Black Creek Water Resource Development Pump Station Project Construction
Cancelled State & local contract opportunity Posted
- Solicitation number
- ITB-00865
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 54531 Industrial And Construction Machinery, Equipment, Components And Parts (Not Otherwise Classified)
- 90930 Building Construction (Not Otherwise Classified)
- 91360 Construction, Water System/Plants, Main And Service Line
- 91230 Construction, Power Plant
- 91356 Construction, Utility/Underground Projects
- 91013 Elevator Installation, Maintenance, Repair And Inspection
- 91216 Boring, Drilling, Testing, And Soundings, Including Concrete Coring
- 92597 Water Supply, Treatment, And Distribution/Engineering
- 91319 Construction, Curb And Gutter (Includes Maintenance, Repair, And Removal)
- UNSPSC codes
- 22101900 Building construction machinery and accessories
- 72121400 Specialized public building construction services
- 72121505 Waste water and sewage treatment plant construction service
- 72121506 Power plant construction service
- 72141126 Underground utilities construction service
- 72151606 Underground engineering for communication equipment
- 73181007 Boring services
- 81101527 Wastewater engineering
- 95121633 Culvert
Opportunity details come from vendor.myfloridamarketplace.com. Updated .
About this opportunity
This Invitation for Bids (IFB) is for the Black Creek Water Resource Development Pump Station Project Construction in Clay County, Florida. The project involves constructing a masonry pump station with four vertical turbine variable frequency drive pumps, a raw water intake structure in the South Fork of Black Creek, sitework, an intake piping system, concrete work, mechanical piping, instrumentation, and electrical components. The pump station will have the capability to draw up to 10 million gallons per day (MGD) of water from Black Creek. Subsequent solicitations will include purchasing and installing approximately 17 miles of 30-inch ductile iron pipe to transport water from the pump station to Alligator Creek. The estimated construction cost range is $10,000,000 to $14,000,000, and the contract term is 475 days from the effective date. A mandatory pre-bid conference is scheduled for May 23, 2022, and bids are due by June 9, 2022.
The IFB does not specify any set-aside designations or restrictions on the types of organizations that can respond. It also does not list any incumbent vendors or current contractors, nor does it provide information on existing infrastructure or technology that requires integration. The funding for the project will come from the St. Johns River Water Management District's budget over multiple fiscal years, and the District has included a $300,000 Supplemental Work Allowance to cover contractor activities not included in the original scope of work.
Opportunity text
This project involves the construction of a masonry pump station with four vertical turbine variable frequency drive pumps, a raw water intake structure in the south fork of Black Creek (an active and navigable waterway), sitework, an intake piping system (42" micro-tunnel casing with a 24" carrier pipe), concrete work, mechanical piping, instrumentation, and electrical components. The pump station will be capable of drawing up to 10 MGD of water from Black Creek. Under one or more subsequent solicitations, approximately 17 miles of 30" ductile iron pipe will be purchased and installed to pipe water from the pump station to Alligator Creek.
Files