Buford Highway Cast Iron Pipe Replacement – Sec A

Awarded State & local contract opportunity Posted

Solicitation number
BL139-22
State
Georgia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

Gwinnett County Board of Commissioners is requesting sealed bids for the Buford Highway Cast Iron Pipe Replacement—Section A (BL139-22), a water utility infrastructure project, with bids due December 15, 2022 at 2:50 p.m. and a pre-bid conference on December 1, 2022 at 10:00 a.m. Contractors must be pre-qualified under the Gwinnett County Annual Prequalification program for Pressurized Water Mains (Medium) with 16-inch to less than 24-inch diameter and appurtenances prior to bid submission; bids from non-prequalified contractors will not be considered.

The scope encompasses approximately 4,750 linear feet of 16-inch ductile iron pipe water main installation along Buford Highway between Old Peachtree Road and Sugarloaf Parkway, including branch connections, tie-ins, abandonment of existing parallel cast iron mains, service line reconnections, traffic control, and erosion control. The project requires installation of four 16-inch butterfly valves at specified stations with a fifth unit for contingency, asphaltic exterior coating on all ductile iron pipe, and site restoration. The base bid includes approximately 30 line items covering materials and labor, with 15 owner-directed supplemental work items that may be executed at the owner's discretion during construction.

Four vendors submitted bids. The Dickerson Group, Inc., was recommended as the apparent low bidder with a total bid of $2,564,646.47 (base bid $2,113,560.00 plus owner-directed items $342,035.00). The next lowest bids were Reeves Young, LLC at $2,745,850.00, JDS, Inc. at $2,564,580.00, and Mid-South Builders, Inc. at $3,629,925.00.

The contract completion timeline is 250 consecutive calendar days for substantial completion and 300 calendar days for final completion from Notice to Proceed. Liquidated damages are $1,000 per day for substantial completion delays and $500 per day for final completion delays. Contractors must hold a current valid Utility Contractors License and provide a Bid Bond or certified check equal to five percent of the total bid amount. Construction Drawings and Specifications are available from Barge Design Solutions for a non-refundable $200 fee. Questions were due by 3:00 p.m. on December 6, 2022.

Opportunity text

A pre-bid conference is scheduled for 10:00 A.M. on December 01, 2022 The Pre-Bid meeting will begin in the parking lot of the Dollar General located at 2696 Old Peachtree Road, Duluth, GA 30097 near the Intersection of Old Peachtree Road and Buford Highway. If there is inclement (cold or raining) weather the meeting will begin inside the McDonalds next door.

Files

File Type Posted
Award Information —
BL139-22 Notice —
BL139-22 ADD1 —

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity