3-WJPS27112301 Big Bend Bid Schedule.xlsx
XLSX spreadsheet 31 KB Posted
- Attached to
- Big Bend Habitat Restoration 2026 Phase
- Solicitation number
- WJPS27112301
- Issued by
- Utah
About this file
Big Bend Habitat Restoration Project - Bid Schedule Summary
This is a bid schedule for the Big Bend Habitat Restoration Project located along the Jordan River in West Jordan, Utah, dated November 23, 2026. The project encompasses comprehensive habitat restoration and infrastructure improvements including general construction activities, demolition and removal of existing features, in-channel work and landscape grading, revegetation across multiple flood and spray zones, installation of an extensive irrigation system, and construction of a pump station facility. The bid schedule contains 94 line items organized into a base bid and four add-alternates, with quantities ranging from individual equipment units to large-scale site work such as 47,552 cubic yards of general excavation and grading, 7,493 cubic yards of topsoil salvage and placement, 41,004 plug plantings, and 2,172 linear feet of irrigation mainline. The base bid encompasses nine major work categories: general construction methods and best management practices; demolitions and removals; in-channel work, landscape grading, and drainage; revegetation for flood zones A and B; irrigation systems for flood zones A and B; pump system components; with additional work available through four add-alternates covering spray zone irrigation and plantings (Zones A/B, C, and D) and miscellaneous landscape, irrigation, and pump system items.
All bid items in the schedule contain zero dollar unit costs and total costs, indicating this is a template document awaiting contractor pricing submissions. The project is structured as a lump-sum contract with a base bid total and separate lump-sum totals for each of the four add-alternates. No specific pricing terms, set-asides, incumbents, funding sources, or contract duration information is provided in this bid schedule document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-PROTECTED INFORMATION REQUEST FORM.docx | DOCX document | |
| 4-WJPS27112301 Big Bend Habitat Restoration.pdf | ||
| 1-COI Guide for Contractors.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
| PROJECT: Big Bend Habitat Restoration Project - Jordan River, West Jordan, UT | Ver 1 -Date: | November 23, 2026 |
| BID SCHEDULE |
| BASE BID | ||||||
| Item # | Description | Quantity | Unit | Unit Cost | Total Cost | Notes / Assumptions |
Alex Heller: Alex Heller:
Include spec reference column. These notes are not included in bid schedule.
| General Construction Methods and BMPs | ||||||
| 1 | Bonds and Insurance | 1 | LS | $ - 0 | ||
| 2 | Contractor Submittals | 1 | LS | $ - 0 | Includes plans, schedules, and equipment lists for Engineer and Owner approval | |
| 3 | Permits | 1 | LS | $ - 0 | Includes UDOT ROW permit, UPDES permits, local construction permits | |
| 4 | Mobilization and Demobilization | 1 | LS | $ - 0 | Includes construction access, temporary facilities, staging, and repair | |
| 5 | Traffic Control | 1 | LS | $ - 0 | ||
| 6 | Construction Stakeout and Survey | 1 | LS | $ - 0 | ||
| 7 | Protect-In-Place (PIP) | 1 | LS | $ - 0 | Tree, utility, monitoring well protection | |
| 8 | Erosion Control and General BMPs | 1 | LS | $ - 0 | ||
| 9 | Care of Water | 1 | LS | $ - 0 | ||
| Sub Total: | $ - 0 | |||||
| Demolitions and Removals | ||||||
| 10 | Remove and Dispose Groundwater Monitoring Well | 1 | EA | $ - 0 | Cut down MW6 and dispose offsite. | |
| 11 | Remove and Dispose Chainlink Fence | 1,742 | LF | $ - 0 | Keep in place until split-rail is installed to keep people out of site. | |
| 12 | Remove and Dispose Pipe - 18" HDPE Pipe | 40 | LF | $ - 0 | At Jordan River Parkway Trail over south channel inlet. | |
| 13 | Remove and Dispose Asphalt Pavement | 138 | SF | $ - 0 | At Jordan River Parkway Trail over south channel inlet | |
| 14 | Remove and Dispose Invasive Species Trees, Stumps, and Roots | 12 | EA | $ - 0 | Within Project Limits | |
| 15 | Remove and Reuse Mature Cottonwood | 4 | EA | $ - 0 | At meander inlet area | |
| 16 | Salvage Existing Tree and Transplanting | 10 | EA | $ - 0 | At confluence area | |
| Sub Total: | $ - 0 | |||||
| In-Channel Work, Landscape Grading, and Drainage | ||||||
| 17 | Salvage, Stockpile, and Place Topsoil | 7,493 | CY | $ - 0 | Assume average 8" topsoil to be salvaged in areas identified. Includes clearing and grubbing. Placed quantity shown includes 25% bulking factor. | |
| 18 | General Excavation and Grading | 47,552 | CY | $ - 0 | Assume excavated material will be mostly gravel/clay/mixed material. Use as fill for landscaped berm. | |
| 19 | Furnish and Install Boulder | 1,812 | TON | $ - 0 | Placed in boulder grade controls, stacked boulder wall, habitat boulder, and headwall around 15" HDPE pipes | |
| 20 | Furnish and Install Boulder Grout | 112 | CY | $ - 0 | Placed at drop structure A | |
| 21 | Furnish and Install Coarse Alluvium | 379 | CY | $ - 0 | Placed at meander channel inlet, between drop structures A and B, low flow crossing, and south inlet channel fish screen. | |
| 22 | Furnish and Install 8oz Filter Fabric | 445 | SY | $ - 0 | Placed behind stacked boulder wall | |
| 23 | Furnish and Install Crusher Fines | 228 | CY | $ - 0 | Placed at pond trail, and future parking lot connection. Overlook Trail is an Add-Alt | |
| 24 | Furnish and Install UTBC, Grade 1-1/2 | 536 | CY | $ - 0 | Placed under all trails listed above and for maintenance road. Overlook Trail is an Add-Alt | |
| 25 | Furnish and Install 4oz Filter Fabric | 1,368 | SY | $ - 0 | Placed under all trails listed above. Overlook Trail is an Add-Alt | |
| 26 | Furnish and Install Drainage Pipe - 15" HDPE | 200 | LF | $ - 0 | Placed under pond trail and maintenance road for site drainage. Pipe backfill materials (UTBC Grades 1 and 3/4) are incidental. | |
| 27 | Furnish and Install Drainage Pipe - 24" HDPE | 40 | LF | $ - 0 | Placed at south inlet channel with fish screen structure. Pipe backfill materials (UTBC Grades 1 and 3/4) are incidental. | |
| 28 | Rebuild Boulder Headwall | 1 | LS | $ - 0 | Placed with 24" pipe - salvage and reuse existing boulder | |
| 29 | Furnish and Install Asphalt Paving | 138 | SF | $ - 0 | ||
| 30 | Furnish and Install Post-and-Wire Fence | 2,165 | LF | $ - 0 | ||
| 31 | Furnish and Install Maintenance Access Gate | 1 | EA | $ - 0 | ||
| Sub Total: | $ - 0 | |||||
| Revegetation (Flood Zones A and B) | ||||||
| 32 | Supply, Broadcast, and Rake Seed Mix | 13.55 | AC | $ - 0 | ||
| 33 | Supply and Plant D40 Container Plantings | 4,732 | EA | $ - 0 | ||
| 34 | Supply and Plant Riparian Poles | 0 | EA | $ - 0 | ||
| 35 | Supply and Plant Large Trees (10 gal) | 35 | EA | $ - 0 | ||
| 36 | Supply and Plant Large Trees (4-6" Dia) | 0 | EA | $ - 0 | ||
| 37 | Supply and Plant Plug Plantings | 41,004 | EA | $ - 0 | ||
| Sub Total: | $ - 0 | |||||
| Irrigation System (Flood Zones A and B) | ||||||
| 38 | Irrigation Control System | 1 | LS | $ - 0 | Controller, Control Wire, Grounding, Conduit, Power Connection, Antenna | |
| 39 | Irrigation Connection | 1 | LS | $ - 0 | Filter, Master Valve, Flow Sensor, Enclosures, Concrete Pads, Etc | |
| 40 | Irrigation Mainline Area A | 2,172 | LF | $ - 0 | From Pump House Across River and Upper Limits of Floodplain, Includes Irrigation Main and Control Wire/Conduit | |
| 41 | Irrigation Mainline Area B | 1,976 | LF | $ - 0 | Lower Limits of Floodplan (Both Sides of River), Includes Irrigation Main and Control Wire/Conduit | |
| 42 | Irrigation Mainline Area A (Fused HDPE) | 120 | LF | $ - 0 | Where Irrigation Main Crosses River | |
| 43 | Mainline Area A Flood Irrigation Zones | 20 | EA | $ - 0 | Each zone is approximately 10,000 SF and inlcudes automatic control valve, wiring, decoder, valve box, piping and fiitings from mainline, piping and fittings to bubble up box, and bubble up box. | |
| 44 | Mainline Area B Flood Irrigation Zones | 29 | EA | $ - 0 | Each zone is approximately 10,000 SF and inlcudes automatic control valve, wiring, decoder, valve box, piping and fiitings from mainline, piping and fittings to bubble up box, and bubble up box. | |
| Sub Total: | $ - 0 | |||||
| Pump System | ||||||
| 45 | Shoring and Dewatering for Structural Fill | 1 | LS | $ - 0 | ||
| 46 | Existing Pond Outlet Fish Screen Modifications | 1 | LS | $ - 0 | ||
| 47 | Existing Pond Intake Structure Modifications | 1 | LS | $ - 0 | ||
| 48 | 6-Inch DR-25 C900 PVC Pipe | 760 | LF | $ - 0 | ||
| 49 | 6-Inch Gate Valve | 5 | EA | $ - 0 | ||
| 50 | Fish Screen Structure | 1 | LS | $ - 0 | ||
| 51 | Pump Station Site Work and Demo | 1 | LS | $ - 0 | ||
| 52 | Pump Station Building | 1 | LS | $ - 0 | ||
| 53 | Pump Station Piping | 1 | LS | $ - 0 | ||
| 54 | Pump Station Electrical and Site Electrical | 1 | LS | $ - 0 | ||
| 55 | Pump Station HVAC | 1 | LS | $ - 0 | ||
| 56 | Wet Well | 1 | LS | $ - 0 | ||
| 57 | Supply and Install Pump (Duty Pump) | 1 | EA | $ - 0 | ||
| 58 | Supply and Install Pump (Jockey Pump) | 1 | EA | $ - 0 | ||
| 59 | Reconnection of Aerator System, Piping, and Electrical | 1 | LS | $ - 0 | ||
| Sub Total: | $ - 0 | |||||
| BASE BID LUMP SUM (NOT TO EXCEED): | $ - 0 |
| ADD-ALT 1: Spray Zone A and B Irrigation and Plantings | ||||||
| Item # | Description | Quantity | Unit | Unit Cost | Total Cost | Notes / Assumptions |
Alex Heller: Alex Heller:
Include spec reference column. These notes are not included in bid schedule.
| Revegetation (Spray Zones A and B) | |||||
| 60 | Supply, Broadcast, and Rake Seed Mix | 9.62 | AC | $ - 0 | |
| 61 | Supply and Plant D40 Container Plantings | 1,555 | EA | $ - 0 | |
| 62 | Supply and Plant Riparian Poles | 0 | EA | $ - 0 | |
| 63 | Supply and Plant Large Trees (10 gal) | 92 | EA | $ - 0 | |
| 64 | Supply and Plant Large Trees (4-6" Dia) | 0 | EA | $ - 0 | |
| 65 | Supply and Plant Plug Plantings | 0 | EA | $ - 0 | |
| Sub Total: | $ - 0 | ||||
| Irrigation System (Spray Zones A and B) | |||||
| 66 | Mainline Area A Spray Irrigation Zones | 18 | EA | $ - 0 | |
| 67 | Mainline Area B Spray Irrigation Zones | 5 | EA | $ - 0 | |
| Sub Total: | $ - 0 | ||||
| ADD-ALT 1 LUMP SUM (NOT TO EXCEED): | $ - 0 |
| ADD-ALT 2: Spray Zone C Irrigation and Plantings | ||||||
| Item # | Description | Quantity | Unit | Unit Cost | Total Cost | Notes / Assumptions |
Alex Heller: Alex Heller:
Include spec reference column. These notes are not included in bid schedule.
| Revegetation (Spray Zone C) | |||||
| 68 | Supply, Broadcast, and Rake Seed Mix | 7.13 | AC | $ - 0 | |
| 69 | Supply and Plant D40 Container Plantings | 1,529 | EA | $ - 0 | |
| 70 | Supply and Plant Riparian Poles | 0 | EA | $ - 0 | |
| 71 | Supply and Plant Large Trees (10 gal) | 16 | EA | $ - 0 | |
| 72 | Supply and Plant Large Trees (4-6" Dia) | 12 | EA | $ - 0 | |
| 73 | Supply and Plant Plug Plantings | 1,167 | EA | $ - 0 | |
| Sub Total: | $ - 0 | ||||
| Irrigation System (Spray Zone C) | |||||
| 74 | Irrigation Mainline Area C | 1,423 | LF | $ - 0 | |
| 75 | Mainline Area C Spray Irrigation Zones | 10 | EA | $ - 0 | |
| Sub Total: | $ - 0 | ||||
| ADD-ALT 2 LUMP SUM (NOT TO EXCEED): | $ - 0 |
| ADD-ALT 3: Spray Zone D Irrigation and Plantings | ||||||
| Item # | Description | Quantity | Unit | Unit Cost | Total Cost | Notes / Assumptions |
Alex Heller: Alex Heller:
Include spec reference column. These notes are not included in bid schedule.
Alex Heller: Alex Heller:
| Include spec reference column. These notes are not included in bid schedule. | Revegetation (Spray Zone D) | ||||||
| 76 | Supply, Broadcast, and Rake Seed Mix | 7.51 | AC | $ - 0 | |||
| 77 | Supply and Plant D40 Container Plantings | 847 | EA | $ - 0 | |||
| 78 | Supply and Plant Riparian Poles | 0 | EA | $ - 0 | |||
| 79 | Supply and Plant Large Trees (10 gal) | 39 | EA | $ - 0 | |||
| 80 | Supply and Plant Large Trees (4-6" Dia) | 72 | EA | $ - 0 | |||
| 81 | Supply and Plant Plug Plantings | 1,974 | EA | $ - 0 | |||
| Sub Total: | $ - 0 | ||||||
| Irrigation System (Spray Zone D) | |||||||
| 82 | Irrigation Mainline Area D | 1,618 | LF | $ - 0 | |||
| 83 | Mainline Area D Spray Irrigation Zones | 11 | EA | $ - 0 | |||
| Sub Total: | $ - 0 | ||||||
| ADD-ALT 3 LUMP SUM (NOT TO EXCEED): | $ - 0 |
| ADD-ALT 4: Misc. Landscape, Irrigation and Pump System Items | ||||||
| Item # | Description | Quantity | Unit | Unit Cost | Total Cost | Notes / Assumptions |
Alex Heller: Alex Heller:
Include spec reference column. These notes are not included in bid schedule.
| Landscape | ||||||
| 84 | Haul-off Stockpile | 10,000 | CY | $ - 0 | ||
| 85 | Furnish and Install Crusher Fines | 641 | CY | $ - 0 | Placed at overlook trail. | |
| 86 | Furnish and Install UTBC, Grade 1-1/2 | 641 | CY | $ - 0 | Placed under all crusher fines trails listed above. | |
| 87 | Furnish and Install 4oz Filter Fabric | 4,999 | SY | $ - 0 | Placed under all crusher fines trails listed above. | |
| Sub Total: | $ - 0 | |||||
| Irrigation System | ||||||
| 88 | Flow/Pressure Control Valves Locking Handle | 49 | EA | $ - 0 | Add pressure/flow control valves to floodplain zones. | |
| Sub Total: | $ - 0 | |||||
| Pump System | ||||||
| 89 | 48-Inch Manhole with Ballast | 2 | EA | $ - 0 | ||
| 90 | 2-Inch Stabilization Rock | 205 | TON | $ - 0 | ||
| 91 | Stabilization Fabric | 325 | SY | $ - 0 | ||
| 92 | Geogrid | 100 | SY | $ - 0 | ||
| 93 | Supply and Install Pump (Duty Pump) | 1 | EA | $ - 0 | ||
| 94 | Electrical for Additional Duty Pump | 1 | LS | $ - 0 | ||
| Sub Total: | $ - 0 | |||||
| ADD-ALT 4 LUMP SUM (NOT TO EXCEED): | $ - 0 |