This is a Notice to Bidders and contract specification document issued by the Illinois Department of Transportation (IDOT) for Contract No. 72601, a bridge deck overlay and bridge painting project located on I-72 (FAI Route 72) in Pike County, Illinois. The project involves two bridge structures (SN 075-0098 and 075-0099) carrying I-72 over 250th Street, Norfolk Southern Railway, Hadley Creek, and 315th Avenue, approximately 1.8 miles west of the Barry interchange. The proposed work consists of replacement of expansion joints, finger joint plate adjustment, bridge deck scarification and microsilica concrete overlay, diamond grinding, and bridge painting on both structures. Additional work includes strengthening of Girder 5 at the west abutment and pier 4 on the westbound structure, HMA overlay, replacement of bridge approach shoulder pavement, shoulder inlet and pipe drain replacements, concrete curb and guardrail replacement, pavement markings reinstallation, and complete removal and replacement of the Roadway Weather Information System (RWIS) at a new location within project limits. Electronic bids must be submitted to the iCX-Integrated Contractors Exchange system no later than 12:00 p.m. on June 12, 2026, at which time bids will be publicly opened. All work except bridge cleaning and painting operations must be completed on or before November 30, 2027, with an additional 100 working days allowed for bridge cleaning and painting, including a specific 25 consecutive working day requirement for Span 6 (Norfolk Southern Railway) work.

The contract will be awarded to the lowest responsive and responsible bidder in accordance with applicable federal and state regulations, as this project utilizes Federal-aid funds. The specification documents include supplemental specifications, recurring special provisions, and special provisions addressing traffic control, utility coordination, width restriction signing, structural steel repair, guardrail removal, bridge approach shoulder pavement construction, HMA anti-strip additive requirements, electrical service installation, RWIS removal and replacement, and comprehensive cleaning and painting requirements for existing steel structures. Construction activities are subject to specific traffic control standards for I-72 as a multi-lane freeway, with requirements for lane closures, temporary concrete barriers, and advance notification to the District 6 Bureau of Operations. The contractor must comply with extensive environmental requirements for hazardous waste management, including handling of lead-containing paint residues, chloride remediation, and proper disposal at IEPA-permitted facilities. Quality control inspections are mandatory throughout all phases of work, with specific requirements for contractor qualifications (SSPC-QP1 certification minimum, SSPC-QP2 for lead abatement), quality control personnel with NACE Coating Inspector Level 2 certification, and comprehensive documentation and testing procedures.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Letting June 12, 2026

Notice to Bidders, Specifications and Proposal

Contract No. 72601 PIKE County Section (75-3VHB-1)BDR,BP,BJR Route FAI 72 Project BR-6KSJ(582) District 6 Construction Funds

Prepared by F

Checked by

(Printed by authority of the State of Illinois)

NOTICE TO BIDDERS

1. TIME AND PLACE OF OPENING BIDS. Electronic bids are to be submitted to the electronic bidding system (iCX-Integrated Contractors Exchange). All bids must be submitted to the iCX system prior to 12:00 p.m.

June 12, 2026 at which time the bids will be publicly opened from the iCX SecureVault.

2. DESCRIPTION OF WORK. The proposed improvement is identified and advertised for bids in the

Invitation for Bids as:

Contract No. 72601 PIKE County Section (75-3VHB-1)BDR,BP,BJR Project BR-6KSJ(582) Route FAI 72 District 6 Construction Funds

Bridge deck overlay and bridge painting on SN 075-0098 and 075-0099 carrying I-72 over TR 92 (250th Street), NS Railroad, Hadley Creek and TR 149 (315th Street), 1.8 miles west of CH 4 at the Barry interchange.

3. INSTRUCTIONS TO BIDDERS. (a) This Notice, the invitation for bids, proposal and letter of award shall, together with all other documents in accordance with Article 101.09 of the Standard Specifications for Road and Bridge Construction, become part of the contract. Bidders are cautioned to read and examine carefully all documents, to make all required inspections, and to inquire or seek explanation of the same prior to submission of a bid.

(b) State law, and, if the work is to be paid wholly or in part with Federal-aid funds, Federal law requires the bidder to make various certifications as a part of the proposal and contract. By execution and submission of the proposal, the bidder makes the certification contained therein. A false or fraudulent certification shall, in addition to all other remedies provided by law, be a breach of contract and may result in termination of the contract.

4. AWARD CRITERIA AND REJECTION OF BIDS. This contract will be awarded to the lowest responsive and responsible bidder considering conformity with the terms and conditions established by the Department in the rules, Invitation for Bids and contract documents. The issuance of plans and proposal forms for bidding based upon a prequalification rating shall not be the sole determinant of responsibility. The Department reserves the right to determine responsibility at the time of award, to reject any or all proposals, to re-advertise the proposed improvement, and to waive technicalities.

By Order of the Illinois Department of Transportation

Gia Biagi, Secretary

FAI ROUTE 72 (I-72)

PROJECT BR-6KSJ(582)

SECTION (75-3VHB-1)BDR,BP,BJR

PIKE COUNTY

CONTRACT NO. 72601

INDEX

FOR

SUPPLEMENTAL SPECIFICATIONS

AND RECURRING SPECIAL PROVISIONS

Adopted January 1, 2026

This index contains a listing of SUPPLEMENTAL SPECIFICATIONS, frequently used RECURRING SPECIAL PROVISIONS, and LOCAL ROADS AND STREETS RECURRING SPECIAL PROVISIONS.

ERRATA Standard Specifications for Road and Bridge Construction (Adopted 1-1-22) (Revised 1-1-26)

SUPPLEMENTAL SPECIFICATIONS

Std. Spec. Sec. Page No.

109 Measurement and Payment 202 Earth and Rock Excavation 204 Borrow and Furnished Excavation 207 Porous Granular Embankment 211 Topsoil and Compost 214 Grading and Shaping Ditches 406 Hot-Mix Asphalt Binder and Surface Course 407 Hot-Mix Asphalt Pavement (Full-Depth) 420 Portland Cement Concrete Pavement 502 Excavation for Structures 504 Precast Concrete Structures 509 Metal Railings 522 Retaining Walls 540 Box Culverts 542 Pipe Culverts 550 Storm Sewers 586 Granular Backfill for Structures 601 Pipe Drains, Pipe Underdrains, and French Drains 630 Steel Plate Beam Guardrail 632 Guardrail and Cable Road Guard Removal 644 High Tension Cable Median Barrier 665 Woven Wire Fence 701 Work Zone Traffic Control and Protection 781 Raised Reflective Pavement Markers 782 Reflectors 801 Electrical Requirements 821 Roadway Luminaires

1003 Fine Aggregates 1004 Coarse Aggregates 1010 Finely Divided Minerals 1020 Portland Cement Concrete ……… 1030 Hot-Mix Asphalt 1040 Drain Pipe, Tile, and Wall Drain 1042 Precast Concrete Products 1061 Waterproofing Membrane System 1067 Luminaire ……… 1097 Reflectors 1102 Hot-Mix Asphalt Equipment

SECTION (75-3VHB-1)BDR,BP,BJR

RECURRING SPECIAL PROVISIONS

The following RECURRING SPECIAL PROVISIONS indicated by an “X” are applicable to this contract and are included by reference:

CHECK SHEET # PAGE NO.

1 X Additional State Requirements for Federal-Aid Construction Contracts 2 X Subletting of Contracts (Federal-Aid Contracts)

3 X EEO

4 Specific EEO Responsibilities Nonfederal-Aid Contracts 5 Required Provisions - State Contracts 6 Asbestos Bearing Pad Removal 7 Asbestos Waterproofing Membrane and Asbestos Hot-Mix Asphalt Surface Removal 8 Temporary Stream Crossings and In-Stream Work Pads 9 Construction Layout Stakes

10 Use of Geotextile Fabric for Railroad Crossing 11 Subsealing of Concrete Pavements 12 Hot-Mix Asphalt Surface Correction 13 X Pavement and Shoulder Resurfacing 14 Patching with Hot-Mix Asphalt Overlay Removal 15 X Polymer Concrete 16 Reserved 17 Bicycle Racks 18 Temporary Portable Bridge Traffic Signals 19 Nighttime Inspection of Roadway Lighting 20 English Substitution of Metric Bolts 21 Calcium Chloride Accelerator for Portland Cement Concrete 22 X Quality Control of Concrete Mixtures at the Plant 23 X Quality Control/Quality Assurance of Concrete Mixtures 24 Reserved 25 Reserved 26 Temporary Raised Pavement Markers 27 Restoring Bridge Approach Pavements Using High-Density Foam 28 Portland Cement Concrete Inlay or Overlay 29 Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 30 Longitudinal Joint and Crack Patching 31 Concrete Mix Design – Department Provided 32 Station Numbers in Pavements or Overlays

SECTION (75-3VHB-1)BDR,BP,BJR

i

TABLE OF CONTENTS

LOCATION OF PROJECT

DESCRIPTION OF PROJECT

TRAFFIC CONTROL PLAN

STATUS OF UTILITIES TO BE ADJUSTED

UNDERGROUND FACILITIES – DEPARTMENT OWNED

WIDTH RESTRICTION SIGNING

COMPLETION DATE PLUS WORKING DAYS

BRIDGE APPROACH SHOULDER REMOVAL

P.C. CONCRETE BRIDGE APPROACH SHOULDER PAVEMENT (SPECIAL)

HMA ANTI-STRIP ADDITIVE REQUIREMENTS

STRUCTURAL STEEL REPAIR

PIPE DRAIN REMOVAL

GUARDRAIL REMOVAL (SPECIAL)

FILLING INLETS, TEMPORARY

REMOVE EXISTING WEATHER STATION

BOLLARDS

ELECTRIC SERVICE INSTALLATION (SPECIAL)

CONCRETE PAD

REMOVAL OF CONDUIT ATTACHED TO STRUCTURE

CLEANING AND PAINTING CONTACT SURFACE AREAS OF EXISTING STEEL STRUCTURES

CLEANING AND PAINTING EXISTING STEEL STRUCTURES

DIAMOND GRINDING AND SURFACE TESTING BRIDGE SECTIONS

CONTAINMENT AND DISPOSAL OF NON-LEAD PAINT CLEANING RESIDUES

BRIDGE DECK GROOVING (LONGITUDINAL)

BAR SPLICERS, HEADED REINFORCEMENT

AUTOMATED FLAGGER ASSISTANCE DEVICES (BDE)

BRIDGE DECK CONCRETE OVERLAYS

CEMENT, FINELY DIVIDED MINERALS, ADMIXTURES, CONCRETE, AND MORTAR (BDE)

COMPENSABLE DELAY COSTS (BDE)

GUARDRAIL (BDE)

HOT-MIX ASPHALT (BDE)

PAVEMENT MARKING (BDE)

PERFORMANCE GRADED ASPHALT BINDER (BDE)

RAILROAD PROTECTIVE LIABILITY INSURANCE (BDE)

SECTION (75-3VHB-1)BDR,BP,BJR

ii

RIGHT OF ENTRY TO RAILWAY PROPERTY, DOT/AAR NO. 480386X, MP DH-498.12, CONTRACT

72601

REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES (BDE)

SEEDING (BDE)

SHORT TERM AND TEMPORARY PAVEMENT MARKINGS (BDE)

SIGN PANELS AND APPURTENANCES (BDE)

SOURCE OF SUPPLY AND QUALITY REQUIREMENTS (BDE)

SPEED DISPLAY TRAILER (BDE)

STEEL COST ADJUSTMENT (BDE)

SUBCONTRACTOR AND DBE PAYMENT REPORTING (BDE)

SUBCONTRACTOR MOBILIZATION PAYMENTS (BDE)

SUBMISSION OF BIDDERS LIST INFORMATION (BDE)

SUBMISSION OF PAYROLL RECORDS – FEDERAL AID CONTRACT (BDE)

SURVEYING SERVICES (BDE)

TEMPORARY CONCRETE BARRIER (BDE)

TRAINING SPECIAL PROVISIONS (BDE)

IDOT TRAINING PROGRAM GRADUATE ON-THE-JOB TRAINING SPECIAL PROVISION

VEHICLE AND EQUIPMENT WARNING LIGHTS (BDE)

WORK ZONE TRAFFIC CONTROL DEVICES (BDE)

PROJECT LABOR AGREEMENT

SECTION (75-3VHB-1)BDR,BP,BJR

STATE OF ILLINOIS

SPECIAL PROVISIONS

The following Special Provisions supplement the "Standard Specifications for Road and Bridge Construction, Adopted January 1, 2022", the latest edition of the "Manual on Uniform Traffic Control Devices for Streets and Highways", and the "Manual of Test Procedures for Materials" in effect on the date of invitation for bids, and the "Supplemental Specifications and Recurring Special Provisions" indicated on the Check Sheet included herein, which apply to and govern the construction of FAI Route 72 (I-72), Project BR-6KSJ(582), Section (75-3VHB-1)BDR,BP,BJR, Pike County, Contract No. 72601, and in case of conflict with any part, or parts, of said Specifications, the said Special Provisions shall take precedence and shall govern.

FAI Route 72 (I-72) Project BR-6KSJ(582)

Section (75-3VHB-1)BDR,BP,BJR Pike County

Contract No. 72601

LOCATION OF PROJECT

The project is located over 250th Street, Norfolk Southern Railway, Hadley Creek & 315th Ave, 1.8 miles west of CH 4 at Barry Interchange.

DESCRIPTION OF PROJECT

The proposed improvement consists of:

SN 075-0098 & 0099: Replacement of expansion joints, finger joint plate adjustment, bridge deck scarification and microsilica concrete overlay, diamond grinding, and bridge painting. Girder 5 is also to be strengthened at west abutment and pier 4 on SN 075-0099 (WB).

Roadway Work: HMA overlay, replacement of bridge approach shoulder pavement at the west abutment, shoulder inlet and pipe drain replacements, concrete curb, guardrail replacement, and reinstalling pavement markings.

Roadway Weather Information System (RWIS): Removal and disposal of the existing RWIS and the complete replacement of the roadway weather information system at a different location within the project limits. Work items include a concrete pad, chain link fence, conduit, and other associated work items.

SECTION (75-3VHB-1)BDR,BP,BJR

TRAFFIC CONTROL PLAN

Effective: November 1, 1984 Revised: October 10, 2022

The following traffic control and protection will apply to this project:

Highway Standards:

701001 This standard will be used on 2 lane / 2 way traffic for all work activities greater than 15 ft. from the edge of pavement.

701006 This standard will be used on 2 lane / 2 way traffic for all work activities within 24 inches to 15 ft. from the edge of pavement.

701101 This standard will be used on multi-lane highways for all work activities within 24 inches and 15 ft. from the edge of pavement.

701106 This standard will be used on multi-lane highways for all work activities greater than 15 ft. from the edge of pavement.

701201 This standard will be used on 2 lane / 2 way traffic for hydroscarifying and bridge painting activities on I-72 over 250th Street and 315th Avenue.

701400 This standard will be used any time a lane is closed on a freeway or expressway.

701401 This standard is used where at any time any vehicle, equipment, workers, or their activities will encroach on the lane adjacent to the shoulder or on the shoulder within 24” of the edge of pavement. This standard is applicable for construction activities such as bridge approach shoulder replacement and shall be used in conjunction with Standard 701400.

701402 This standard will be used any time a lane closure is required on a freeway or expressway due to work encroaching on a travel lane adjacent to the shoulder or on the shoulder within 24” of the edge of pavement and where temporary concrete barrier wall is utilized. This standard is applicable for construction activities such as I-72 mainline bridge-related work at the locations specified in the plans and shall be used in conjunction with Standard 701400.

701426 This standard will be used any time a lane closure is required on a freeway or expressway when any vehicle, equipment, workers, or their activities require stationary operations less than one hour or moving operations where the average speed is greater than 1 mph. This standard is applicable for construction activities such as pavement marking operations.

701901 This standard describes all permissible traffic control devices that can be utilized with the above-mentioned traffic control standards.

Limitations Of Construction: The Contractor shall coordinate the items of work to keep hazards and traffic inconveniences to a minimum, as specified below.

SECTION (75-3VHB-1)BDR,BP,BJR

1. The Contractor shall contact the District 6 Bureau of Operations, (217) 785-5306, at least

72 hours in advance of beginning work and three weeks prior to implementing any traffic control.

2. The Contractor shall erect two changeable message signs (one per direction of travel) seven days in advance of implementing Standard 701401. The exact location of changeable message signs will be confirmed by the Engineer.

3. All traffic control signs shall be new and meet current reflectivity standards. Remaining traffic control devices shall be new, or like new, equipped with new reflective sheeting at the time of use. The Engineer will be the sole judge of the condition of the devices.

4. In advance of each lane closure, the Contractor shall provide four “BE PREPARED TO STOP” (W3-4(O)48) signs. These signs shall be tripod mounted and placed at locations as designated by the Engineer, to provide adequate warning in advance of traffic back-ups. The signs will not be paid for separately but considered included in the contract unit bid prices for the traffic control and protection pay items.

5. Where construction operations require the construction of a temporary ramp, a "BUMP" sign(s) (W8-1(O)48) shall be used. The Contractor shall place the signs adjacent to the temporary ramp or as directed by the Engineer. The signs shall remain in place until the temporary ramp is eliminated. The signs will not be paid for separately but considered included in the contract unit bid prices for the traffic control and protection pay items.

6. During construction, at least one lane of I-72 (per direction of travel) shall remain open to traffic at all times.

7. The Contractor shall provide two flaggers to stop traffic on 250th Street and 315th Avenue when hydroscarification operations are ongoing on I-72 above. A flagger shall be placed on 250th Street and 315th Avenue on either side of the overhead structures (SN 075-0098 & 0099). The flaggers shall keep watch for any breakthroughs in the deck overhead. If a breakthrough occurs, the debris shall be removed prior to allowing traffic to proceed.

8. During I-72 bridge painting operations, the Contractor shall be required to maintain a 25’- 0” (wide) x 16’-0” (height) unobstructed window to allow for the safe passage of vehicles below on 250th Street and 315th Avenue.

9. Temporary concrete barrier will not be allowed on mainline I-72 between December 1st to February 28th of a given calendar year without prior approval from the Engineer.

STATUS OF UTILITIES TO BE ADJUSTED

Reviewed: April 14, 2020

The following utilities are involved in this project. The utility companies have provided the estimated dates.

Name & Address of Utility Type Location Estimated Date of Relocation Completed

None Anticipated

The above represents the best information of the Department and is only included for the convenience of the bidder. The applicable provisions of Articles 105.07, 107.20, 107.37, 107.38, 107.39, 107.40, and 108.02 of the Standard Specifications shall apply.

SECTION (75-3VHB-1)BDR,BP,BJR

The estimated utility relocation dates should be part of the progress schedule submitted by the Contractor. If any utility adjustments or relocations have not been completed by the above dates specified and when required by the Contractor's operations after these dates, the Contractor should notify the Engineer in writing. A request for an extension of time will be considered to the extent the Contractor's critical path schedule is affected.

UNDERGROUND FACILITIES – DEPARTMENT OWNED

Effective: February 1, 1996 Reviewed: September 20, 2024

The Contractor’s attention is directed to the presence of state-owned underground utilities within the limits of the proposed improvement. The Contractor shall notify the Illinois Department of Transportation, Bureau of Traffic Operations, a minimum of 72 hours in advance of work being done in the area at (217) 622-0608 to locate department owned underground facilities. The Illinois Department of Transportation is not a member of the Joint Utility Locating Information for Excavators (JULIE) system.

Any damage to the underground facilities, caused by the Contractor resulting from their failure to contact the Illinois Department of Transportation as specified above or from negligent operation, shall be repaired to the satisfaction of the Department at the Contractor’s expense, including temporary repairs which may be required to keep the facility operational while material is being obtained to make permanent repairs. Splicing of electric and fiber optic cables will not be allowed.

Electric cables shall be replaced from pole to pole or controller.

WIDTH RESTRICTION SIGNING

Effective: December 7, 1999 Revised: January 31, 2024

Description. This work shall consist of furnishing, erecting, maintaining, covering, uncovering, and removing maximum width signage as shown in the plans.

Construction Requirements. The work within this contract will cause a width restriction requiring notification of a minimum of 21 days prior to the actual width restriction and/or event requiring “Maximum Width” s. signage “Maximum Width” signage shall be furnished, erected, maintained, and removed by the Contractor for placement at the locations shown within the contract plans.

Width restrictions shall be interpreted as any change in the existing horizontal clearance caused by the placement of physical barrier(s) that extend above the pavement surface. Construction activities which close a lane with operating equipment, or with drums, barricades, or cones, will not be considered as width restrictions. Equipment, such as paving machines, or channelizing devices can and shall be temporarily moved aside if a wide load arrives.

Notification of width restriction requires a minimum of 21 days before the actual restriction is placed to ensure specific routed over-width permitted loads are not sent through the restriction site. The Contractor shall notify the Engineer a minimum of 21 days prior to the width restriction.

In the notification, the Contractor shall include the location, scheduled restriction start date, road restriction width(s)/closure (i.e. barrier to barrier width), proposed posted width (i.e. barrier to

SECTION (75-3VHB-1)BDR,BP,BJR

barrier width minus 18 inches). The Engineer shall notify the D6 Bureau of Operations (217-785- 5306) with the 21-day notice.

The Contractor is advised they will not be allowed to install the width restriction without the 21-day notice, and failure to provide proper notice will delay the installation of the width restriction.

The notice of width restriction is considered a part of the Contractor’s approved work schedule and is the Contractor’s responsibility to provide proper notice. Delays caused by failure to provide notice shall not be considered justification for workday reductions or completion date extensions.

Basis of Payment. This work will be paid for at the contract unit price per LUMP SUM for WIDTH

RESTRICTION SIGNING.

COMPLETION DATE PLUS WORKING DAYS

The Contractor shall complete the items listed below on or before November 30, 2027.

• Bridge deck microsilica concrete overlays

• Bridge joint repairs and replacements

• HMA resurfacing

• Installing guardrail

• Installing pavement marking

• Removing and replacing the weather station

• All other work necessary to complete the project according to the plans and specifications.

Upon completion of all contract work specified above, the Contractor will be allowed an additional 100 working days to complete bridge cleaning and painting operations. Within this 100 working day work period, the Contractor shall complete cleaning and painting operations for Span 6 (Norfolk Southern Railway), on both the eastbound and westbound structures within 25 consecutive working days. The 25 working day period will begin on the first working day that cleaning or painting operations commence, as determined by the Engineer. The 25 working day period shall run consecutively, excluding any days authorized by the Engineer.

Failure to complete all contract work, except bridge cleaning and painting, on or before November 30, 2027, will result in the assessment of calendar day liquidated damages according to Article

108.09 of the Standard Specifications.

Failure to complete the bridge cleaning and painting within the additional 100 working days or failure to complete cleaning and painting for Span 6 within the specified 25 consecutive working days will result in the assessment of working day liquidated damages according to Article 108.09 of the Standard Specifications.

SECTION (75-3VHB-1)BDR,BP,BJR

BRIDGE APPROACH SHOULDER REMOVAL

Description. This work shall consist of the complete removal and disposal of existing PCC bridge approach shoulders at the locations specified and as shown on plan details.

Equipment. Equipment shall meet the approval of the Engineer.

Construction Requirements. PCC bridge approach shoulder removal shall be performed in accordance with applicable portions of Section 440 of the Standard Specifications and as modified herein.

All existing PCC bridge approach shoulder pavement including subbase materials which interfere with new construction work shall be completely removed as shown on plan details or as directed by the Engineer.

Excavations necessary for the construction of the proposed bridge approach slab shall be completed when the existing bridge approach slab has been removed. The existing subbase (excavation) shall be removed to the lines and grades as shown on plan details or as directed by the Engineer.

Existing shoulder drainage inlets (when present) shall be saved and incorporated into the new construction. The Contractor shall exercise care when removing concrete adjacent to the inlets so that the existing concrete inlets incur no damage. If the concrete inlets and/or grates are damaged due to the Contractors removal operations, the concrete inlets, frame, and grates shall be completely removed and replaced at the Contactors expense. If the Engineer determines that the existing concrete inlets, frames and grates are not sufficient for reuse, the concrete inlets, frame and grates shall be completely removed and replaced at the Department’s expense and shall be paid for according to Article 109.04 of the Standard specifications., Disposal of Materials. Materials resulting from the removal of existing PCC bridge approach slabs shall be disposed of according to Article 202.03 of the Standard Specifications.

Method of Measurement. Method of measurement shall be as follows.

Contract Quantities. The requirement for use of contract quantities shall be according to article 202.07(a) of the Standard specifications.

Measured Quantities. Measured quantities shall be according to Article 440.07 of the Standard specifications and as modified herein.

PCC bridge approach shoulder removal will be measured for payment in place, and the area computed in square yards.

Basis of Payment. This work will be paid for at the contract unit price per SQUARE YARD for BRIDGE APPROACH SHOULDER REMOVAL, which price shall be payment in full to complete this work.

SECTION (75-3VHB-1)BDR,BP,BJR

P.C. CONCRETE BRIDGE APPROACH SHOULDER PAVEMENT (SPECIAL)

Description. This item shall include all materials, labor, and equipment necessary to construct bridge approach shoulder pavement in accordance with applicable portions of Section 420 the Standard Specifications except as herein specified.

Construction Requirements. The Contractor shall perform the work of constructing bridge approach shoulder pavement using 10 inches of concrete as shown on plan details and as directed by the Engineer. Existing shoulder inlets, frames and grates shall be incorporated into the new construction.

Method of Measurement. This work will be measured for payment as follows.

Contract Quantities. The requirement for use of contract quantities shall be according to Article 202.07(a) of the Standard Specifications.

Measured Quantities. This work will be measured in place, and the area calculated in square yards.

Basis of Payment. This work will be paid for at the contract unit bid price per SQUARE YARD for P.C.

CONCRETE BRIDGE APPROACH SHOULDER PAVEMENT (SPECIAL), which price shall be payment in full to complete this work.

HMA ANTI-STRIP ADDITIVE REQUIREMENTS

HMA mixtures utilizing crushed gravel or sandstone coarse aggregate shall incorporate an anti-strip additive according to Article 1030.05(c). The additive shall be sufficient to achieve a TSR equal to 0.90 or greater for 6 inch specimens. If a liquid additive is used, the additive quantity shall be between 0.25% and 1.0% of the total weight of liquid asphalt. The mixture shall meet the minimum conditioned tensile strength requirements described in Article 1030.05(c).

The anti-strip additive product utilized for mix design verification shall be used for mixture production. A change in anti-strip additive product requires a reverification of the TSR and minimum conditioned tensile strength requirements prior to mixture production.

HMA mixtures having an ABR greater than 20% incorporating RAP/FRAP materials consisting of crushed gravel or sandstone coarse aggregate shall include an anti-strip additive. Where the RAP/FRAP materials requiring anti-strip were not included in the initial mix design verification, a new mix design is not required. However, a reverification of the TSR and minimum conditioned tensile strength requirements is required prior to mixture production.

This work will not be measured for payment. The cost of furnishing and introducing anti-stripping additives in the HMA shall be in included in the contract unit price of the HMA item involved.

SECTION (75-3VHB-1)BDR,BP,BJR

STRUCTURAL STEEL REPAIR

Description. This work shall consist of furnishing all labor, equipment, and materials necessary to furnish and install steel repair plates and assemblies according to Section 505 of the Standard Specifications and as indicated on the plans and in this special provision. This work shall include the furnishing of all materials including but not limited to steel angles and field fasteners for structural steel. All new structural steel shall be hot-dip galvanized in accordance with the special provision “Hot Dip Galvanizing for Structural Steel” and as indicated on the plans.

Basis of Payment. This work shall be paid for at the contract unit price per POUND for

STRUCTURAL STEEL REPAIR.

PIPE DRAIN REMOVAL

Description. This work consists of the removal of existing pipe drains at locations shown on the plans.

as directed by the Engineer, and in accordance with the applicable portions of Section 501 of the Standard Specifications. The pipe drains to be removed under this item generally conform to highway standard drawings for shoulder pavement or special details for bridge approach shoulder pavement and drain.

When a portion of the existing pipe drain shall be removed as part of removing inlets, the remaining portion of the pipe drain will not be abandoned but incorporated in final drainage systems as shown on the plans.

When the existing pipe drain shall be removed completely from the existing shoulder inlet to the end of the pipe drain, the existing thrust blocks and metal end sections shall also be removed.

Basis of Payment. This work will be paid for at the contract unit price per FOOT for PIPE DRAIN

REMOVAL.

GUARDRAIL REMOVAL (SPECIAL)

Revised: April 14, 2020

In addition to the requirements of Section 632 of the Standard Specifications, this work shall include the grouting of all previously drilled holes used to attach guardrail to a structure. This work will also include the removal of any concrete encasements of the posts and any additional railing located at the bottom of the posts.

Materials. Materials shall be according to the following:

Item Article/Section Grout and non-shrink grout……………………………………………………………..1024.01

SECTION (75-3VHB-1)BDR,BP,BJR

Method of Measurement. This work will be measured for payment according to Article 632.03 of the Standard Specifications. Grouting will not be paid for separately but shall be considered included in the cost of guardrail removal.

Basis of Payment. This work will be paid for at the contract unit price per FOOT for GUARDRAIL

REMOVAL (SPECIAL).

FILLING INLETS, TEMPORARY

Description: This work shall consist of temporarily filling shoulder inlets to accommodate traffic staging and, at the completion of work, restoring the drains to working order to the satisfaction of the Engineer.

Construction Requirements: Prior to routing traffic onto the shoulders, existing grates shall be removed and stored as directed by the Engineer. Outlet pipes shall be covered with plywood, and inlets shall be filled with CA-7. Inlets shall be filled to within 6” of the top of the inlet. The remaining 6” shall be capped with class SI concrete or compacted HMA at the Contractor’s option.

Prior to placing the cap, any exposed portions of the inlet box shall receive an application of release agent or be covered with plastic bond breaker.

While traffic is staged on filled inlets, the Contractor shall be responsible for maintaining the inlet and providing a smooth riding surface to the satisfaction of the Engineer. Any necessary repairs to the inlet or fill during staged construction and any traffic control necessary for completing the repairs shall be at the Contractor’s expense.

Once traffic is removed from the inlets, the inlet box shall be cleaned and the material disposed of according to Article 202.03 of the Standard Specifications before the grates are replaced.

Method of Measurement: This work shall be measured for payment per each inlet to be filled.

Basis of Payment: This work will be paid for at the contract unit price per EACH for FILLING INLETS, TEMPORARY. This price shall include all labor, materials, and equipment necessary to complete the work as specified.

REMOVE EXISTING WEATHER STATION

Description. This work shall consist of removing the existing weather station as shown in the plans and as directed by the Engineer.

Construction Requirements. Removal shall include the concrete pad and foundation, perimeter fencing, and salvaging existing weather station equipment.

The Contractor shall contact Central Bureau of Operations Maintenance Engineer 14 days prior to the removal of the existing weather to determine what components are to be salvaged. Those items to be removed shall be disposed of according to Article 202.03 of the Standard Specifications.

SECTION (75-3VHB-1)BDR,BP,BJR

The Contractor shall also contact Ameren to disconnect electrical power to the existing weather station 21 days prior to removal of the weather station.

After removal is complete, disturbed areas shall be backfilled and regraded to match the adjacent ground. Disturbed areas shall also be reseeded utilizing class 2 seeding, fertilizer spread, and mulch, method 2 placed according to Section 250 and 251 of Standard Specifications.

Basis of Payment. This work will be paid for at the contract unit price per LUMP SUM for

REMOVE EXISTING WEATHER STATION.

BOLLARDS

Description. This work shall consist of furnishing and installing timber bollards according to the details shown in the plans and as directed by the Engineer.

Materials. Bollards shall be nominal 6 x 6 in. treated timber according to Section 1007.09 of the Standard Specifications.

Preservative treatment shall be according to Section 1007.12 of the Standard Specifications.

Each bollard shall be 7 ft in length.

Construction Requirements. Bollards shall be installed plumb and aligned at locations shown in the plans or as directed by the Engineer.

• Embedment depth: 3 ft below finished grade.

• Exposed height: 4 ft above finished grade.

• Hole diameter: 12 in.

Backfill shall consist of compacted aggregate placed in lifts not exceeding 8".

The top of each bollard shall be beveled to shed water and treated with a field-applied wood preservative sealer compatible with the original treatment.

Method of Measurement. This work will be measured for payment as each bollard installed.

Basis of Payment. This work shall be paid at the contract unit price per EACH for BOLLARDS.

SECTION (75-3VHB-1)BDR,BP,BJR

ELECTRIC SERVICE INSTALLATION (SPECIAL)

Description. This work shall consist of furnishing and installing a new electrical service installation as shown on the plans and as specified herein. This work shall be performed according to Section 801 of the Standard Specifications, except as modified herein.

All service equipment installed under this contract shall be located outdoors. The work shall include, but not be limited to:

• Underground service entrance raceways

• Service conductors

• Meter/main combination equipment with integral service disconnect

• Grounding electrode system

• Meter mounting structure and supports

• Casings, conduits, and fittings

• Coordination with the serving utility company

• All labor, materials, tools, and incidentals required for a complete installation

Final connection to the transformer will be performed by the serving utility company.

Materials. Materials shall comply with the applicable requirements of Section 1060 of the Standard Specifications unless otherwise specified.

Meter/main equipment shall conform to the requirements of the serving utility company and shall be suitable for outdoor installation. The meter/main combination equipment shall have the following minimum characteristics:

• Single-phase, three-wire

• 120/240 volts

• 60 ampere rating

• Self-contained meter socket

• Lever bypass type

• Hot sequence configuration

• Line and load bottom entry

• Suitable for overhead or underground service installation

• Integral 60 ampere service disconnect with overcurrent protection

• NEMA 3R weatherproof enclosure

The meter equipment shall be Ameren-approved equipment equivalent to catalog number SESMH223H or other serving utility approved equipment meeting the same requirements.

Service entrance conduit for the utility service shall be 3 inch schedule 80 gray PVC conduit.

A casing conduit below 250th Street shall be 6 inch schedule 80 gray PVC conduit.

Grounding electrode materials shall include:

SECTION (75-3VHB-1)BDR,BP,BJR

• 8-foot copper-clad steel grounding electrode rod

• Grounding electrode conductor sized in accordance with the National Electrical Code

(NEC)

• Grounding clamps and bonding hardware listed for grounding applications

Structural supports shall consist of 2 inch rigid metal conduit vertical supports with metal Unistrut horizontal supports. Concrete used for embedding support conduits shall meet the requirements of Section 1020 of the Standard Specifications.

All materials shall be suitable for installation in outdoor environmental conditions.

Construction Requirements. The Contractor shall coordinate installation of the electrical service with the serving utility company and comply with all applicable utility installation requirements.

The meter/main equipment shall be installed on a freestanding H-support structure constructed in accordance with the following requirements.

Vertical supports shall consist of 2-inch rigid metal conduit with protective caps installed on the top of each conduit. The conduits shall be embedded not less than 3 feet into the ground and set in concrete. Concrete placement shall not obstruct conduit entrances or raceway installation.

Horizontal supports shall consist of metal Unistrut, or equal structural framing members securely attached to the vertical supports.

The meter/main equipment shall be securely mounted to the support structure.

The centerline of the meter socket shall be installed between 4.5 feet and 5.5 feet above finished grade, unless otherwise required by the serving utility. The meter equipment shall be installed with a minimum 6 inches clearance from any obstruction.

The Contractor shall install 3-inch schedule 80 gray PVC conduit for the utility service entrance on the left side of the meter equipment. The conduit shall be buried not less than 36 inches below finished grade and shall include a locknut, insulated bushing, and female-to-male adapter at the meter equipment.

Service conductors shall be installed within the raceway as required to complete the service installation.

The Contractor shall furnish and install the grounding electrode system for the service installation.

The grounding electrode system shall include an 8-foot grounding electrode rod, grounding electrode conductor, and bonding connections required to properly ground the service equipment in accordance with the National Electrical Code (NEC) and serving utility requirements.

Conduit entries at the meter equipment shall include locknuts, insulated bushings, and fittings required to protect conductors from mechanical damage.

All equipment shall be installed plumb, securely supported, and protected from weather exposure.

The Contractor shall coordinate installation of service conductors with the serving utility company to allow for final termination. Final connection of the service conductors to the transformer will be performed by the serving utility company. The Contractor shall coordinate all required inspections with the authority having jurisdiction and the serving utility prior to energizing the service.

SECTION (75-3VHB-1)BDR,BP,BJR

Basis of Payment. This work will be paid for at the contract unit price per LUMP SUM for ELECTRIC SERVICE INSTALLATION (SPECIAL). Payment shall include full compensation for furnishing and installing service raceways, service conductors, meter/main equipment, mounting structures, supports, grounding electrode system, conduit, fittings, coordination with the serving utility company, and all labor, materials, equipment, and incidentals necessary to complete the work.

CONCRETE PAD

Description. This work shall be according to Sections 423, and 1020 of the Standard Specifications except as modified herein. This work shall consist of constructing a reinforced 10 x 10 foot by 6 inch thick concrete pad on a prepared subgrade. The reinforcement shall consist of non coated, 6 x 6 inch No. 6 welded wire reinforcement according to Article 1006.10 of the Standard Specifications.

Basis of Payment. This work will be paid for at the contract unit price per SQUARE YARD for

CONCRETE PAD.

REMOVAL OF CONDUIT ATTACHED TO STRUCTURE

Description. This work shall consist of removing existing conduit attached to a structure according to applicable portions of Section 842 of the Standard Specifications and as directed by the Engineer.

Removal. Electric conduit shall be cut off and abandoned to a minimum depth of 1 ft. below grade. Conduit, cables, hanger system, junction boxes, and all associated materials shall become the property of the Contractor and shall be removed and disposed of from the jobsite at no additional cost.

Method of Measurement. The conduit attached to structure will be measured for payment in feet in place.

Basis of Payment. This work will be paid for at the contract unit price per FOOT for REMOVE

CONDUIT ATTACHED TO STRUCTURE.

SECTION (75-3VHB-1)BDR,BP,BJR

CLEANING AND PAINTING CONTACT SURFACE AREAS OF EXISTING STEEL

STRUCTURES

Effective: June 30, 2003 Revised: October 23, 2020

Description. This work shall consist of the surface preparation and painting of existing steel structures in areas that will be in contact with new steel.

The existing steel at primary connections (faying surfaces) shall be prepared and primed as specified herein prior to connecting new structural steel to the existing structure.

The existing steel at secondary connections shall be prepared, and if bare metal is exposed, primed as specified herein prior to connecting new structural steel to the existing structure.

General. The existing coatings shall be assumed to contain lead and may also contain other toxic metals. Any plans that may be furnished for the work, and any dimensions or other information given regarding a structure, are only for the purpose of assisting bidders in determining the type and location of steel to be cleaned and painted. It is the responsibility of the Contractor to verify this information and the accuracy of the information provided shall in no way affect the price bid for structural steel.

Materials. The Bureau of Materials and Physical Research has established a list of all products that have met preliminary requirements. Each batch of material must be tested and approved before use.

The paint materials shall meet the requirements of the following articles of the Standard Specification:

Item Article

a) Organic Zinc Rich Primer 1008.05

b) Aluminum Epoxy Mastic 1008.03

Submittals:

a) Manufacturer's application instructions and product data sheets. Copies of the paint manufacturer's application instructions and product data sheets shall be furnished to the Engineer at the field site before steel cleaning begins.

b) Waste Management Plan. The Waste Management Plan shall address all aspects of waste handling, storage, testing, hauling and disposal. Include the names, addresses, and a contact person for the proposed licensed waste haulers and disposal facilities. Submit the name and qualifications of the laboratory proposed for Toxicity Characteristic Leaching Procedure (TCLP) analysis.

c) Quality Control (QC) Program. The QC Program shall identify the following; the instrumentation that will be used, a schedule of required measurements and observations, procedures for correcting unacceptable work, and procedures for improving surface preparation and painting quality as a result of quality control findings.

SECTION (75-3VHB-1)BDR,BP,BJR

Construction Requirements. The Contractor shall perform first line, in process QC inspections.

The Contractor shall implement the submitted and accepted QC Program to ensure that the work accomplished complies with these specifications. The designated Quality Control inspector shall be onsite full time during any operations that affect the quality of the coating system (e.g., surface preparation, coating mixing and application, and evaluations between coats and upon completion of the work). The Contractor shall provide artificial lighting in areas where natural light is inadequate, as determined by the Engineer, to allow proper cleaning, inspection, and painting.

Illumination for inspection shall be at least 30 foot-candles (325 LUX). Illumination for cleaning and priming, including the working platforms, access, and entryways shall be at least 20 foot-candles (215 LUX).

The Contractor shall be responsible for any damage caused to persons, vehicles, or property, except as indemnified by the Response Action Contractor Indemnification Act. Whenever the intended purposes of the protective devices are not being accomplished, as determined by the Engineer, work shall be immediately suspended until corrections are made. Painted surfaces damaged by any Contractor's operation shall be removed and repainted, as directed by the Engineer, at the Contractor's expense.

Weather Conditions. Surfaces to be primed after cleaning shall remain free of moisture and other contaminants. The Contractor shall control his/her operations to ensure that dust, dirt, or moisture does not come in contact with surfaces cleaned prior to painting. Surfaces painted shall be protected until the coating is sufficiently cured to protect itself from damage.

Restrictions on ambient conditions shall be as per the coating manufacturer’s written specifications.

Surface Preparation: Prior to making connections or painting, all loose abrasives, paint, and residue shall be contained, collected, removed from the surface area and properly disposed of as specified later in this specification.

Soluble Salt Remediation. The Contractor shall implement surface preparation procedures and processes that will remove chloride from the surfaces to levels below 7 micrograms per square centimeter. Surfaces that may be contaminated with chloride include, but are not limited to, expansion joints and all areas that are subject to roadway splash or runoff such as fascia beams and stringers. Surfaces shall be tested for chlorides at a frequency of five tests per bearing line, with tests performed on both the beams and diaphragms/cross-frames at expansion joints.

Methods of chloride removal may include, but are not limited to, hand washing, steam cleaning, or pressure washing with or without the addition of a chemical soluble salt remover as approved by the coating manufacturer and scrubbing before or after initial paint removal. The Contractor may also elect to clean the steel and allow it to rust overnight followed by recleaning, or by utilizing blends of fine and coarse abrasives during blast cleaning, wet abrasive/water jetting methods of preparation, or combinations of the above. If steam or water cleaning methods of chloride removal are utilized over surfaces where the coating has been completely removed, and the water does not contact any lead containing coatings, the water does not have to be collected. The Contractor shall provide the proposed procedures for chloride remediation in the Surface Preparation/Painting Plan.

Upon completion of the chloride remediation steps, the Contractor shall use cell methods of field chloride extraction and test procedures (e.g., silver dichromate) accepted by the Engineer, to test

SECTION (75-3VHB-1)BDR,BP,BJR

representative surfaces that were previously rusted (e.g., pitted steel) for the presence of remaining chlorides. Remaining chloride levels shall be no greater than 7µg/sq cm as read directly from the surface without any multiplier applied to the results. The testing must be performed, and the results must be acceptable, prior to painting each day.

A minimum of 5 tests per 1000 sq. ft. (93 sq m) or fraction thereof completed in a given day, shall be conducted at project start up. If results greater than 7 µg/sq cm are detected, the surfaces shall be recleaned and retested at the same frequency. If acceptable results are achieved on three consecutive days in which testing is conducted, the test frequency may be reduced to 1 test per 1000 sq. ft. (93 sq. m) prepared each day provided the chloride remediation process remains unchanged. If unacceptable results are encountered, or the methods of chloride remediation are changed, the Contractor shall resume testing at a frequency of 5 tests per 1000 sq. ft. (93 sq. m).

Following successful chloride testing the chloride test areas shall be cleaned as specified below.

Painted surfaces of new steel damaged by abrasive blasting or by the Contractor's operations shall be repainted, as directed by the Engineer, at the Contractor's expense.

a) Primary Connections. Primary connections shall be defined as faying (contact) surfaces of high-strength bolted connections specifically noted in plans.

The surfaces of existing steel in all areas that will be in direct contact with new steel shall be prepared according to SSPC-SP15, Commercial Grade Power Tool Cleaning using vacuum-shrouded power tools equipped with HEPA filtration. The surface preparation shall remove all rust, mill scale, and existing paint from the contact surface. At the Contractors option, vacuum blast cleaning according to SSPC-SP6, Commercial Blast Cleaning may be substituted for SSPC-SP15 at no additional cost to the Department. The surface profile for primary connection surfaces shall be 1.5 to 3.5 mils (38 to 90 microns).

b) Secondary Connections. Secondary connections shall be defined as all surface areas of existing members that will be in contact with new steel except as previously defined as primary connections.

These surfaces of existing steel in all areas that will be in direct contact with new steel shall be prepared according to SSPC-SP3, Power Tool Cleaning using vacuum-shrouded power tools equipped with HEPA filtration. The surface preparation shall remove all loose rust, loose mill scale, and loose, checked, alligatored and peeling paint from the contact surface. At the Contractors option, vacuum blast cleaning according to SSPC-SP6, Commercial Blast Cleaning or SSPC-SP15, Commercial Grade Power Tool Cleaning may be substituted for SSPC-SP3 at no additional cost to the Department. The surface profile for abrasive blast cleaning and Commercial Grade Power Tool Cleaning shall be 1.5 to 3.5 mils (38 to 90 microns).

Painting. The manufacturer’s written instructions shall be followed for paint storage, mixing, thinning, application, ambient conditions, and drying times between coats. The surface shall be free of dirt, dust, and debris prior to the application of any coat. The coatings shall be applied as a continuous film of uniform thickness free of defects including, but not limited to, runs, sags, overspray, dryspray, pinholes, voids, skips, misses, and shadow-through. Defects such as runs and sags shall be brushed out immediately during application.

SECTION (75-3VHB-1)BDR,BP,BJR

The Engineer will approve surface preparation prior to priming.

a) For Primary connections the surface of the prepared steel cleaned to bare metal shall be primed with an organic zinc rich primer between 3.5 and 5.0 mils (90 and 125 microns) dry film thickness.

b) For Secondary Connections the surface of the prepared steel cleaned to bare metal shall be painted with either one coat of epoxy mastic between 5 and 7 mils (125 microns to 180 microns) in thickness or one coat of an organic zinc rich primer between 3.5 and 5.0 mils (90 and 125 microns) in thickness. Areas not cleaned to bare metal need not be painted.

For primary connections, the primer on the surface of the prepared steel shall cure according to the manufacturers instructions prior to connecting new structural steel to the existing structure.

For secondary connections, the primer on the surface of the prepared steel need only be dry to touch prior to connecting new steel to the existing structure.

The surrounding coating at each prepared location shall be feathered for a minimum distance of 1 1/2 in.