The State of Utah Division of Purchasing, through its Wildlife conducting procurement unit, is soliciting bids under Invitation for Bid BD27-126 for the Cottonwood Fire Chaining Project, with bids due November 24, 2026. No mandatory site visit precedes bidding, though the state strongly recommends that bidders inspect the site.
The contractor removes dead Pinyon Pine and juniper trees and saplings across a minimum of approximately 1,510 acres on City Creek Wildlife Management Area and USFS lands about 5 miles west of Junction, Utah, in western Piute County. The work requires two steel-tracked tractors, each with a minimum drawbar horsepower rating greater than 200, pulling a 240-foot Ely anchor weighing approximately 24,000 pounds, plus mounted seed dribblers that seed the treated area with a state-provided mix. The contractor must also furnish an arc/acetylene welder on site at all times, skilled operators, chain connection devices, warning signs, GPS equipment capable of identifying project boundaries, and an English-literate crew supervisor. The state furnishes the chain, replacement parts, seed dribblers, seed mix, and GIS/GPS treatment maps. The scope of work identifies the agreement as between the Utah Division of Wildlife Resources and the United States Forest Service.
Acreage may extend up to 2,010 acres following cultural surveys, contingent on funding and time. Pricing is a per-acre bid on the minimum acreage, with extension acreage priced separately, and the bid covers labor, equipment, materials, mobilization, and operations with no fuel surcharges or adjustments. Payment is one lump-sum final payment for actual completed acres after final inspection, with partial payments only with prior written approval. The vendor must guarantee pricing through project completion. Minor changes up to 10 percent of the original project area proceed without price adjustment; major changes may be negotiated, with unit price increases capped at the per-acre bid multiplied by 10 percent of remaining untreated acreage.
Performance runs from award through December 20, 2026, with an extended window from January 1, 2027 to March 15, 2027. The state may stop performance at its sole discretion for frozen soil or winter conditions. A single contract award goes to the lowest cost responsive and responsible vendor, and a pre-work conference is held at the project site before work begins. Vendors on the Rangeland Pre-Qualification list must maintain a minimum average performance score of 60 to remain listed, with evaluations weighting quality of product or service and timeliness of performance at 8 each and contract management at 4, for a maximum score of 100.
Opportunity text
Issuing Procurement Unit: State of Utah Division of Purchasing Conducting Procurement Unit: Wildlife The purpose of this IFB is to enter into a contract to provide: Removing dead Pinyon Pine and juniper trees and saplings using two (2) steel tracked tractors with drawbars capable of pulling a 240-foot Ely anchor (Chaining) weighing approximately 24,000 lbs, and vendor must also operate mounted seed dribblers and seed the area with a mix provided by the State. The project area includes a minimum of approximately 1,510 acres and may be extended up to 2,010 acres following cultural surveys. The bid will be per-acre for the minimum acreage, and will be extended up to 2,010 acres contingent on funding and time. Mandatory Site Visit: A site visit will NOT be held prior to bidding. It is strongly recommended that each potential bidder inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.. It is anticipated that this IFB will result in a single contract award to the lowest cost responsive and responsible vendor. Project Performance Time: From time of award until December 20, 2026 Extended performance window: January 1, 2027 to March 15, 2027 Vendor must guarantee its pricing through completion of the project.