Bike Path Seal Coating
Closed State & local contract opportunity Posted
- Solicitation number
- 26-6030-10-0-2026/Bid
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Village of Oswego, Illinois is requesting bids for crack fill and bituminous surface treatment (class A2) on eight miles of asphalt bike path under ITB with proposals due June 9, 2026 at 10:00 a.m. Central Daylight Time.
Work must comply with Sections 403 and 451 of the Illinois Department of Transportation Standard Specifications for Road and Bridge Construction, 2022 Edition. The scope includes bituminous surface treatment application and painted pavement markings in accordance with the Illinois Manual on Uniform Traffic Control Devices, latest edition. Existing pavement markings shall be documented prior to seal coat application, with new markings applied in the same locations as existing unless otherwise directed by the Village representative. The contractor must coordinate the timing of crack sealing and seal coating for each path at least 48 hours in advance with the designated Village representative.
All bidders must provide a 5% bid bond. The bid package includes the ITB specifications document and three attachments (Attachment A, Attachment B in XLSX format, and Attachment C in XLSX format), all available for download. Eight planholders have registered interest as of the filing date. No pre-bid conference is available. eBidding submission is available through DemandStar.
Opportunity text
The Village of Oswego is seeking a contractor to apply crack fill and bituminous surface treatment, class A2, for eight miles of asphalt path. Work includes painted pavement markings in accordance with the Illinois Manual on Uniform Traffic Control Devises (MUTCD), latest edition. Locations of existing pavement markings shall be documented prior to application of seal coat and new markings shall be applied in the same locations as existing unless instructed otherwise by the Village representative. The timing of crack sealing and sealcoating for each path shall be coordinated at least 48 hours in advance with the designated Village representative.
Files
| File | Type | Posted |
|---|---|---|
| village of oswego bike path seal coating.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity