Boiler Tube Replacement Repair Patching and Caulking Services
Open State & local contract opportunity Posted
- Solicitation number
- 10285
- State
- New Jersey
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Ledah Arbubaker larbubaker@nps.k12.nj.us (973) 733-8589
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Newark Board of Education is soliciting bids for boiler tube replacement, repair, patching, and caulking services, including welding, across approximately 75 school and facility locations, with electronic bids due November 19, 2026 before 12:00 p.m. EST. The solicitation is unrestricted with no set-aside. Bidders must be pre-qualified with the New Jersey Department of Property Management and Construction in HVAC (C039) or Boilers-New/Repair (C033) classifications and demonstrate at least five years of similar-service experience.
Welders must hold NJ R-Stamp certified welding licenses, and the contractor must provide a state-certified boiler-welding inspection certificate for each completed welding project. Welding and boilermaker work must follow New Jersey Department of Labor and Workforce Development prevailing wage rates, with certified weekly payrolls submitted within ten days of wage payment. Repaired equipment must carry an NBIC repair symbol tag identifying the contractor, date, repair type, and mechanic. Contractors must maintain 24/7 emergency telephone and email availability. Attachment A inventories boiler makes, models, serial numbers, burner types, fuel specifications, and permit information across the locations.
The contract runs two years from award with one additional two-year renewal option, with an anticipated term of January 1, 2027 through December 31, 2028. Pricing must be entered electronically, remain firm for the contract period, and include labor, overhead, administrative costs, and profit, with no separate billing for travel, mileage, or tolls. Bid and performance bonds are required. Insurance requires $1 million combined single limit for both general liability and commercial auto, plus workers' compensation and installation floater coverage, with the district named as additional insured. Liquidated damages are $250 per day per affected location. The district may terminate for convenience on ten days' written notice.
Award goes to the lowest responsible and responsive bidder. The pre-submission meeting and written question deadline both closed November 4, 2026. Bids are submitted through https://npssourcing.com/.
Opportunity text
SCOPE OF WORK C1.1 Contractor shall furnish all labor, equipment, materials, and parts to perform boiler tube replacement, repair, patching and caulking services, including welding on all boilers for various locations within the Newark Board of Education (NBOE, District). C1.2 All welding shall conform to the rules and regulations as established by the New Jersey Department of Labor and Workforce Development prevailing wage rates governing Boilermaker. C1.3 The awarded Contractor performing public works for the NBOE shall be required to pay the established wage and fringe benefit rates as guided by New Jersey Department of Labor and Workforce Development Prevailing Wage rate for the craft of Boilermaker. Welders shall have a NJ R-Stamp certified welding license. Upon completion of each welding project, the Contractor shall provide the Director of Project Control and/or appointed designee with a State certified boiler-welding inspection certificate specific to that project. C1.4 Equipment to be repaired must be tagged or labeled at the time of repair. This tag shall display the copyright- protected repair symbol of the National Board Inspection Code (NBIC) and show the name of the Contractor, date, type of repair performed and the name and signature of the mechanic who performed the work. C1.5 Whenever possible, subsequent repairs at particular sites shall be performed by the same service mechanic originally assigned. C1.6 Any defective or malfunctioning equipment shall be repaired during the service call and/or reported to the Director of Project Control and/or designee as soon as it is discovered. If further extensive repairs to equipment are needed, the Contractor may be required to submit a written detailed time/materials estimate for repairs. C1.7 The awarded Contractor must receive written, signed approval from the Director of Project Control and/or designee before proceeding with any work. All completed jobs shall be inspected and approved by the Director of Project Control and/or designee prior to payment. C1.8 Pre-approval from the Director of Project Control is required for repair parts in excess of $1,000.00. C1.9 Upon request, the successful Contractor may be required to provide consulting services for existing equipment and submit a detailed analysis for repairs or replacement. This will be paid for at the normal service hourly rates. C1.10 The Newark Board of Education reserves the right to accept the Contractors estimate for repairs or to have the work performed by Newark Board of Education personnel or others. C1.11 If equipment must be shut down for service or repairs, the Contractor is required to coordinate the schedule with the Director of Project Control and/or designee. C1.12 The awarded Contractor is required to sign in/out of each Newark Board of Education location. C1.13 The school directory is available via https://www.nps.k12.nj.us/schools/ . C1.14 The Contractor covenants and agrees at all times during the effective term of the contract to observe all applicable City, County, State and Federal Laws, ordinances, rules, and regulations. The Contractor further agrees to indemnify and hold harmless the District and its officers, agents, and employees from all claims, damages, losses, and expense arising out of or resulting from the performance of the Contractor, his officers, agents or employees. C2 CODES C2.1 All projects must conform to the Uniform Construction Code (UCC), applicable building, electrical, mechanical, plumbing and safety codes. C2.2 Permits are not required for ordinary repairs, as defined by the UCC. When permits are required, the Contractor shall be responsible for preparing properly signed/sealed drawings, sketches, and applying for permits. The cost shall be included in the project cost. C3 GUARANTEE C3.1 All major assemblies components and/or parts replaced by the Contractor shall be guaranteed against any material defect and poor workmanship for a period of one (1) year from date of installation, unless otherwise specified. C3.2 The Contractor shall provide a written guarantee for all major assembly/components and/or parts furnished to the Newark Board of Education. C4 BOILER TUBE REPAIRS, WELDING & INSULATION C4.1 All tubes shall be of new seamless steel quality boiler tubes, manufactured in the United States in accordance with The American Society of Mechanical Engineers (ASME) Code, following standard gauge sizes: Standard size 1.5" fire tube, #12 gauge Standard size 2" fire tube, #12 gauge Standard size 2 1/2" fire tube, #12 gauge Standard size 3" fire tube, #12 gauge Standard size 3 1/2" fire tube, #11 gauge Standard size 4" fire tube, #10 gauge Standard size 2-24 water tube The tube diameters provided are approximate. All tubes are to extend 3/16" approximately, on each end. Tubes located in the FIRST PASS in the boiler MUST BE PROPERLY ROLLED AND BEADED FLUSH TO THE TUBE SHEET on each end. All other tubes can be rolled and flared; or rolled and beaded, on each end as needed to seal the tube. The Contractor shall use firebox steel flange plate material on all boiler shell patch repairs. All welding on steel boiler shells, patch repairs, seams and seal welding shall be arc electric homogeneous welding by certified welders. All bidders shall be NJ R-Stamp (repair) certified with a welding license. Bidders shall include a copy of their R- Stamp certified welding license with their bid submission. C5 TUBE REPLACEMENT C5.1 This contract requires the replacement of boiler tubes at multiple schools within the Newark Board of Education. All replacement sizes, gauges, and fabrications shall be as prescribed in these specifications and in accordance with American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC). C6 PROTECTION OF EQUIPMENT C6.1 The Contractor shall remove grates wherever necessary to proceed with the project, and replace same when finished. All motors and openings into boiler settings, especially those equipped with forced draft systems, are to be carefully covered to prevent dirt/debris from getting into the bearings or being otherwise damaged. The Contractor will be held responsible for any damage to grates, motors, and/or any other equipment. C7 REMOVAL OF OLD MATERIALS C7.1 The awarded Contractor shall remove all old materials and debris created by his work as soon as the project is completed, leaving the boiler room in a broom clean condition. C8 PROJECT RESPONSE TIME C8.1 The awarded Contractor shall provide and maintain a twenty-four (24) hour, seven (7) day per week emergency telephone number and email address.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity