Cell 7 Site Fill

Closed State & local contract opportunity Posted

Solicitation number
25-2568
State
Michigan
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from bidnetdirect.com. Updated .

About this opportunity

The Muskegon County Board of Public Works is procuring a comprehensive Cell 7 Site Fill project for the county landfill through an Invitation for Bid (IFB 25-2568), which requires hauling and placing subgrade structural fill with extensive site preparation activities. The project involves multiple critical components including temporary erosion protection, clearing and grubbing approximately 37 acres, topsoil stripping, monitoring well management, and structural fill placement with approximately 140,000 cubic yards of imported fill material. Key deliverables include complete site restoration, revegetation of disturbed areas, installation of permanent erosion control blankets, and perimeter fencing. Bidders must submit comprehensive documentation including bid certifications, minority vendor certifications, references, and work experience. The bid was released on December 23, 2024, with a deadline for questions on January 7, 2025, and bid submissions due on January 16, 2025, at 10:00 AM. Contractors will be evaluated on past performance, warranty, cost of service, maintenance, and overall best value to the county, with an expected project completion date of August 30, 2025.

The procurement appears open to all qualified contractors without specific set-aside designations, though minority vendor certifications are required as part of the bid documentation. No incumbent vendors are explicitly identified in the available documentation. The project will be awarded as a single prime contract with no prevailing wage requirements, and the Owner reserves the right to negotiate final terms and potentially reject any or all bids. While a specific budget range is not definitively stated, the comprehensive bid sheet with 18 line items suggests a significant infrastructure investment. The project involves complex site preparation including tree clearing by March 31, 2025 (to avoid potential Indiana Bat habitat disruption), snowmobile trail relocation, and installation of various fencing types. Contractors must demonstrate technical capability to manage multiple site preparation and fill placement activities within a constrained 65-workday timeline, with potential special damages for extended Construction Quality Assurance efforts.

Opportunity text

Haul and place subgrade structural fill for Cell 7 at the Muskegon County Landfill.

Files

File Type Posted
DWG To PDF_LAYERS OFF.pc3 —
Pexco~PDS Winged Slat Product Sheet.pdf PDF
31406824MI.1010A_002_TRANSMIT.dwg DWG drawing
31406824MI.1010A_002_TRANSMIT.txt TXT text file
31406824MI.1010A_005_TRANSMIT.dwg DWG drawing
31406824MI.1010A_006_TRANSMIT.dwg DWG drawing
BRIDGETON.pdf PDF
MCL_Western_Expansion_1969.tif TIF image
Retaining Wall Proposed Fence Sketch.PDF PDF
SB-19 - SB-22.pdf PDF
SULLIVAN.pdf PDF
W9 BLANK.pdf PDF
WOLF_LAKE.pdf PDF
wooden snow-fence-installation.jpg JPG image
25-2568 Cell 7 Site Fill - Final.pdf PDF
31406824MI.1010A_001_TRANSMIT.dwg DWG drawing
31406824MI.1010A_001_TRANSMIT.txt TXT text file
31406824MI.1010A_004_TRANSMIT.dwg DWG drawing
Q&A Document 1.pdf PDF
RAVENNA.pdf PDF
_OneGolderLarge.ctb —
_OneGolderSmall.ctb —
20110707_PUT_811Eng_ver_RGB.jpg JPG image
25-2568 Cell 7 Site Fill Addendum #1 - Final.pdf PDF
25-2568 Cell 7 Site Fill Bid Sheet.xlsx XLSX spreadsheet
31406824MI.1010A_003_TRANSMIT.dwg DWG drawing
Pic of Berm Well Retaining Wall.jpg JPG image
Show all 27

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors