Bridge Deck Overlay and Bridge Painting - I-72 over TR 92 (250th Street), NS Railroad, Hadley Creek and TR 149 (315th Street), 1. 8 miles west of CH 4 at the Barry interchange.
Closed State & local contract opportunity Posted
- Solicitation number
- 72601
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- IDOT Contracts Office dot.de-contracts@illinois.gov (217) 782-7806
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Illinois Department of Transportation is requesting bids for bridge deck overlay, bridge painting, and related roadway work on I-72 at four structures (250th Street, Norfolk Southern Railway, Hadley Creek, and 315th Avenue) approximately 1.8 miles west of the Barry interchange in Pope County, with bids due June 12, 2026 at 12:00 p.m. via the iCX-Integrated Contractors Exchange system. This project utilizes Federal-aid funds and will be awarded to the lowest responsive and responsible bidder.
The scope includes replacement of expansion joints and finger joint plates, bridge deck scarification and microsilica concrete overlay, diamond grinding, and bridge painting on structures SN 075-0098 and 075-0099. Girder 5 requires strengthening at the west abutment and pier 4 on the westbound structure. Roadway work encompasses HMA overlay, replacement of bridge approach shoulder pavement at the west abutment, shoulder inlet and pipe drain replacements, concrete curb and guardrail replacement, and pavement markings reinstallation. The project also requires removal and disposal of the existing Roadway Weather Information System and complete replacement at a new location within project limits, including concrete pad, chain link fence, conduit, and associated work.
All work except bridge cleaning and painting must be completed by November 30, 2027. Bridge cleaning and painting operations are allowed an additional 100 working days, with a specific 25 consecutive working day requirement for Norfolk Southern Railway span work. The contractor must meet SSPC-QP1 certification minimum (SSPC-QP2 for lead abatement work) and employ quality control personnel with NACE Coating Inspector Level 2 certification. Environmental compliance for hazardous waste management, lead-containing paint residues, and chloride remediation at IEPA-permitted facilities is mandatory. Traffic control must comply with I-72 freeway standards, including lane closure and advance notification requirements to the District 6 Bureau of Operations.
Opportunity text
The proposed improvement consists of: SN 075-0098 & 0099: Replacement of expansion joints, finger joint plate adjustment, bridge deck scarification and microsilica concrete overlay, diamond grinding, and bridge painting. Girder 5 is also to be strengthened at west abutment and pier 4 on SN 075-0099 (WB). Roadway Work: HMA overlay, replacement of bridge approach shoulder pavement at the west abutment, shoulder inlet and pipe drain replacements, concrete curb, guardrail replacement, and reinstalling pavement markings. Roadway Weather Information System (RWIS): Removal and disposal of the existing RWIS and the complete replacement of the roadway weather information system at a different location within the project limits. Work items include a concrete pad, chain link fence, conduit, and other associated work items. Location: The project is located over 250th Street, Norfolk Southern Railway, Hadley Creek & 315th Ave, 1.8 miles west of CH 4 at Barry Interchange.