Bergen County Improvement Authority/Bergen New Bridge Medical Center Building 8 - 2nd Floor CT Room 230 E. Ridgewood Avenue, Paramus NJ 07652
Open State & local contract opportunity Posted
- Solicitation number
- BCIA-2026-005
- State
- New Jersey
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Bergen County Improvement Authority is soliciting bids, due December 17, 2026, for building management system (BMS) controls and a computed tomography (CT) room alteration at Bergen New Bridge Medical Center Building 8 in Paramus, New Jersey. The controls scope centers on new BACnet/IP-based DDC cabinets installed in BMS closets and mechanical/electrical rooms to control and monitor, but not limited to, air handling units, VAV terminal boxes, exhaust fans, CRAC units serving Teledata rooms, fan coil units, unit heaters, heated air curtains, and domestic water heaters. Smoke clearance controllers must be UL 864 UUKL listed.
Integration requirements include Modbus interfaces to electrical and plumbing meters, VFD integration, and interface with the fire alarm system for smoke shutdown and smoke clearance zone activation. The BMS also includes operating room and isolation room pressure controls and monitoring, and the controls contractor furnishes VAV, fan coil, and cabinet heater controllers for factory installation. Shipping of equipment controllers and actuators to the VAV manufacturer falls within the scope.
The attached construction specifications, issued for construction July 24, 2026, cover alterations to Fluoroscopy Room #251 and adjacent spaces on the second floor of Building 8A to create CT Scan Room #251, Control Room #249A, and an ADA-accessible patient toilet and changing room #251D. The work includes demolition, new finishes and equipment, and new mechanical, electrical, plumbing, and fire protection systems. Architect RSC Architects (Project Number 50-25-001) and Syska Engineering for MEP design are named. The project uses a single prime contract in a single phase, and the existing CT must remain in service during construction.
Schedule and site conditions include a Critical Path Method schedule with activities limited to 20-day durations, a 15-day review period for action submittals and 7 days for resubmittals, and 72-hour advance notice for disruptive activities. Smoking is prohibited within 25 feet of building entrances. Owner limited occupancy of completed areas before substantial completion is permitted, subject to operational mechanical and electrical systems and successful testing and inspections.
Opportunity text
A. New Bacnet/IP based DDCP cabinets shall be strategically installed in BMS closets and MER's within the building (refer to the BMS Riser diagram on drawing M-800.00) to control and monitor new mechanical equipment (but not be limited to) including the following: 1. Air Handler Units (AHUs) 2. Variable Air Volume Terminals Boxes 3. Miscellaneous Exhaust fans 4. CRAC units for Teledata rooms (Integrated with BMS). 5. Fan coil units 6. Unit heater control 7. Cold smoke clearance control system (AHU's) (DDC controllers shall be UL 864 UUKL listed for smoke clearance application). 8. Steam-to Hot Water Heat Exchanger. (Typical) 9. Monitoring of electrical metering (Electrical meters provided by Division 26. BMS to interface and provide wiring with each meter via Modbus Protocol-Refer to Division 26 drawings for quantity and locations) 10. Monitoring of plumbing meters and alarms. BMS to interface with each meter via Modbus Protocol. Refer to plumbing drawings for quantity and locations. 11. Domestic water heater control (BACnet integration) 12. Monitoring and control of plumbing equipment (provided by Plumbing Contractor). Refer to plumbing drawings for quantity and locations. 13. VFD integration to BMS. 14. Interface with FAS (smoke shutdown and smoke clearance zone activation-typical per AHU) 15. Refer to M-800 series drawings and function included in section 3.4 for additional systems and monitoring and alarm points. 16. VAV, Fan Coil units and Cabinet Heaters controllers shall be furnished by controls contractor and shipped to factory for factory installation. 17. Heated air curtain control and wiring. B. New BMS will also include: 1. Operating Rooms pressure controls and monitoring. 2. Isolation Rooms controls and monitoring. 3. Shipping out of Equipment Controllers and Actuators to VAV manufacturer. 4. Installation of new DDCP panels: a. On the front panel of each AHU DDC panel, provide LED lights annunciating the following conditions: High static trip, Low static trip, Low temp trip. 5. Installation of DDCP Box UPS units. In addition, provide DDCP Box UPS alarm wiring to DDCP located in Electrical Closet or MER. 6. DDC Controller startup and commissioning 7. System controlled and monitored by BMS startup and commissioning services. 8. Software Programming. 9. Installations of new custom build dynamic graphics. Engineers mechanical AutoCAD drawings shall be used to create accurate floor plans indicating duct work with terminal units and space sensors. 10. Installation and setup of BMS remote alarm notification. 11. Measurement and Verification (M+V) requirements for LEED certification. The BMS shall continuously monitor metering and energy usage data of electrical, mechanical and plumbing equipment as required. C. Installation of Building Management System (BMS) 1. The BMS Contractor shall furnish and install a complete Building Management System (BMS) (Interface with existing BMS network for all mechanical systems and other facility systems as included in the project documents. The BMS will provide the functional features as defined in Part 1-General requirements, Part 2-Products, and Part 3- Execution of these Specifications. The BMS Contractor shall provide a complete and operational system that will perform sequences of operations as verified by Owner Representative and Engineer. 2. The components furnished shall be the most recent products offered by the BMS manufacturer that meet the specifications. If there are improved models of any components that become available before the on-site commencement of installation then these shall be offered by the BMS Contractor to the General Contractor at no additional cost to the Owner. The Owner shall have the option to accept or decline the offer. The components offered shall have been in successful operation in at least 2 similar applications for a minimum of 12 months. 3. The BMS Contractor shall provide all software licenses necessary for the legal operation of the BMS software, including remote alarm notification (existing). 4. The BMS Contractor is responsible to coordinate all installation activities with General Contractor Site Facility personnel and the Engineer by submitting a written installation schedule outlining all proposed BMS installation activities. The schedule should include the anticipated time to install new controllers and network equipment, removal of existing equipment if applicable, installation of new monitoring devices and wiring, software programming, testing/commissioning, training and system acceptance. 5. Commissioning of Mechanical Systems: The BMS Contractor shall provide all labor as required to assist with the commissioning of all equipment and systems as scheduled and required by the projects Commissioning Agent. 6. In addition, the following apply: a. The work under this Section shall include all materials and labor to perform all work required for the installation of the BMS as specified. b. The drawings and Specifications are complementary to one anothermeaning that what is called for on one is to be considered called for in both. Where conflicts exist between the Specifications and/or drawings, the more stringent requirement shall apply. c. Where work specified under other Sections of this Specification connects to equipment or systems that are listed and described in this Section, the BMS Contractor shall provide proper connection(s) to such equipment, including trade coordination. D. Provide all miscellaneous low voltage field device mounting and interconnecting wiring for all Building mechanical systems included in this project. E. Provide control power transformers/power supplies for all new equipment and control devices as required. F. Provide and install proper earth ground on all BMS equipment to prevent the build-up of electromagnetic voltage potential. All BMS equipment shall be EMI immune. G. Interface/integrate with third-party equipment as defined and specified. H. Provide hardwire interlocks for all systems requiring interlock as noted (Fire Alarm System, Mechanical, etc.). I. Provide new system graphics and revise existing color graphics as required for each HVAC, electrical, plumbing, and piping system. Maintain Owner Standard information requirements. Provide scaled floor plans indicating equipment location, service, and system data as required by this specification. Graphics to incorporate integrated points communicated via multiple sources including direct protocol integration, gateways and third party interfaces. Origin of information shall be transparent to the operator and shall be controlled, displayed, trended, etc. as if the points were hardwired to the BMS. In addition, the following device dry contacts shall annunciate an alarm on the BMS graphics: 1. High static trip 2. Low static trip 3. Low temp trip 4. Smoke trip J. System Performance: Comply with the following performance requirements: Graphic Display: Display graphic with minimum 20 dynamic points with current data within 5 seconds, Graphic Refresh: Update graphic with minimum 20 dynamic points with current data within 5 seconds, Object Command: Reaction time of less than 5 seconds between operator command of a binary object and device reaction, Object Scan: Transmit change of state and change of analog values to control unit or workstation within 5 seconds, Alarm Response Time: Annunciate alarm at workstation within 2 seconds, Program Execution Frequency: Programmable controllers shall execute DDC PI control loops, and scan and update process values and outputs at least once per second. K. Reporting Accuracy and Stability of control: Report values and maintained measured variables shall be within the following range: Water temperature: +/-.5degF, Water flow: +/-5% of full scale. All space/area temperature, humidity and space pressurization setpoints and tolerance limits shall be in conformance with specification section 23 05 93 "Testing, Adjusting and Balancing of HVAC Systems". L. Provide the following support for all components furnished under this sub-contract: 1. Warranty and service during the defects liability period. 2. Submittals, samples and record documentation. 3. Comprehensive commissioning and testing services. 4. Detailed theoretical and practical training services for the BMS Supervisors and Operators. 5. BMS equipment coordination with other site Specialists (Fire Alarm, etc.). 6. Comprehensive and complete interoperability documentation and method statement for all third-party systems. 7. Comprehensive PICS documentation regarding the BACnet object ID, component IP addresses, databases for all system database points. 1.7 COORDINATION WITH OTHER TRADES A. Contractors, Sub-contractors, Employees 1. It will be the duty of this Contractor to work in cooperation with other contractors, and with other sub-contractors and employees, rendering assistance and arranging his or her work so that the entire project will be delivered in the best possible condition and in the shortest time. The BMS Contractor will coordinate with other Trade Contractors regarding the location and size of pipes, equipment, fixtures, conduit, ducts, openings, switches, outlets, structural, architectural features and so forth, in order to eliminate any delays in the progress of the job. 2. Any task related to the BMS turnkey installation that is not clearly identified in this document as being the responsibility of another trade shall be the responsibility of the BMS Contractor. 3. Revised Online energy monitoring shall be via Utilivisor, Coordinate and confirm with HUMC Operating Personnel and Utilvisor for all energy usage monitoring requirements. BMS to calculate BTU/KWH for chilled water operational meters (flow, supply and return temperature) for monitoring via Utilivisor.
Files
| File | Type | Posted |
|---|---|---|
| bergen 2026.07.24 BNBMC Bldg 8 CT SPECIFICATIONS IFC.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity