Award Information

206 KB Posted

Attached to
Buford Highway Cast Iron Pipe Replacement – Sec A
Solicitation number
BL139-22
Issued by
Gwinnett County, Georgia

About this file

This Bid Tabulation document from the Georgia Department of Water Resources presents award information for project BL139-22, the Buford Highway Cast Iron Pipe Replacement – Section A. The project encompasses water utility infrastructure replacement and related site restoration work, including installation of ductile iron pipe in various sizes (6-inch, 8-inch, 16-inch, and 24-inch), water utility distribution valves, and fire hydrant assemblies. Base bid items total approximately 30 line items covering materials and labor for pipe installation, pavement restoration, erosion control, traffic management, and environmental stabilization. A pre-bid conference was scheduled for December 1, 2022, at 10:00 A.M. in the parking lot of the Dollar General located at 2696 Old Peachtree Road, Duluth, Georgia 30097, near the intersection of Old Peachtree Road and Buford Highway. The project also includes 15 owner-directed supplemental work items that may be executed at the owner's discretion during construction.

Four vendors submitted competitive bids for the project: JDS, Inc., Mid-South Builders, Inc., The Dickerson Group, Inc., and Reeves Young, LLC. The Dickerson Group, Inc., was recommended as the apparent low bidder with an overall bid total of $2,564,646.47, comprising a base bid of $2,113,560.00 and owner-directed items totaling $342,035.00. The next lowest bids were submitted by Reeves Young, LLC at $2,745,850.00, JDS, Inc. at $2,564,580.00, and Mid-South Builders, Inc. at $3,629,925.00. The contract included specific unit pricing for materials such as asphaltic concrete, ductile iron pipe, and various restoration items, with significant costs allocated to traffic control services ($220,000 in base items) and the primary pipe installation work totaling $1,712,850.00 for the 16-inch ductile iron pipe alone.

Text of this file

BID TABULATION Page 1 of 1

BL139-22

Buford Highway Cast Iron Pipe Replacement – Section A

ITEM # DESCRIPTION UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT

PRICE TOTAL PRICE

1 Asphaltic Concrete 12.5mm Superpave, GP2 Only 350 TON $300.00 $105,000.00 $300.00 $105,000.00 $175.00 $61,250.00 $210.00 $73,500.00 2 Asphaltic Concrete 19mm Superpave 300 TON $280.00 $84,000.00 $250.00 $75,000.00 $150.00 $45,000.00 $177.00 $53,100.00 3 Graded Aggregate Base (GAB) 350 TON $30.00 $10,500.00 $60.00 $21,000.00 $48.50 $16,975.00 $50.00 $17,500.00 4 Driveway Cut Restoration 250 SY $155.00 $38,750.00 $80.00 $20,000.00 $80.00 $20,000.00 $85.00 $21,250.00 5 Curb/Combination Curb & Gutter 750 LF $130.00 $97,500.00 $50.00 $37,500.00 $30.00 $22,500.00 $29.00 $21,750.00 6 Sidewalk Restoration 500 SY $90.00 $45,000.00 $70.00 $35,000.00 $55.00 $27,500.00 $68.00 $34,000.00 7 Permanent Seeding (Ds3) 12,500 SY $1.00 $12,500.00 $0.60 $7,500.00 $0.50 $6,250.00 $0.75 $9,375.00 8 Sodding 6,250 SY $1.00 $6,250.00 $15.00 $93,750.00 $10.00 $62,500.00 $18.00 $112,500.00 9 Traffic Control - Devices 1 LS $40,000.00 $40,000.00 $100,000.00 $100,000.00 $102,600.00 $102,600.00 $20,000.00 $20,000.00

10 Traffic Control – Police Officer 2,000 HR $55.00 $110,000.00 $55.00 $110,000.00 $55.00 $110,000.00 $55.00 $110,000.00 11 Erosion and Sediment Controls - Hay Bales (Sd1) 250 EA $20.00 $5,000.00 $15.00 $3,750.00 $16.00 $4,000.00 $12.00 $3,000.00 12 Erosion and Sediment Controls – Temp Silt Fence C (Sd1-S) 5,500 LF $4.00 $22,000.00 $6.00 $33,000.00 $2.95 $16,225.00 $4.50 $24,750.00 13 Erosion and Sediment Controls – Sediment Trap (Sd2-P) 20 EA $250.00 $5,000.00 $500.00 $10,000.00 $170.00 $3,400.00 $150.00 $3,000.00 14 Erosion and Sediment Controls – Sediment Fence (Sd2-F) 110 LF $250.00 $27,500.00 $5.00 $550.00 $17.00 $1,870.00 $20.00 $2,200.00 15 Erosion and Sediment Controls – Slope Stabilization (Ss) 2,000 SY $2.00 $4,000.00 $5.50 $11,000.00 $1.44 $2,880.00 $5.00 $10,000.00 16 Erosion and Sediment Controls– Stone Check Dam (Cd-S) 5 EA $1,750.00 $8,750.00 $500.00 $2,500.00 $570.00 $2,850.00 $280.00 $1,400.00 17 Erosion and Sediment Controls – RipRap (St) 150 SY $55.00 $8,250.00 $50.00 $7,500.00 $55.00 $8,250.00 $70.00 $10,500.00 18 Erosion and Sediment Controls – Mulch (Ds1) 350 TON $1.00 $350.00 $0.01 $3.50 $5.00 $1,750.00 $1.00 $350.00 19 Erosion and Sediment Controls – Temp Seeding (Ds2) 12,500 SY $0.75 $9,375.00 $0.05 $625.00 $0.30 $3,750.00 $0.25 $3,125.00 20 Erosion and Sediment Controls – Streambank Stabilization (Sb) 1 LS $25,000.00 $25,000.00 $5,000.00 $5,000.00 $24,750.00 $24,750.00 $12,500.00 $12,500.00 21 Site Restoration and Cleanup 1 LS $2,500.00 $2,500.00 $2,671.50 $2,671.50 $53,210.00 $53,210.00 $89,000.00 $89,000.00 22 Project Record Drawings 1 LS $2,500.00 $2,500.00 $1,500.00 $1,500.00 $3,000.00 $3,000.00 $15,000.00 $15,000.00 23 Ductile Iron Pipe (Water), 8-Inch 100 LF $200.00 $20,000.00 $420.00 $42,000.00 $132.00 $13,200.00 $157.00 $15,700.00 24 Ductile Iron Pipe (Water), 16-Inch 4,750 LF $360.60 $1,712,850.00 $520.00 $2,470,000.00 $348.00 $1,653,000.00 $200.00 $950,000.00 25 Ductile Iron Pipe (Water), 24-Inch 5 LF $441.00 $2,205.00 $900.00 $4,500.00 $740.00 $3,700.00 $855.00 $4,275.00 26 Water Utility Distribution Valves, 8-Inch Gate Valves 5 EA $2,500.00 $12,500.00 $2,700.00 $13,500.00 $2,440.00 $12,200.00 $3,000.00 $15,000.00 27 Water Utility Distribution Valves, 16-Inch Butterfly Valves 5 EA $7,500.00 $37,500.00 $3,100.00 $15,500.00 $6,400.00 $32,000.00 $7,500.00 $37,500.00 28 Water Utility Distribution Fire Hydrant Assemblies 11 EA $8,300.00 $91,300.00 $5,900.00 $64,900.00 $9,500.00 $104,500.00 $8,250.00 $90,750.00 29 Salvage Existing Fire Hydrants 5 EA $1,000.00 $5,000.00 $150.00 $750.00 $1,025.00 $5,125.00 $300.00 $1,500.00 30 Orange Barrier Fence 4,500 LF $3.00 $13,500.00 $4.00 $18,000.00 $1.50 $6,750.00 $2.00 $9,000.00

SUP 1 Owner Directed Work - Cast-in-Place Concrete – Class A 75 CY $0.01 $0.75 $350.00 $26,250.00 $500.00 $37,500.00 $350.00 $26,250.00 SUP 2 Owner Directed Work - Additional Earth Excavation 700 CY $0.01 $7.00 $25.00 $17,500.00 $30.00 $21,000.00 $30.00 $21,000.00 SUP 3 Owner Directed Work - Additional Rock Excavation 200 CY $0.01 $2.00 $225.00 $45,000.00 $98.00 $19,600.00 $95.00 $19,000.00 SUP 4 Owner Directed Work - Crusher Run Backfill 35 TON $0.01 $0.35 $65.00 $2,275.00 $49.00 $1,715.00 $50.00 $1,750.00 SUP 5 Additional Utility Pipe Bedding 35 TON $0.01 $0.35 $60.00 $2,100.00 $50.00 $1,750.00 $61.00 $2,135.00 SUP 6 Owner Directed Work - Additional DIP Fittings by the Pound 5,000 LBS $0.01 $50.00 $4.50 $22,500.00 $1.00 $5,000.00 $5.00 $25,000.00 SUP 7 Owner Directed Work - Additional 16" Restraining Gaskets 25 EA $0.01 $0.25 $420.00 $10,500.00 $550.00 $13,750.00 $650.00 $16,250.00

SUP 8 Owner Directed Work - Fill Abandoned Water Mains with Flowable Fill 350 CY $0.01 $3.50 $300.00 $105,000.00 $309.00 $108,150.00 $350.00 $122,500.00

SUP 9 Owner Directed Work – Ductile Iron Pipe (Water), 6-Inch 100 LF $0.01 $1.00 $225.00 $22,500.00 $64.00 $6,400.00 $150.00 $15,000.00

SUP 10 Owner Directed Work – Additional ¾” Short Side Water Services 3 EA $0.01 $0.03 $1,500.00 $4,500.00 $2,570.00 $7,710.00 $1,250.00 $3,750.00

SUP 11 Owner Directed Work – Additional ¾” Long Side Water Services 1 EA $0.01 $0.01 $2,500.00 $2,500.00 $5,100.00 $5,100.00 $2,500.00 $2,500.00

SUP 12 Owner Directed Work – Water Utility Distribution Valves, 6-Inch Gate Valves 3 EA $0.01 $0.03 $1,600.00 $4,800.00 $1,380.00 $4,140.00 $3,000.00 $9,000.00

SUP 13 Owner Directed Work – Additional Traffic Control per MUTCD Typical Application 10 30 DAYS $0.01 $0.30 $250.00 $7,500.00 $510.00 $15,300.00 $1,200.00 $36,000.00

SUP 14 Owner Directed Work – Tree Replacement 40 EA $0.01 $0.40 $500.00 $20,000.00 $500.00 $20,000.00 $610.00 $24,400.00 SUP 15 Owner Directed Work – Exploratory Excavations 50 EA $0.01 $0.50 $500.00 $25,000.00 $955.00 $47,750.00 $350.00 $17,500.00

Recommended Vendor:

The Dickerson Group, Inc.

Attn: Jason Freeland 871 Old Peachtree Road NW Lawrenceville, GA 30043 Phone: 770-513-4558 Jason.Freeland@Dickersongroup.net

Department of Water Resources

PART 1 - BASE BID ITEMS

PART 2 - OWNER DIRECTED ITEMS

PART 2 - TOTAL

PART 1 - TOTAL

$2,113,560.00

JDS, Inc.

(L)

APPROX.

QTY.

$2,564,580.00

$66.47

Mid-South Builders, Inc.

(OC)

$3,312,000.00

$342,035.00

The Dickerson Group, Inc.

(L)

$1,771,525.00

Reeves Young, LLC (L)

$2,430,985.00

$314,865.00 $2,745,850.00

$317,925.00

$3,629,925.00OVERALL BID TOTAL $2,564,646.47

km mailto:Jason.Freeland@Dickersongroup.net

BL139-22 Award Notice.pdf
BL139-22 Tab.pdf
Sheet1

Other files

File Type Posted
BL139-22 Notice —
BL139-22 ADD1 —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .