Attachment_I_-_Geotechnical_Engineering_Report.pdf

PDF 2 MB Posted

Attached to
C5613684-D CHCF Potable Water Treatment System
Solicitation number
0000040952
Issued by
San Joaquin County, Stockton City, California

About this file

Geotechnical Engineering Report Summary

This document is a Geotechnical Engineering Report prepared by Terracon for Kjeldsen Sinnock & Neudeck Inc. concerning the proposed CHCF Potable Water Treatment System located at 7707 Austin Rd in Stockton, San Joaquin County, California. The project involves construction of a single-story, approximately 660 square foot equipment building with steel framing and slab-on-grade flooring designed to house chemicals, pumps, instruments, and electronic control equipment for a potable water treatment facility. The geotechnical investigation included one soil boring advanced to 21.5 feet below ground surface and one cone penetrometer test (CPT) advanced to 100 feet, with laboratory testing performed on soil samples. The report was completed and delivered on February 25, 2025, under Terracon Project No. NA245149, based on the scope of services outlined in Terracon's email proposal dated October 11, 2024.

The subsurface characterization identified four distinct model layers consisting of very stiff fat clay, very stiff to hard lean clay with sand, medium stiff sandy silt, and loose to dense poorly graded sand with silt or clay. Groundwater was not encountered in the boring but was detected at approximately 54 feet below ground surface in the CPT. The site is classified as Site Class D under the 2022 California Building Code with seismic design parameters including a peak ground acceleration of approximately 0.422g. The report recommends a maximum net allowable bearing pressure of 2,000 psf for shallow foundations with estimated total settlement of less than one inch and differential settlement of approximately one-half inch. Critical recommendations address expansive soils present at the site through overexcavation of near-surface clays, placement of minimum 18 inches of compacted granular structural fill below floor slabs, and chemical treatment of building pads if enhanced stability is desired. The liquefaction potential is assessed as low, and the site is not located within a mapped flood zone or Alquist-Priolo Earthquake Fault Zone.

View the file

Other files

File Type Posted
C5613684-D_Notice_to_Contractors.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Report Cover Page

CHCF Potable Water

Treatment System Geotechnical Engineering Report

February 25, 2025 | Terracon Project No. NA245149

Prepared for:

Kjeldsen Sinnock & Neudeck Inc

1550 Harbor Blvd Ste 212

West Sacramento, CA 95691

902 Industrial Way

Lodi, CA 92540

P (209) 367-3701

Terracon.com

Facilities | Environmental | Geotechnical | Materials

Report Cover Letter to Sign

February 25, 2025

Kjeldsen Sinnock & Neudeck Inc

1550 Harbor Blvd Ste 212

West Sacramento, CA 95691

Attn: Neal Colwell, PE

P: 916-403-5900

E: ncolwell@ksninc.com

Re: Geotechnical Engineering Report

CHCF Potable Water Treatment System

7707 Austin Rd

Stockton, San Joaquin County, California 95215

Terracon Project No. NA245149

Dear Mr. Colwell:

We have completed the scope of Geotechnical Engineering services for the referenced project in general accordance with Terracon Email Proposal No. PNA245149 dated

October 11, 2024. This report presents the findings of the subsurface exploration and provides geotechnical recommendations concerning earthwork and the design and construction of foundations, and floor slabs for the proposed project.

We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report or if we may be of further service, please contact us.

Sincerely, Terracon

Yuchen Huang, P.E. Robert Fosse, G.E.

Senior Staff Engineer Senior Engineering Consultant

CHCF Potable Water Treatment System | Stockton, San Joaquin County, California 95215

Facilities | Environmental | Geotechnical | Materials i

Table of Contents Report Summary Introduction Project Description Site Conditions Geotechnical Characterization

Groundwater Conditions Geologic Hazards

Faulting and Estimated Ground Motions Liquefaction Flooding

Seismic Considerations Liquefaction Evaluation Corrosivity Geotechnical Overview

Expansive Soils Earthwork

Site Preparation Subgrade Preparation Chemically Treated Building Pad Excavation Soil Stabilization Fill Material Types Fill Placement and Compaction Requirements Utility Trench Backfill Grading and Drainage Earthwork Construction Considerations Construction Observation and Testing

Shallow Foundations Design Parameters – Compressive Loads Foundation Construction Considerations

Floor Slabs Floor Slab Design Parameters Floor Slab Construction Considerations Exterior Hardscape

General Comments

Figures GeoModel

Attachments

Facilities | Environmental | Geotechnical | Materials ii

Exploration and Testing Procedures Site Location and Exploration Plans

Exploration and Laboratory Results

Supporting Information

Note: This report was originally delivered in a web-based format. Blue Bold text in the report indicates a referenced section heading. The PDF version also includes hyperlinks which direct the reader to that section and clicking on the logo will bring you back to this page. For more interactive features, please view your project online at client.terracon.com.

Refer to each individual Attachment for a listing of contents.

http://client.terracon.com/

Facilities | Environmental | Geotechnical | Materials 1

Report Summary

Topic Overview Statement

Project

Description

The project includes construction of a single-story equipment building and associated utilities for a potable water treatment system. The building will be constructed to house the chemicals, pumps, instruments, and electronic control equipment.

Geotechnical

Characterization

Subgrade soils encountered in our boring generally consisted of very stiff fat clay overlays interbedded very stiff to hard, lean clay with various amounts of sand, medium stiff sandy silt, and loose to dense, poorly graded sand with various amounts of silt or clay.

Groundwater was not encountered in our boring but was encountered in the CPT at a depth of approximately 54 feet below the existing ground surface (bgs).

Earthwork

Cuts and fills on the order of 2 feet or less are anticipated for general grading to develop final grades.

Existing clays are not suitable for reuse as structural fill.

Clays are sensitive to moisture variation.

Foundations

Shallow foundations may be used for building support

Allowable bearing pressure = 2,000 psf

Expected settlements from construction loading:

< 1-inch total, < ½-inch differential

General

Comments

This section contains important information about the limitations of this geotechnical engineering report.

1. If the reader is reviewing this report as a pdf, the topics in the table can be used to access the appropriate section of the report by simply clicking on the topic itself.

2. This summary is for convenience only. It should be used in conjunction with the entire report for design purposes.

Facilities | Environmental | Geotechnical | Materials 2

Introduction

This report presents the results of our subsurface exploration and Geotechnical

Engineering services performed for the proposed CHCF Potable Water Treatment System to be located at 7707 Austin Rd in Stockton, San Joaquin County, California 95215. The purpose of these services was to provide information and geotechnical engineering recommendations relative to:

■ Subsurface soil conditions

■ Groundwater conditions

■ Seismic site classification per the 2022 California Building Code (CBC)

■ Site preparation and earthwork

■ Foundation design and construction

■ Floor slab design and construction

■ Liquefaction potential

The geotechnical engineering Scope of Services for this project included the advancement of test borings and a cone penetration test (CPT), laboratory testing, engineering analysis, and preparation of this report.

Drawings showing the site and boring/CPT locations are shown on the Site Location and

Exploration Plan, respectively. The results of the laboratory testing performed on soil samples obtained from the site during our field exploration are included on the boring logs in the Exploration and Laboratory Results section.

Project Description

Our initial understanding of the project was provided in our proposal and was discussed during project planning. A period of collaboration has transpired since the project was initiated, and our final understanding of the project conditions is as follows:

Item Description

Information

Provided

An email request for proposal was provided by Neal Colwell on

October 2, 2024. The request included a 100% construction drawing set, scope of services, and a google earth file of the planned development.

Project

Description

The project includes construction of a single-story equipment building and associated utilities. The building will be constructed to house the chemicals, pumps, instruments, and electronic control equipment.

Facilities | Environmental | Geotechnical | Materials 3

Item Description

Proposed

Structure

The proposed structure includes an approximately 660 square foot single story building.

Building

Construction

We anticipate construction will consist of steel framing with a slab-on-grade floor.

Finished Floor

Elevation

Not provided; we have assumed the finished floor is not more than 2 feet below/above existing grade.

Maximum Loads

Anticipated structural loads were not provided. In the absence of information provided by the design team, we used the following loads in estimating settlement based on our experience with similar projects.

■ Columns: 50 kips

■ Walls: 2 - 5 kips per linear foot (klf)

■ Slabs: 150 pounds per square foot (psf)

Grading

A preliminary grading plan was not available for review at the time this proposal was prepared.

We have assumed approximately 2 feet of cut and 2 feet of fill may be required to develop final grade, excluding remedial grading requirements.

Building Code 2022 California Building Code (CBC)

Terracon should be notified if any of this information is inconsistent with the planned construction, especially the grading limits, as modifications to our recommendations may be necessary.

Site Conditions

The following description of site conditions is derived from our site visit in association with the field exploration and our review of publicly available geologic and topographic maps.

Item Description

Parcel

Information

The project is located at 7707 Austin Rd in Stockton, San

Joaquin County, California 95215.

APN: 18110011

Latitude/Longitude: 37.9006° N, 121.1943° W

See Site Location

Facilities | Environmental | Geotechnical | Materials 4

Existing

Improvements

The project site is undeveloped, with three water tanks to the west, a water plant electrical building, a booster pump assembly, a 10,000-gallon hydro pneumatic tank, and a fire pump building to the south, and electrical equipment to the southeast. Asphalt pavement extends from the entrance to the site. The project site is within the California Health Care Facility.

Current Ground

Cover

The current groundcover consists of gravel with light native vegetation.

Existing

Topography

The property is relatively flat based on a review of Google Earth and observations made during our field exploration.

Geotechnical Characterization

We have developed a general characterization of the subsurface conditions based upon our review of the subsurface exploration, laboratory data, geologic setting, and our understanding of the project. This characterization, termed GeoModel, forms the basis of our geotechnical calculations and evaluation of the site. Conditions observed at each exploration point are indicated on the individual logs. The individual logs can be found in the Exploration and Laboratory Results and the GeoModel can be found in the

Figures attachment of this report.

As part of our analyses, we identified the following model layers within the subsurface profile. For a more detailed view of the model layer depths at each boring location, refer to the GeoModel.

Model

Layer Layer Name General Description

1 Fat Clay Very stiff fat clay

2 Lean Clay Very stiff to hard, lean clay with various amounts of sand

3 Sandy Silt Medium stiff sandy silt

4 Sand Loose to dense, poorly graded sand with various amounts of silt or clay

Additional borings, CPTs, auger probes, test pits, or geophysical testing could be performed to obtain more specific subgrade information.

Facilities | Environmental | Geotechnical | Materials 5

Groundwater Conditions

The boring was advanced using drilling techniques that allow short term groundwater observations to be made while drilling. The borehole was observed while drilling and after completion for the presence and level of groundwater. Pore pressure dissipation testing was also performed in the CPT to help determine groundwater levels. Groundwater was not encountered in our boring but was encountered in the CPT at a depth of approximately 54 feet bgs. The water level observed in the CPT can be found on the CPT log in Exploration and Laboratory Results section of this report.

Since the boring was backfilled relatively soon after completion, the water levels observed for the boring are not stable groundwater levels. Due to the low permeability of soils encountered in the boring, a relatively long period may be necessary for a groundwater level to develop and stabilize in a borehole. Long term observations in piezometers or observation wells sealed from the influence of surface water are often required to define groundwater levels in materials of this type. Long-term groundwater monitoring was outside the scope of services for this project. Terracon is experienced in installing groundwater monitoring wells/piezometers to provide more groundwater data prior to construction if required.

Nearby monitoring wells, operated and measured by the California Department of Water

Resources were researched for groundwater levels.

State

Well

Number

Well

Coordinates

(NAD83)

Approximate

Distance to the project location

Ground

Surface

Elevation

(NAVD88

ft)

Highest

Groundwater

Measurement

Elevation

(feet)

Depth to

Highest

Groundwater

(feet)

01N07E2

8R001M

37.9°N, 121.2025°W 2,400 feet 38.22 -18.08 56.3

01N07E2

7H002M

37.9084°N, 121.1842°W 4,100 feet 46.21 -1.49 47.7

01S07E0

3D001M

37.8834°N, 121.1991°W

1.2 miles 38.76 -10.74 49.5

Groundwater conditions may change because of seasonal variations in rainfall, runoff, and other conditions not apparent at the time the boring and CPT were performed.

Therefore, groundwater levels during construction or at other times in the life of the structure may be higher or lower than the levels indicated on the boring/CPT logs. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project.

Facilities | Environmental | Geotechnical | Materials 6

Geologic Hazards

Geologic maps indicate subsurface conditions at the site consist of late Pleistocene age

Modesto Formation, Upper member, fine-grained (Qmub)1. The subgrade soils encountered in our boring and CPT were generally consistent with mapped geology.

Faulting and Estimated Ground Motions

The site is located in the San Joaquin Valley of California, which is a relatively moderate seismicity region. The type and magnitude of seismic hazards affecting the site are dependent on the distance to causative faults, the intensity, and the magnitude of the seismic event. The following table indicates the distance of the fault zones and the associated maximum credible earthquake that can be produced by nearby seismic events, as calculated using the USGS Unified Hazard Tool. Segments of the West Tracy

Fault, which is located approximately 30 kilometers from the site, are considered to have the most significant effect at the site from a design standpoint.

Fault Name

Approximate

Contribution

Approximate

Distance to

Site

(kilometers)

Maximum

Credible

Earthquake

(MCE) Magnitude

WUS Branch Average:

West Tracy (1)

5.23 30.29 7.37

Based on the ASCE 7-16 Standard, the peak ground acceleration (PGAM) at the subject site is approximately 0.377g. Based on the USGS 2023 interactive Disaggregation, the

PGA at the subject site for a 2% probability of exceedance in 50 years (return period of

2475 years) is expected to be about 0.422g. The site is not located within an Alquist-

Priolo Earthquake Fault Zone based on our review of the State Fault Hazard Maps.2

1 Delattre, M.P., Graymer, R.W., Langenheim, V.E., Knudsen, K.L., Dawson, T.E., Brabb, E.E., Wentworth, C.M., and Raymond, L.A., 2023, Geologic and geophysical maps of the Stockton 30' x 60' quadrangle, California: California Geological Survey, Regional Geologic Map No. 5, scale 1:100,000

2 California Geological Survey (CGS), “California Earthquakes Hazards Zone Application (EQ Zapp)”, September 23, 2021, https://maps.conservation.ca.gov/cgs/EQZApp/app/.

Facilities | Environmental | Geotechnical | Materials 7

Liquefaction

Liquefaction is a mode of ground failure that results from the generation of high pore water pressures during earthquake ground shaking, causing loss of shear strength.

Liquefaction is typically a hazard where loose sandy soils or low plasticity fine grained soils exist below groundwater. The California Geological Survey (CGS) has designated certain areas within California as potential liquefaction hazard zones. These are areas considered at a risk of liquefaction-related ground failure during a seismic event, based upon mapped surficial deposits and the presence of a relatively shallow water table. The project site has not yet been evaluated by CGS for liquefaction hazards.

A liquefaction evaluation was performed to assess the potential for liquefaction to occur at the site. Details regarding the liquefaction evaluation are presented in the

Liquefaction Evaluation section of this report.

Flooding

Based on a review of the Federal Emergency Management Agency (FEMA) National Flood

Layer (NFHL), the project site is not located within a mapped flood zone. The project site is in an area with a FEMA Flood Zone X designation (area of minimal flood hazard).

Seismic Considerations

The 2022 California Building Code (CBC) Seismic Design Parameters have been generated using the SEAOC/OSHPD Seismic Design Maps Tool. This web-based software application calculates seismic design parameters in accordance with ASCE 7-16, and

2022 CBC. The 2022 CBC requires that a site-specific ground motion study be performed in accordance with Section 11.4.8 of ASCE 7-16 for Site Class D sites with a mapped Ss value greater than or equal 0.2. Therefore, the project is subject to a requirement for site-specific ground motion hazard analysis in accordance with ASCE 7, 21.2.

An exception to this requirement is included in Supplement 3 to ASCE 7 that states: “A ground motion hazard analysis is not required where the value of the parameter SM1 determined by Eq. (11.4-2) is increased by 50% for all applications of SM1 in this standard. The resulting value of the parameter SD1 determined by Eq. (11.4-4) shall be used for all applications of SD1 in the Standard.”

Based on this exception, the spectral response accelerations presented in the following table were calculated using the site coefficients (Fa and Fv) from Tables 1613.2.3(1) and

1613.2.3(2) presented in Section 16.4.4 of the 2022 CBC and include values consistent with the Supplement 3 exception language.

Facilities | Environmental | Geotechnical | Materials 8

Description Value

2022 California Building Code (CBC) Site Classification1 D2

Risk Category IV

Site Latitude3 37.9006º N

Site Longitude3 121.1943º W

SS, Spectral Acceleration for a Short Period4 0.686

S1, Spectral Acceleration for a 1-Second Period4 0.272

Fa, Site Coefficient 1.252

Fv, Site Coefficient (1-Second Period) 2.056

SDS, Spectral Acceleration for a Short Period 0.572

SD1, Spectral Acceleration for a 1-Second Period 0.5605

1. Seismic site soil classification in general accordance with the 2022 California

Building Code, which refers to ASCE 7-16. Site Classification is required to determine the Seismic Design Category for a structure.

2. The Site Classification is based on the upper 100 feet of the site profile defined by a weighted average value of either shear wave velocity, standard penetration resistance, or undrained shear strength in accordance with Section 20.4 of ASCE

7-16 and the 2022 CBC. Subsurface explorations at this site were extended to a maximum depth of approximately 21½ feet bgs for soil boring and a maximum depth of approximately 100 feet bgs where shear wave velocity was measured with a

CPT. The site properties below the maximum exploration depth to 100 feet were estimated based on our experience and knowledge of geologic conditions of the general area. Additional deeper exploration or geophysical testing may be performed to confirm the conditions below the current maximum depth of exploration.

3. Provided coordinates represent a point located at the general center of the site.

4. These values were obtained using online seismic design maps and tools provided by SEAOC and OSHPD (https://seismicmaps.org/).

5. The value of SD1 is increased by 50% for structural design in accordance with the exception in ASCE 7-16 Supplement 3, Section 11.4.8.

A site-specific ground motion study may reduce construction costs. We recommend consulting with a structural engineer to evaluate the need for such a study and its https://seismicmaps.org/

Facilities | Environmental | Geotechnical | Materials 9 potential impact on construction costs. Terracon should be contacted if a site-specific ground motion study is desired.

Liquefaction Evaluation

We performed a liquefaction hazard evaluation in general compliance with the California

Geological Survey (CGS) Special Publication 117A (2008) and the Southern California

Earthquake Center “Recommended Procedures for Implementation of DMG Special

Publication 117 Guidelines for Analyzing and Mitigating Liquefaction Hazards in

California,” 1999 report.

As recommended in these reports, we performed a screening analysis to determine if there is a potential for liquefaction to occur at the site. We evaluated the soils encountered in our boring advanced to a maximum depth of 21½ feet below the existing ground surface (bgs), and CPT sounding to a depth of 100 feet. We evaluated these soils based on soil classification, corrected SPT blow counts, water content, Atterberg limits, groundwater elevation, shear strength, peak ground acceleration, and CPT data. In our screening investigation we also looked at the Atterberg limit for cohesive soils in the upper 20 feet of our soil boring. The Atterberg limit for these cohesive soils exhibited a liquid limit of 51 and a plasticity index of 33. We also calculated the ratio of the in-situ moisture content to the liquid limit. This data was then compared to the criteria by Idriss and Boulanger (2006) and Bray and Sancio (2006) for potential liquefaction or cyclic softening of fine-grained soils. The cohesive soils classify as “clay-like” and non-liquefiable by Idriss/Boulanger and have a low susceptibility to liquefaction by

Bray/Sancio. Based on our review of this data and the absence of groundwater encountered in the shallow test boring, and depth of over 50 feet in the CPT sounding, it is our opinion that the potential for liquefaction to occur at this site is low.

Corrosivity

The following table lists the results of laboratory soluble sulfate, soluble chloride, electrical resistivity, and pH testing. The values may be used to estimate potential corrosive characteristics of the on-site soils with respect to contact with the various underground materials which will be used for project construction.

Corrosivity Test Results Summary

Boring

Sample

Depth

(feet)

Soil

Description

Soluble

Sulfate

Soluble

Chloride

Electrical

Resistivity

(Ω-cm) pH

B1 1 – 2½ Fat Clay 0.026 0.014 600 8.03

Facilities | Environmental | Geotechnical | Materials 10

Results of soluble sulfate testing can be classified in accordance with ACI 318 – Building

Code Requirements for Structural Concrete. Numerous sources are available to characterize corrosion potential to buried metals using the parameters presented in the previous table. ANSI/AWWA is commonly used for ductile iron, while threshold values for evaluating the effect on steel can be specific to the buried feature (e.g., piling, culverts, welded wire reinforcement, etc.) or agency for which the work is performed. Imported fill materials may have significantly different properties than the site materials noted in the table and should be evaluated if expected to be in contact with metals used for construction. Consultation with a NACE certified corrosion professional is recommended for buried metals on the site.

Mapping by the NRCS includes qualitative severity of corrosion to concrete and steel.

Based on this source, the near-surface materials are rated “Low” for corrosion to concrete and “High” for corrosion of steel.

Geotechnical Overview

The subject site has geotechnical considerations that will affect the construction and performance of the proposed improvements that are discussed in this report. The primary geotechnical consideration that has been identified at the subject site that will affect development is the following:

■ Expansive Soils

Expansive Soils

Expansive soils are present on this site. This report provides recommendations to help mitigate the effects of soil shrinkage and expansion. However, even if these procedures are followed, some movement and (at least minor) cracking in the structure should be anticipated. The severity of cracking and other damage such as uneven floor slabs will probably increase if modification of the site results in excessive wetting or drying of the expansive soils. Eliminating the risk of movement and distress may not be feasible, but it may be possible to further reduce the risk of movement if more expensive measures are used during construction such as chemically treating the subgrade soils.

The near surface soil could become unstable with typical earthwork and construction traffic, especially after precipitation events. The effective drainage should be completed early in the construction sequence and maintained after construction to avoid potential issues. If possible, the grading should be performed during the warmer and drier times of the year. If grading is performed during the winter months, an increased risk for possible undercutting and replacement of unstable subgrade will persist. Additional site

Facilities | Environmental | Geotechnical | Materials 11 preparation recommendations, including subgrade improvement and fill placement, are provided in the Earthwork section.

The soils which form the bearing stratum for shallow foundations are plastic and exhibit potential for shrink-swell movements with changes in moisture. Additional areas of localized highly plastic soils are likely present where boring was not performed.

Maintaining above optimum moisture conditions in the bearing soils and a minimum dead load pressure on footings should reduce the anticipated swell movements to tolerable levels. The Shallow Foundations section addresses support of the building addition directly bearing on native soils. We do not expect significant dead load on the floors and recommend overexcavation of near-surface clays to reduce the heave potential. The Floor Slabs section addresses slab-on-grade support of the building addition using overexcavation techniques.

Earthwork

We anticipate general grading may consist of cuts and fills on the order of 2 feet or less and that site grades will be within 2 feet of existing ground elevation. Specific site grading information was unavailable at the time this report was prepared. If elevation and site grading differ from our stated assumptions, Terracon should be contacted to determine if additional earthwork recommendations are warranted, particularly with regard to potential ground settlement.

Earthwork is anticipated to include clearing and grubbing, excavations, and engineered fill placement. The following sections provide recommendations for use in the preparation of specifications for the work. Recommendations include critical quality criteria, as necessary, to render the site in the state considered in our geotechnical engineering evaluation for foundations and floor slabs.

Site Preparation

Prior to placing fill, existing vegetation, topsoil, and root mats should be removed.

Complete stripping of the topsoil should be performed in the proposed building. Stripping should extend laterally a minimum of 5 feet beyond the limits of proposed improvements.

Although no evidence of fill or underground facilities (such as septic tanks, cesspools, basements, and utilities) was observed during the exploration, such features could be encountered during construction. If unexpected fills or underground facilities are encountered, such features should be removed, and the excavation thoroughly cleaned prior to backfill placement and/or construction.

Facilities | Environmental | Geotechnical | Materials 12

Subgrade Preparation

After clearing, any required cuts and overexcavation should be made.

The native subgrade soils should be overexcavated below floor slab areas to allow for the placement of at least 18 inches of granular structural fill below the floor slab.

Excavated material may be stockpiled for use as fill provided it is cleaned of organic material, debris, and any other deleterious material and meets the criteria for general or structural fill specified in the Fill Material Types section of this report.

Once cuts and overexcavation operations are complete, the resulting subgrade should be proofrolled with an adequately loaded vehicle such as a fully loaded tandem-axle dump truck, if possible. The proofrolling should be performed under the observation of the

Geotechnical Engineer or their representative. Areas excessively deflecting under the proofroll should be delineated and subsequently addressed by the Geotechnical

Engineer. Such areas should either be removed or modified by stabilizing as noted in the following section Soil Stabilization. Excessively wet or dry material should either be removed, or moisture conditioned and recompacted.

Once proof rolling has been performed, all exposed areas which will receive fill, once properly cleared, should be scarified, moisture conditioned as necessary, and compacted per the compaction requirements in this report. The depth of scarification of subgrade soils and moisture conditioning of the subgrade is highly dependent upon the time of year of construction and the site conditions that exist immediately prior to construction.

If construction occurs during the winter or spring, when the subgrade soils are typically already in a moist condition, scarification and compaction may only be 8 inches. If construction occurs during the summer or fall when the subgrade soils have been allowed to dry out deeper, the depth of scarification and moisture conditioning may be as much as 18 inches or more. A representative from Terracon should be present to observe the exposed subgrade and confirm the depth of scarification and moisture conditioning required.

Following scarification, moisture conditioning, and compaction of the subgrade soils, compacted structural fill soil should then be placed to the proposed design grade and the moisture content and compaction of subgrade soils should be maintained until foundation and floor slab construction.

Based upon the subsurface conditions determined from the geotechnical exploration, subgrade soils exposed during construction are anticipated to be relatively workable;

however, the workability of the subgrade may be affected by precipitation, repetitive construction traffic or other factors. If unworkable conditions develop, workability may be improved per the recommendations provided in the Soil Stabilization section of this report.

Facilities | Environmental | Geotechnical | Materials 13

Chemically Treated Building Pad

If it is chosen to support the building on a chemically treated building pad, a 24-inch-thick section of the native subgrade soils shall be treated with high calcium quicklime, Portland Type II cement, or a combination of both across the building footprint beginning at the bottom elevation of proposed shallow footing foundation and extending

24 inches deep below the foundation to create a more stiff and rigid foundation support system. The cement treatment should be uniform across the entire building footprint and extend at least 3 feet beyond the perimeter of the building.

For estimating purposes, we recommend using 4.5 percent high calcium quicklime or 6.0 percent Portland cement and a soil unit weight of 115 pounds per cubic foot. The actual amount of cement to be used should be determined by Terracon and by laboratory testing at least three weeks prior to the start of grading operations. The chemically treated material should be compacted to at least 95 percent relative compaction per

ASTM D1557 and have a minimum unconfined compressive strength of 350 pounds per square inch.

Excavation

We anticipate that excavations for the proposed construction can be accomplished with conventional earthmoving equipment. The bottom of excavations should be thoroughly cleaned of loose/soft soils and disturbed materials prior to backfill placement and/or construction.

Onsite soils may consist of cohesionless sandy soils in some areas. Such soils have the tendency to cave and slough during excavations. Therefore, formwork may be needed for foundation excavations.

Individual contractors are responsible for designing and constructing stable, temporary excavations. Excavations should be sloped or shored in the interest of safety following local, and federal regulations, including current OSHA excavation and trench safety standards.

Soil Stabilization

Methods of subgrade stabilization, as described in this section, could include scarification, moisture conditioning and recompaction, removal of unstable materials and replacement with granular fill (with or without geosynthetics), and chemical stabilization.

The appropriate method of improvement, if required, would be dependent on factors such as schedule, weather, the size of area to be stabilized, and the nature of the instability. More detailed recommendations can be provided during construction as the need for subgrade stabilization occurs. Performing site grading operations during warm

Facilities | Environmental | Geotechnical | Materials 14 seasons and dry periods would help reduce the amount of subgrade stabilization required.

If the exposed subgrade is unstable during proofrolling operations, it could be stabilized using one of the following methods:

■ Scarification and Recompaction - It may be feasible to scarify, dry, and recompact the exposed soils. The success of this procedure would depend primarily upon favorable weather and sufficient time to dry the soils. Stable subgrades likely would not be achievable if the thickness of the unstable soil is greater than about 1 foot, if the unstable soil is at or near groundwater levels, or if construction is performed during a period of wet or cool weather when drying is difficult.

■ Aggregate Base - The use of Caltrans Class II aggregate base is a common procedure to improve subgrade stability. Typical undercut depths would be expected to range from about 6 to 18 inches below finished subgrade elevation.

The use of high modulus geosynthetics (i.e., engineering fabric or geogrid) could also be considered after underground work such as utility construction is completed. Prior to placing the fabric or geogrid, we recommend that all below grade construction, such as utility line installation, be completed to avoid damaging the fabric or geogrid. Equipment should not be operated above the fabric or geogrid until one full lift of aggregate base is placed above it. The maximum particle size of granular material placed over geotextile fabric or geogrid should meet the manufacturer’s specifications.

■ Chemical Stabilization - Improvement of subgrades with Portland cement or quicklime could be considered for improving unstable soils. Chemical stabilization should be performed by a pre-qualified contractor having experience with successfully stabilizing subgrades in the project area on similar sized projects with similar soil conditions. The hazards of chemicals blowing across the site or onto adjacent property should also be considered. Additional testing would be needed to develop specific recommendations to improve subgrade stability by blending chemicals with the site soils. Additional testing could include, but not be limited to, determining the most suitable stabilizing agent, the optimum amounts required, and the presence of sulfates in the soil. If this method is chosen to stabilize subgrade soils the actual amount of high calcium quicklime/Portland cement to be used should be determined by Terracon and by laboratory testing at least three weeks prior to the start of grading operations.

Further evaluation of the need and recommendations for subgrade stabilization can be provided during construction as the geotechnical conditions are exposed.

Facilities | Environmental | Geotechnical | Materials 15

Fill Material Types

Fill required to achieve design grade should be classified as structural fill and general fill.

Structural fill is material used below, or within 5 feet of structures. General fill is material used to achieve grade outside of these areas.

Reuse of On-Site Soil: On-site clay soil is not suitable for reuse as structural fill but may be used as general fill. Other excavated on-site soil may be selectively reused as general or structural fill. Material property requirements for on-site soil for use as general fill and structural fill are noted in the following table:

Property Structural Fill General Fill

Composition Free of deleterious material Free of deleterious material

Maximum particle size 3 inches

6 inches

(or 2/3 of the lift thickness)

Fines content Less than 50% Passing No.

200 sieve Not limited

Plasticity

Maximum liquid limit of 30

Maximum plasticity index of 10

Expansion Index less than 20

Not limited

GeoModel Layer

Expected to be Suitable1 4 1, 2, 3, 4

1. Based on subsurface exploration. Actual material suitability should be determined in the field at time of construction.

Imported Fill Materials: Imported fill materials should meet the following material property requirements. Regardless of its source, compacted fill should consist of approved materials that are free of organic matter and debris. For all import material, the contractor shall submit current verified reports from a recognized analytical laboratory indicating that the import has a “not applicable” (Class S0) potential for sulfate attack based upon current ACI criteria and is “mildly corrosive” to ferrous metal and copper. The reports shall be accompanied by a written statement from the contractor that the laboratory test results are representative of all import material that will be brought to the project.

Facilities | Environmental | Geotechnical | Materials 16

Soil Type1

USCS

Classification

Acceptable Parameters

(for Structural Fill)

Low Plasticity CL, SC

Liquid Limit maximum 30

Plasticity index maximum 10

Less than 50% passing No. 200 sieve

Granular2 GW, GM, SW, SM Less than 40% passing No. 200 sieve

1. Structural and general fill should consist of approved materials free of organic matter and debris and should contain no material larger than 3 inches and 6 inches in greatest dimension, respectively. A sample of each material type should be submitted to the Geotechnical Engineer for evaluation at least two weeks prior to use on this site.

2. Caltrans Class II aggregate base may be used for this material. Recycled aggregate base should not be used without prior approval by the Geotechnical

Engineer.

Fill Placement and Compaction Requirements

Compacted native soil and structural and general fill should meet the following compaction requirements.

Item Structural Fill General Fill

Maximum Lift

Thickness

8 inches or less in loose thickness when heavy, self-propelled compaction equipment is used

4 to 6 inches in loose thickness when hand-guided equipment (i.e. jumping jack or plate compactor) is used

Same as structural fill

Minimum

Compaction

Requirements 1,2

95% of max. for structural fill below foundations and slabs, for aggregate base and chemically treated soil, and for fills thicker than 5 feet

90% of max. for all other locations

90% of max.

Water Content

Range

Low plasticity cohesive: +1% to +3% above optimum

Medium plasticity cohesive: +2% to +4% above optimum

High plasticity cohesive: +3% to +5% above optimum

As required to achieve min.

compaction requirements

Facilities | Environmental | Geotechnical | Materials 17

Item Structural Fill General Fill

1. Maximum density and optimum water content as determined by the Modified

Proctor test (ASTM D 1557).

2. If the granular material is a coarse sand or gravel, or of a uniform size, or has a low fines content, compaction comparison to relative density may be more appropriate. In this case, granular materials should be compacted to at least

70% relative density (ASTM D 4253 and D 4254). Materials not amenable to density testing should be placed and compacted to a stable condition observed full time by the Geotechnical Engineer or representative.

Utility Trench Backfill

Any soft or unsuitable materials encountered at the bottom of utility trench excavations should be removed and replaced with structural fill or bedding material in accordance with public works specifications for the utility be supported. Trench excavation should not be conducted below a downward 1:1 projection from existing foundations without engineering review of shoring requirements and geotechnical observation during construction.

On-site materials are considered suitable for backfill of utility and pipe trenches from 1 foot above the top of the pipe to the final ground surface, provided the material is free of organic matter and deleterious substances. Where trenches are placed beneath slabs or footings, the backfill should satisfy the gradation and Atterberg limit requirements for structural fill discussed in this report.

Trench backfills should be mechanically placed and compacted as discussed earlier in this report. Compaction of initial lifts should be accomplished with hand-operated tampers or other lightweight compactors. Flooding or jetting for placement and compaction of backfill is not recommended.

All trench excavations should be made with sufficient working space to permit construction including backfill placement and compaction. If utility trenches are backfilled with relatively clean granular material, they should be capped with at least 18 inches of cementitious flowable fill or cohesive fill in non-pavement areas to reduce the infiltration and conveyance of surface water through the trench backfill. Attempts should also be made to limit the amount of fines migration into the clean granular material. Fines migration into clean granular fill may result in unanticipated localized settlements over a period of time. To help limit the amount of fines migration, Terracon recommends the use of a geotextile fabric that is designed to prevent fines migration in areas of contact between clean granular material and fine-grained soils. Terracon also recommends that clean granular fill be tracked or tamped in place where possible to limit the amount of future densification which may cause localized settlements over time.

Facilities | Environmental | Geotechnical | Materials 18

For low permeability subgrades, utility trenches are a common source of water infiltration and migration. Utility trenches penetrating beneath the building should be effectively sealed to restrict water intrusion and flow through the trenches, which could migrate below the building. The trench should provide an effective trench plug that extends at least 5 feet from the face of the building exterior. The plug material should consist of cementitious flowable fill or low permeability clay. The trench plug material should be placed to surround the utility line. If used, the clay trench plug material should be placed and compacted to comply with the water content and compaction recommendations for structural fill stated previously in this report.

If chemical treatment of subgrade soils occurs before utility construction, Controlled Low

Strength Material (CLSM) or sand/cement slurry should be used as backfill material to cap utility trenches in all areas where trenches have cut through the treated subgrade.

The thickness of the CLSM or slurry should be at least the thickness or depth of chemically treated subgrade. Below that depth, imported structural fill or moisture conditioned native clay may be used for backfill. Such areas trenched through chemically treated soil should not be backfilled with aggregate base, native soil, or disturbed chemically treated soil.

Grading and Drainage

All grades must provide effective drainage away from the building during and after construction and should be maintained throughout the life of the structure. Water retained next to the building can result in soil movements greater than those discussed in this report. Greater movements can result in unacceptable differential floor slab and/or foundation movements, cracked slabs and walls, and roof leaks. The roof should have gutters/drains with downspouts that discharge onto splash blocks a distance of at least 10 feet from the building, onto pavements, or are tied to tight lines that discharge into a storm drain system.

Exposed ground should be sloped and maintained at a minimum 5 percent away from the building for at least 10 feet beyond the perimeter of the building. If a minimum 5 percent slope cannot be achieved due to site grades, a minimum 2½ percent slope could be used provided pavement or hardscape surrounds and extends to the building, or a subdrain could be installed around the perimeter of the foundations that carries water away from the building. Locally, flatter grades may be necessary to transition ADA access requirements for flatwork. After building construction and landscaping have been completed, final grades should be verified to document effective drainage has been achieved. Grades around the structure should also be periodically inspected and adjusted, as necessary, as part of the structure’s maintenance program. Where paving or flatwork abuts the structure, a maintenance program should be established to effectively seal and maintain joints and prevent surface water infiltration.

Facilities | Environmental | Geotechnical | Materials 19

Any planters and/or bio-swales located within 10 feet of the building should be self-contained or lined with an impermeable membrane to prevent water from accessing subgrade soils below the building. Sprinkler mains and spray heads should be located a minimum of 5 feet away from the foundation lines.

Implementation of adequate drainage for this project can affect the surrounding developments. Consequently, in addition to designing and constructing drainage for this project, the effects of site drainage should be taken into consideration for the planned structures on this property, the undeveloped portions of this property, and surrounding sites. Extra care should be taken to ensure irrigation and drainage from adjacent areas do not drain onto the project site or saturate the construction area.

Earthwork Construction Considerations

Shallow excavations for the proposed structure are anticipated to be accomplished with conventional construction equipment. Upon completion of filling and grading, care should be taken to maintain the subgrade water content prior to construction of grade-supported improvements such as floor slabs, and exterior hardscape. Construction traffic over the completed subgrades should be avoided to the extent practical. The site should also be graded to prevent ponding of surface water on the prepared subgrades or in excavations. Water collecting over or adjacent to construction areas should be removed.

If the subgrade should become desiccated, saturated, or is disturbed, the affected material should be removed, or the materials should be scarified, moisture conditioned, and recompacted prior to construction.

We recommend that the earthwork portion of this project be completed during extended periods of dry weather if possible. If earthwork is completed during the wet season

(typically November through April) it may be necessary to take extra precautionary measures to protect subgrade soils. Wet season earthwork operations may require additional mitigation measures beyond that which would be expected during the drier summer and fall months. This could include ground stabilization utilizing chemical treatment of the subgrade, diversion of surface runoff around exposed soils, and draining of ponded water on the site. Once subgrades are established, it may be necessary to protect the exposed subgrade soils from construction traffic.

As a minimum, excavations should be performed in accordance with OSHA 29 CFR, Part

1926, Subpart P, “Excavations” and its appendices, and in accordance with any applicable local and/or state regulations. Stockpiles of soil, construction materials, and construction equipment should not be placed near trenches or excavations.

Construction site safety is the sole responsibility of the contractor who controls the means, methods, and sequencing of construction operations. Under no circumstances shall the information provided herein be interpreted to mean Terracon is assuming

Facilities | Environmental | Geotechnical | Materials 20 responsibility for construction site safety or the contractor's activities; such responsibility shall neither be implied nor inferred.

Construction Observation and Testing

The earthwork efforts should be observed by the Geotechnical Engineer. Observation should include documentation of adequate removal of surficial materials (vegetation, topsoil, and debris), evaluation and remediation of existing fill materials, if encountered, as well as proofrolling and mitigation of unsuitable areas delineated by the proofroll.

Additionally, due to the critical nature of the proposed ground improvement methods, full time observations should be performed for the chemical treated building pad.

Each lift of compacted fill should be tested, evaluated, and reworked, as necessary, as recommended by the Geotechnical Engineer prior to placement of additional lifts. Each lift of fill should be tested for density and water content at a frequency of at least one test for every 1,000 square feet of compacted fill in the building area. Where not specified by local ordinance, one density and water content test should be performed for every 50 linear feet of compacted utility trench backfill and a minimum of one test performed for every 12 vertical inches of compacted backfill.

In areas of foundation excavations, the bearing subgrade should be evaluated by the

Geotechnical Engineer. If unanticipated conditions are observed, the Geotechnical

Engineer should prescribe mitigation options.

In addition to the documentation of the essential parameters necessary for construction, the continuation of the Geotechnical Engineer into the construction phase of the project provides the continuity to maintain the Geotechnical Engineer’s evaluation of subsurface conditions, including assessing variations and associated design changes.

Shallow Foundations

The proposed building addition may be supported by spread footings. If the site has been prepared in accordance with the requirements noted in Earthwork, the following design parameters are applicable for shallow foundations.

Design Parameters – Compressive Loads

Item Description

Maximum Net Allowable Bearing

Pressure 1, 2

2,000 psf

Required Bearing Stratum Firm native soil or structural fill

Facilities | Environmental | Geotechnical | Materials 21

Minimum Foundation Dimensions Per CBC 1809.7

Maximum Foundation Dimensions Columns: 7 feet

Continuous: 5 feet

Passive Resistance 4, 8

(equivalent fluid pressures) 250 pcf (cohesive backfill)

Sliding Resistance 5, 8

0.35

Minimum Embedment below

Finished Subgrade

24 inches

Estimated Total Settlement from

Structural Loads

Less than about 1 inch

Estimated Differential Settlement 2, 7

About ½ of total settlement

1. The maximum net allowable bearing pressure is the pressure in excess of the minimum surrounding overburden pressure at the footing base elevation.

This is the start of the file's text. The full file is on GovTribe.