This is Addendum #1 to a competitive sealed bid solicitation issued by Gwinnett County, Georgia, for the Buford Highway Cast Iron Pipe Replacement Section A project (BL139-22). The project involves the replacement of cast iron pipe with ductile iron pipe and includes work such as directional boring for utility crossings, installation of butterfly valves, and restoration of paved and unpaved areas. Key specifications include the installation of four 16-inch butterfly valves at designated stations (0+11, 9+99, 16+09, 36+25) with a fifth unit included for contingency, standard asphaltic exterior coating on all ductile iron pipe with polyWrapping to specified station limits, and 6 inches of #57 stone bedding in paved areas only. A pre-bid conference was scheduled for December 1, 2022, at 10:00 A.M. in the parking lot of the Dollar General at 2696 Old Peachtree Road, Duluth, Georgia. The addendum confirms that there is no change to the bid submission due date and time, and all bidders must acknowledge receipt of this addendum on the bid form to avoid their proposals being deemed non-responsive. The plan holders list as of December 7, 2022, includes six plan holders representing construction firms from Georgia and Kentucky.
Gwinnett County expects each contractor to submit a competitive price, with award to be made to the lowest responsive and responsible bidder. The project has approved funding, though no specific budget amount is disclosed in the addendum. The Georgia Department of Transportation (GDOT) permit (Permit #1275698) has been approved but will not be activated until after project award and Notice to Proceed issuance, with no special permit stipulations noted. The addendum addresses multiple bidder questions regarding specifications, including clarifications on ductile iron pipe coating requirements, bedding specifications for box culvert crossings, and valve pressure ratings, all of which reference the project's specification sections and plan details available through the online plan room at bidding.bargedesign.com.
Text of this file
December 8, 2022
ADDENDUM #1
BUFORD HIGHWAY CAST IRON PIPE REPLACEMENT
SECTION A
BL139-22
THERE IS NO CHANGE TO THE BID SUBMISSION DUE DATE AND TIME.
QUESTIONS AND RESPONSES:
Q1. Are there any portions of the project that will need to be Bored?
A1. See plan set and bidding documents, viewable at no cost via the online plan room at bidding.bargedesign.com.
Q2. Are the crossings to be Jack & Bored or Directionally Bored?
A2. See plan set and bidding documents, viewable at no cost via the online plan room at bidding.bargedesign.com.
Q3. What are the approximate lengths and diameters of the portions to be bored?
A3. See plan set and bidding documents, viewable at no cost via the online plan room at bidding.bargedesign.com.
Q4. How much is the required bid bond for the project?
A4. See plan set and bidding documents, viewable at no cost via the online plan room at bidding.bargedesign.com.
Q5. How much is the cost estimate of the project?
A5. There is approved funding for this project. Gwinnett County expects each contractor to bid a competitive price. Award will be made to the lowest responsive and responsible bidder.
Q6. Please provide a plan holders list.
A6. The current plan holders list is attached to this Addendum.
Q7. Regarding 16-inch butterfly valves, the plans show a quantity of 2 valves, but the bid calls out a quantity of 5. Can you please confirm the total quantity required for the project?
A7. There are (4) 16-inch butterfly valves in the project. Locations for these valves are at these stations: 0+11, 9+99, 16+09, 36+25. A fifth is included for contingency.
Q8. The specification calls out 150B pressure rating on the butterfly valves but Gwinnett County typically uses 250B pressure rating. Can you please confirm the rating for the valve?
A8. Butterfly valves shall conform to specification section 33 12 16, Section 2.2B.
BUFORD HIGHWAY CAST IRON PIPE REPLACEMENT
SECTION A
BL139-22
Q9. Regarding 16-inch ductile iron pipe, the specification below, pipe buried underground shall have standard asphaltic coating, and pipe within 10 feet of utility shall be zinc coated. The bid list doesn’t call out any zinc pipe. Please confirm if any pipe will be laid within 10 feet of a utility and require zinc coating.
A9. See revisions to specifications item 1 below.
Q10. Plan Details CD02.A shows bedding detail of 6” of 57 stone on Ductile Iron Pipe can you please confirm this is required?
A10. The detail shown on CD02.A shows the requirements for all paved areas.
Q11. What details are required for asphalt and concrete driveways?
A11. See specification 34 71 00-3.3 for asphalt driveways and detail on plan sheet CD.02, detail G6.
Q12. Is zinc coated ductile iron pipe required for the entire length of the project?
A12. See revisions to specifications item 1 below.
Q13. Will any modifications be necessary to the existing 8” valve vault @ STA 36+31 or is all work to tie this vault into the new 16” main outside the vault?
A13. No modifications will be necessary to the existing 8” valve vault at station 36+31.
Q14. Is “6” minimum pipe bedding, #57 stone” note shown in “Typical DIP Water Main Paved Area
Trench” the only areas of this pipeline to received bedding stone?
A14. The detail shown on DC02.A shows the requirements for all paved areas. The 6” of #57 stone for pipe bedding are not required in unpaved locations. See detail G3 on plan sheet CD.01.
Q15. What type of bedding restoration is required for 42” x 72” box culvert at 16” crossing in Buford Hwy shown near STA 17+75?
A15. See revisions to specifications item 2 below.
Q16. Can GDOT permit stipulations be provided?
A16. The GUPS permit has been approved by GDOT (Permit #1275698) but not yet activated. It will be activated after this project is awarded and NTP is issued. There were no permit stipulations indicated in the approval issued by GDOT.
Q17. Is the Test Pit Repair Detail, CD.02A, required for patching existing pavement where existing valve boxes are removed from paved areas?
A17. Yes, this detail is required.
BUFORD HIGHWAY CAST IRON PIPE REPLACEMENT
SECTION A
BL139-22
REVISIONS TO DRAWINGS
1. None.
REVISIONS TO SPECIFICATIONS
1. Volume 2, General Special Provisions page GSP-4:
ADD the following:
“Reference page 33 11 13.05-7 Section H. In lieu of the standard specification coating requirements referenced, ductile iron pipe for this project shall have standard asphaltic exterior coating per specification section 33 11 13.05-2.2.A.1. Pipe shall be polywrapped to the station limits shown on the drawing profiles.”
2. Volume 2, General Special Provisions page GSP-4:
ADD the following:
“Reference page 31 23 00-20. After section 3.09.9:
D. Backfilling under and around box culverts: Contractor shall backfill under and around box culverts crossed by the pipeline with GAB from the top of pipe bedding to bottom of roadway subgrade a minimum of 5 feet before and after the culvert crossing.”
ATTACHMENTS:
1. Planholders List Current as of December 7, 2022.
This addendum should be acknowledged on Bid Form, page 16. Failure to do so may result in your proposal being deemed non-responsive.
Thank you.
Brittany Bryant Purchasing Associate II
Brittany Bryant
Last Name First Name Ordered Organization City State/Province Email
Cleary Darren 1 Cleary Construction Inc Tompkinsville KY estimating@clearyconst.com
Grice Adam 1 Mid-South Builder Inc Lithonia GA adam@mid-southbuildersinc.com
Rosinski Greg 1 Reeves Young Sugar Hill GA grosinski@reevesyoung.com
Isbell Tamara 1 Site Engineering Atlanta GA tamara@siteengineering.com
King Scott 1 The Dickerson Group Inc. LAWRENCEVILLE GA scott.king@dickersongroup.net
Montgomery Melissa 1 John D. Stephens, Inc. LAWRENCEVILLE GA mmontgomery@johndstephens.com
PLANHOLDERS LIST
BL139-22
ADDENDUM NO. 1 ATTACHMENT
DECEMBER 8, 2022
Other files
| File | Type | Posted |
|---|---|---|
| Award Information | — | |
| BL139-22 Notice | — |
On GovTribe
Work with this file