling with mandatory milestones for mobilization, dry-in, electrical energization, HVAC start-up, and substantial completion within 52 calendar weeks from Notice to Proceed anticipated by November 6, 2026.
The budgeted project cost is $4.2 million. A bid bond or certified check equal to 5% of the bid amount must accompany each proposal; the successful bidder must provide a public construction bond equal to 100% of the contract amount prior to execution. The project is federally funded through the FAA and FDOT and is subject to Davis-Bacon wage rates. Liquidated damages are assessed at $1,000 per calendar day for non-compliance with schedule for the first 30 days after substantial completion, increasing to $1,500 per day thereafter. Bidders must be Florida-licensed general contractors. Additional site visits are available Tuesdays and Thursdays between August 20 and September 3 with 24–48 hours advance notice and government-issued identification. Written questions are due September 10, 2026 at 2:00 PM EDT, with responses distributed via addendum. Bids remain valid for 60 calendar days after bid opening.
Opportunity text
The Melbourne Airport Authority (MAA) is seeking to replace the MEP and HVAC systems within the original terminal that was constructed in 1989. Equipment has been prepurchased in the first phase of this multi-phase project. Phasing is based on the grant funding available from both State and Federal resources. This phase of work is to replace the Central Energy Plant (CEP) with an enclosed structure with new water cooled chillers and cooling towers on the roof. This phase of work will also create a new main distribution panel for the electrical serving the CEP and the existing 1989 terminal. A new generator, pre-purchased, will also be installed in this phase. This is a Lump Sum Contract. The successful bidder will be responsible for maintenance of traffic, coordination with other contractors that may be doing work within the area, and for providing maximum support to the Melbourne Airport Authority in maintaining their operations and other functions at times specified by the Owner during installation. Construction will occur while the airport is operational, and provisions will need to be made to accommodate existing airfield activities adjacent to the project zone.
Files
| File | Type | Posted |
|---|---|---|
| 260810_Bid_Set_Front_End_CEP_Const.pdf | ||
| 00_00_01_Ad_RFB_CEP_26081001.pdf | ||
| 260810_Drawings_Bid_Set.pdf | ||
| 260810_Specifications_Div_131.pdf |