C5613684-D CHCF Potable Water Treatment System
Open State & local contract opportunity Posted
- Solicitation number
- 0000040952
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- UNSPSC code
- Point of contact
-
- Helen Wong helen.wong@cdcr.ca.gov
Opportunity details come from caleprocure.ca.gov. Updated .
About this opportunity
The California Department of Corrections and Rehabilitation is soliciting construction bids for the California Health Care Facility Potable Water Treatment System in Stockton under Contract C5613684-D, with a mandatory pre-bid conference and site walk on December 2, 2026 and bids due January 7, 2027. A minimum 3 percent Disabled Veteran Business Enterprise participation goal applies, and failure to meet this requirement results in bid rejection. A 5 percent small business preference, not to exceed $50,000, is available to certified small businesses that submit bids by the deadline.
The project constructs a chlorination boosting system to supplement disinfection of water delivered by the City of Stockton. It includes an above-ground chemical storage tank, a chemical injection system with electrical, mechanical, metering, and control equipment, and an approximately 900-square-foot pre-engineered metal building with site work and utilities. The awardee must integrate the new Supervisory Control and Data Acquisition (SCADA) system with the existing SCADA system and ensure chlorine residual at the facility complies with Environmental Protection Agency and State Water Resources Control Board drinking water standards. Prime contractors must hold a valid California Contractors State License Board "A - General Engineering Contractor" license at bid and throughout the project. Prevailing wage requirements apply under California Labor Code Section 1773. A geotechnical report included as Attachment I addresses expansive soils at the site.
The State's estimate is approximately $3.38 million. Bidders must post bidder's security equal to 10 percent of the bid amount. The successful bidder must provide performance and payment bonds, each equal to 100 percent of the contract amount. Completion is 578 days from the Notice to Proceed, which is anticipated April 6, 2027. Work is performed at the California Health Care Facility at 7707 Austin Rd in Stockton, San Joaquin County, California. CDCR retains audit rights for three years following final payment.
Drawings and specifications became available November 16, 2026. Letters of inquiry are due by 5:00 PM on December 10, 2026. Bids are due at 11:00 AM on January 7, 2027, with public bid opening at 2:00 PM on January 8, 2027.
Opportunity text
In general, the California Health Care Facility (CHCF) Potable Water Treatment System (PWTS) project will construct a new chlorination boosting system to supplement the disinfection of potable water delivered by the City of Stockton. The project will construct a PWTS consisting of an above ground chemical storage tank, chemical injection system with required electrical, mechanical, metering and control equipment. An approximately 900 square foot pre-engineered metal building, with site work and utilities, will also be constructed to house the chemicals and associated equipment. Integration of the new Supervisory Control and Data Acquisition (SCADA) system with the existing SCADA system is also required. Upon completion, the project must ensure compliance with the Environmental Protection Agency (EPA) and State Water Resources Control Board (SWRCB) drinking water quality standards related to chlorine residual at CHCF.
Files
| File | Type | Posted |
|---|---|---|
| C5613684-D_Notice_to_Contractors.pdf | ||
| Attachment_I_-_Geotechnical_Engineering_Report.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity