3-ATT B Scope of Work BD27-126.pdf
PDF 303 KB Posted
- Attached to
- BD27-126 Cottonwood Fire Chaining Project
- Solicitation number
- BD27-126
- Issued by
- Utah
About this file
This Scope of Work document outlines a contract between the Utah Division of Wildlife Resources (UDWR) and the United States Forest Service (USFS) for wildfire rehabilitation and range improvement services on the Cottonwood Fire Rehab Chaining Project. The project involves removing dead Pinyon Pine and juniper trees and saplings using two steel-tracked tractors with drawbars capable of pulling a 240-foot Ely anchor chain weighing approximately 24,000 pounds, along with operating mounted seed dribblers to seed the treated area with a state-provided seed mix. The project is located approximately 5 miles west of Junction, Utah, in western Piute County on City Creek Wildlife Management Area and USFS Lands, covering a minimum of 1,510 acres with potential extension to 2,010 acres following cultural surveys. The contract will be awarded on a per-acre basis to the lowest responsive and responsible bidder, with a primary performance window from November 15, 2026, to December 20, 2026, and an extended performance window from January 1, 2027, to March 15, 2027. No mandatory site visit is required prior to bidding, though potential bidders are strongly recommended to inspect the site independently. A pre-work conference will be held at the project site prior to work commencement to review specifications, schedules, and administrative provisions.
The contractor must furnish two steel-tracked crawler tractors with a minimum drawbar horsepower rating greater than 200 for each unit, an arc/acetylene welder present at the worksite at all times, skilled operators, connection devices for the chain, warning signs, and GPS equipment capable of identifying project boundaries. The government will furnish the 240-foot Ely chain, replacement parts, two seed dribblers with seed mix, and GIS/GPS maps of treatment areas. Pricing is submitted as a per-acre bid extending across the minimum 1,510 acres, with the total price including all labor, equipment, materials, mobilization, and operating costs, with no fuel surcharges or adjustments permitted. Payment consists of one lump-sum final payment for actual completed acres following final inspection, with partial payment requests considered only with prior written approval. The contractor is responsible for all equipment protection, environmental compliance, hazardous materials management, road restoration, crew supervision with an on-site English-literate supervisor, and maintaining public access throughout the project. Contract performance may be stopped at the state's sole discretion due to frozen soil or winter conditions, with the option to pay and cancel the remaining portion or issue a resumption order. Minor changes up to 10 percent of the original project area may be implemented without price adjustment, while major changes exceeding 10 percent may be negotiated as amendments with potential unit price increases not to exceed a liability cap calculated as the per-acre bid multiplied by 10 percent of remaining untreated acreage.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6/22/2026
ATTACHMENT B SCOPE OF WORK
BD27-126 – Cottonwood Chaining Project
PROJECT: Cottonwood Fire Rehab Chaining Project
LOCATION: 5 miles West of Junction, Utah, in western Piute County.
Introduction: Utah Division of Wildlife Resources (UDWR) and the United States Forest Service (USFS) are acquiring services for wildfire rehabilitation and range improvement by removing dead Pinyon Pine and juniper trees and saplings using two (2) steel tracked tractors with drawbars capable of pulling a 240-foot Ely anchor chain weighing approximately 24,000 lbs. Contractor must also operate mounted seed dribblers and seed the area with a mix provided by the State. The project area includes a minimum of approximately 1,510 acres and may be extended up to 2,010 acres following cultural surveys. The bid will be per-acre for the minimum acreage, and will be extended up to 2,010 acres contingent on funding and time.
SECTION I – PROJECT REQUIREMENTS
SITE SPECIFICS:
Location and Description: The work under this contract is located on the City Creek Wildlife Management Area and USFS Lands approximately 5 miles west of Junction, Utah. Elevations range from 7,000 to 7,800 feet within the project site. Slopes range from flat to 35% with the majority of the project being less than 25%. The treatment site consists of 7 individual units and with some road crossings that will require carefully walking the chain to avoid damaging the road. The majority of the treatment lies within an old chaining that was completed 50+ years ago. The treatment boundaries will not be flagged and must be located by GPS. The work location is shown on the general location and site maps.
Acreage: Minimum of 1,510 acres and up to 2,010 acres:
SPECIFIC TASKS:
Work Limits: Only areas shown on the Project Map will be treated. The project areas are identified with a GPS unit. It will be the contractor’s responsibility to provide a GPS that is capable of loading project areas from a computer.
Government staff will identify unit boundaries for the work executed under the contract. The Contractor shall immediately upon entering the project area, begin work, locate control points, and section corners, and take such action to prevent their destruction.
This project includes the removal of dead, burnt pinyon pine and juniper within the project area as follows:
1. Chaining shall be performed in an organized systematic manner as determined in the pre-work conference.
2. The contractor shall provide skilled operators.
3. Contractor will need to provide enough equipment to complete the work in the specified performance window.
4. The Contractor shall furnish a connection device to attach the chain to each individual crawler tractor.
5. Each site will be chained in one direction, and each pass will cover half of the previous pass.
6. If big piles of slash (i.e. pinyon pine and juniper) accumulate in the chain, the contractor will be required to spread out the big piles or deposit the slash in gullies.
7. Chain shall not be pulled at a speed in excess of 4 mph.
8. The tractors will be operated with a maximum lateral spacing of 100 feet.
9. Chaining passes must be completed swivel to swivel, not track to track.
10. The Government representative has the option of reducing tractor spacing below the minimum specified to accommodate specific terrain or conditions.
11. Pinyon and juniper trees will be left as they lie following the two chaining passes, no piling or windrowing will be required.
12. Any internal roads through the project site must be cleared of all debris left by the chaining operation.
13. The chaining will be done on the contour as much as possible. This is very important for the improvement of the watershed, because chaining on the contour reduces the amount of overland flow during runoff periods (spring melt, summer thunderstorms, etc.).
14. Transport of the chain to the first project site will be the responsibility of the government.
Following the completion of the project, the chain may be left on site near any designated road and coordinated with the project manager. In addition the Contractor will be responsible to return all extra chain parts (i.e. connectors, swivels, clevises, pins, etc.…) to the designated road and coordinated with the project manager.
15. Public or private access roads damaged by the Contractor shall be restored at the Contractors expense to the same condition they were in at the commencement of work.
16. Equipment and vehicles must not be operated or driven outside of the flagged project boundaries except on identified roads or trails.
17. All terrain vehicles may be used within project areas as long as vehicle use does not create a visible trail. All created visible trails and/or ruts will be reclaimed at the expense of the contractor.
18. Chaining shall not occur under conditions that prevent the proper operation of equipment.
Conditions include snow, frozen ground or when the soil exceeds 15% moisture content. When such conditions are encountered, the Contractor shall stop work and notify the Government.
19. Chaining use will be prohibited when soils are wet and rutting (in excess of 10” within sensitive areas) might occur.
20. The Contractor shall periodically lubricate and service the Ely chain swivels (minimum of two times per day). The Contractor shall furnish necessary lubricating equipment and proper lubricants. The Contractor shall check bolts, nuts, etc. on the Ely chain periodically to insure tightness and shall tighten them as necessary for proper maintenance.
21. The Contractor shall be equipped to make necessary field repairs to the Ely chain. An arc-acetylene welder shall be included in the Contractor’s repair equipment. The welder shall be at the work site at all times. The Contractor shall maintain and repair the Ely chain at the worksite. The Government will provide all necessary replacement parts in a timely manner.
22. The Project Inspector will make tests to determine the uniformity of the Chaining operation.
23. Contractor will be required to move chain to an area to be determined by the Project Inspector to provide for efficient pickup of the chain once contract is completed.
24. Contractor shall operate a Government-provided seed dribbler on each tractor and shall use the dribblers to seed the entire chaining area with a seed mix provided by the Government.
GOVERNMENT FURNISHED PROPERTY:
The government will provide the following equipment:
Ely Chain: The Government will provide one 240-foot “Ely” style anchor chain. This chain is made up of one or two center sections of anchor chain. Each link is fitted with a 1-foot section of railroad rail welded perpendicular to the link. Two 30-foot sections of connector chain are located on both ends of the 180-foot “Ely” sections. The chain will be transported by the Government to a starting point in close proximity to the project area. Exact specs for each chain may vary based on available equipment.
As discussed, the Contractor shall furnish a connection device to attach the chain to each individual crawler tractor.
Ely Chain Replacement Parts: The Government will be responsible for providing all necessary replacement parts for the Ely chain. Labor to make repairs will be the responsibility of the contractor.
Two seed dribblers and seed mix will be delivered to the site for the contractor’s use. Contractor shall be responsible for protecting the seed mix from moisture, animals, and theft.
GIS/GPS shapefiles/PDF maps of the treatment areas will be provided to the contractor prior to work beginning.
CONTRACTOR FURNISHED EQUIPMENT:
The Contractor shall furnish the following in a fully-operational basis, with competent, fully-qualified operators, and shall meet the identified specifications:
1. Steel Tracked Crawler Tractors: The tractors shall be of the following type: Two steel tracked tractors with a minimum drawbar horsepower rating greater than 200 for each tractor (D9 or equivalent). Tractors must be capable of pulling the Ely anchor chain at a speed sufficient to roll the chain and prevent litter piling.
2. Welder: An arc/acetylene welder shall be furnished by the Contractor and shall be at the worksite at all times.
3. The contractor shall provide skilled operators.
4. The Contractor shall furnish a connection device to attach the chain to each individual crawler tractor.
5. Contractor shall furnish two (2) warning signs to be placed on roadside prior to entrance of each work area. Signs shall be a minimum of three (3) feet by three (3) feet in dimension and shall warn of the possibility of flying debris.
6. The Contractor shall furnish a connection device to attach the chain to each individual crawler tractor.
7. Equipment shall be free of fluid leaks and be in good operating condition.
8. Equipment shall be washed before entering and exiting federal and state lands. All soil and plant parts shall be removed to prevent the spread of noxious weeds in and out of the project area.
9. Contractor shall also furnish either GPS unit(s) or smartphone(s) with pdf map application to be utilized in identifying project boundaries.
EQUIPMENT AND WORKMANSHIP:
All equipment and/or materials incorporated into the work covered by this contract shall be of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. All work under this contract shall be performed in a skillful and workmanlike manner. The State may require, in writing, that the contractor remove from the work any employee deemed by the State to be incompetent, careless, or otherwise objectionable.
Surface Disturbance: Public or private access roads damaged by the Contractor shall be restored at the Contractors expense to the same condition they were in at the commencement of work. Equipment and vehicles must not be operated or driven outside of identified roads or trails.
CONTRACT TIME
Project Performance Time: November 15, 2026 to December 20, 2026
Extended performance window: January 1, 2027 to March 15, 2027
SECTION II – BID REQUIREMENTS/INFORMATION
SITE VISIT:
A site visit will NOT be held prior to bidding. It is strongly recommended that each potential bidder inspect the site where services are to be performed and satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
MAPS/FILES
Under no circumstances shall the shape/KML files be considered part of the contractual document. They will be provided for informational purposes only. Any .pdf files provided in this bid document, and the actual physical site location shall govern any contractual interpretation or dispute related to this project.
QUESTIONS:
Questions related to this solicitation, specifications, or bidding procedures MUST be asked in writing on the Q&A board within the solicitation to keep the process fair and transparent. There are no exceptions to this.
Questions asked at the site visit and subsequent answers will be recorded and posted in the solicitation so that all potential bidders can review questions and answers.
BIDDING:
This contract will be bid on a per-acre price. The per-acre price will be extended based on the number of acres to show a total project price. The total price shall include all labor, equipment, and materials necessary to complete the job, which includes all mobilization and operating costs. There will be no fuel surcharges or adjustments negotiated.
CONTRACT AWARD:
A contract will be awarded to the lowest responsive/responsible bidder who meets any experience and equipment requirements noted elsewhere in this solicitation.
USE OF SUBCONTRACTORS:
The Project Manager must approve the use of all subcontractors in writing prior to their performance of any work on the project. Any company or individual who submitted a bid on the project, was offered the project as the low bidder, and declined that award, or who defaulted on project after being awarded the contract, is ineligible to be a subcontractor for, or an employee of, the successful bidder.
SECTION III – ADDITIONAL REQUIREMENTS
ENVIRONMENTAL CONSIDERATIONS:
Project sites shall be cleaned up, and all refuse removed by the Contractor. The Contractor shall be responsible for the disposal of materials in a manner consistent with State, Federal, and local laws and for all expenses incurred with the disposal. Public or private access roads damaged by the Contractor shall be restored at the contractor's expense to the same condition they were in at the commencement of work.
Use of 2-wheel and 4-wheel vehicles is permitted in the project areas. Off-road driving will be prohibited when soils are wet and rutting may occur.
Hazardous Materials:
1. Use of Hazardous Materials and/or petroleum products requires that all appropriate State and Federal Regulations be complied with including, but not limited to, Materials Safety Data Sheets (MSDS) on hand and use of necessary Personal Protective Clothing (PPE).
2. On-site disposal of Hazardous Materials or Waste including hydrocarbons is not authorized. On-site disposal will subject the contractor to at least the cost of reclamation and the appropriate disposal of contaminated soil.
3. Incidental (de minimus) leaks from fittings, gaskets, or ruptured hoses will not subject the contractor to remedial requirements. They will be considered to be normal and unavoidable losses.
Continual leaks will be noted on inspection reports and correction through maintenance is required.
4. Maintenance and repair operations that require the draining of engines or hydraulic systems may be conducted on-site only if the fluids are captured, containerized, and removed from public lands for proper disposal.
PUBLIC ACCESS:
Access into and through the project site shall remain open to the public at all times. The Contractor shall maintain roadways free of vehicles, tools, and debris.
SECURITY OF EQUIPMENT AND PROPERTY:
The Contractor may leave equipment at the work site, however, the Contractor shall be solely responsible for the protection of equipment and is solely responsible if the equipment is lost, stolen, or damaged.
CREW SUPERVISION:
1. The contractor shall designate one English-literate supervisor who will be on site during operation hours. Supervisors shall be identified during the pre-work conference. Any changes in supervisory designations must be submitted in writing to the Project manager at least 24 hours before the change takes effect.
2. The person designated by the Contractor, as supervisor must remain with and effectively direct the crew by (1) making periodic inspections of the crew’s work, (2) advising them as to improper work methods,
(3) providing instructions for correcting any improper work methods encountered.
3. Emergency transportation will be provided by the Contractor at all times.
WORK CAMPS:
Work camps may be established only in locations authorized in advance by the Project Manager in coordination with the Government. Should such a camp be authorized, the Contractor shall maintain the camp in an orderly and sanitary manner. Upon vacating a camp and before final payment, the Contractor shall remove all refuse and other signs of occupancy to the satisfaction of the Project Manager.
WORK HOURS:
Work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. Work hours may extend into darkness only when the contractor’s equipment is suitably outfitted with exterior lighting sufficient to allow safe operation; AND only when mutually agreed upon between the contractor and the project manager. Work may be done on Saturday, Sunday, and legal national holidays as mutually agreed between the Contractor and the Project Manager.
WORK SCHEDULE:
The work schedule shall be submitted at the pre-work conference.
DELAYS:
The contractor is expected to complete all contract performance in a timely manner, regardless of the contractor or subcontractor's other workload, including any work being performed under other state contracts. A delay or failure to perform may be considered excusable when the delay or failure arises from causes beyond the control and without the fault or negligence of the Contractor or subcontractor. Examples of these causes are (1) acts of God or of the public enemy, (2) acts of the State in either its sovereign or contractual capacity, (3) fires,
(4) floods, (5) epidemics, (6) quarantine restrictions, (7) strikes, (8) freight embargoes, and (9) unusually severe weather. In each instance, the failure to perform must be beyond the control and without the fault or negligence of the Contractor or subcontractor.
Upon request of the Contractor, the Contracting Officer shall ascertain the facts and extent of the failure. If the Contracting Officer determines that any failure to perform results from one or more of the causes above, the delivery schedule may be revised, subject to the State’s contract termination rights under the contract.
Note: “Unusually severe weather” means weather that is outside the normal weather patterns for a specific area at a specific time of the year. For example, strong wind and snow storms in fall and winter, or strong wind, rain or hail storms in spring and summer are not considered unusually severe. An unusually severe snow, wind or rain storm is one that is worse than even the harshest normal conditions during a season.
PROJECT MEETINGS:
Pre-work Conference:
Location: Meetings shall be held at the project site, or as determined by the Project Manager.
Notification: A pre-work conference will be held prior to the start of work. The Contractor will be notified in advance of the meeting time, date and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the contract.
Attendance: The Contractor, subcontractors and the persons responsible for coordination of the work shall be present at the meeting.
Presentation: The Contractor shall be prepared to summarize and explain procedures planned for each project and present the work schedule requested in the specifications.
Progress Meetings:
Location: Meetings shall be held at the project site, or as determined by the Project Manager.
Notification: Meetings may be called by either the Project Manager or the Contractor. Request shall state who should attend.
FIRE DANGER SEASON:
If the Project Manager allows the Contractor to continue work during the periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the Project Manager
PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA:
The Contractor agrees that should he or any of his employees in the performance of this contract discover evidence of possible scientific, pre-historical, historical, or archeological data he will notify the Project Manager immediately giving the location and nature of the findings.
Where appropriate by reason of discovery, the Project Manager may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted.
The Contractor agrees to insert this paragraph in all subcontracts, which involve the performance of work on the terrain of the site.
PROTECTION OF CULTURAL RESOURCES:
Location of known historic or prehistoric sites, buildings, objects, and properties related to American history, architecture, archaeology, and culture, such as settler or Indian artifacts, protected by American Antiquities Act of 1906 (16 U.S.C. 431-433), National Historic Preservation Act of 1966 (16 U.S.C. 470) and the Archaeological Resources Protection Act of 1979 (16 U.S.C. 470aa-ll) (36 CFR 296.4 and 36 CFR 261.9(g)), shall be identified on the ground by the Government. The Government may unilaterally modify or cancel this contract to protect an area, object of antiquity, artifact, or similar object that is or may be entitled to protection under these Acts regardless of when the area, object, or artifact is discovered or identified. Discovery of such areas by either party shall be promptly reported to the other party and operations will be suspended at that location until the significance or potential significance of the site is determined.
The contractor shall protect all known and identified historic or prehistoric sites, buildings, objects, and properties related to American history, architecture, archaeology, and culture against destruction, obliteration, removal, or damage during the Contractor's operations. The contractor shall immediately notify the Government if disturbance occurs to any known site, and shall immediately halt operations in the vicinity of the site until the Government authorizes the Contractor to proceed. The contractor shall bear costs of evaluation and restoration in accordance with 36 CFR 296.14(c), provided that such payment shall not relieve the Contractor from civil or criminal remedies otherwise provided by law.
NOTICE TO PROCEED:
Unless notified by the project manager that notice-to-proceed will be delayed, receipt of the contract or purchase order by email shall constitute a Notice to Proceed. The Project Manager may issue a separate delayed notice-to-proceed for any reason including adverse soil, vegetative, climatologic, or other environmental conditions.
CONTRACT PERFORMANCE:
The Contractor shall begin work within seven (7) calendar days from the effective date of the notice to proceed.
The Contractor shall continue the performance of the work under the contract without delay or interruption except by causes beyond his control identified in the Delays clause. While an extended performance window is provided in this statement of work, this extended window is designed for contractors who may have multiple contracts to complete for the State of Utah at the same time as this contract. The extended performance window is not to be construed as a full performance time window just for this project unless approved in advance in writing by the State’s project manager. Once the contractor is on site working, the contractor shall work diligently and complete all work within the project performance time in the Contract Time clause below.
It is the contractor’s sole responsibility to complete contract performance regardless of the contractor’s current workload, including other state contracts. If necessary, the contractor will be expected to take whatever means are necessary to ensure timely contract performance. At the discretion of the contractor, this may include sub-contracting, additional equipment/manpower, and/or any other necessary action. Any necessary action taken by the contractor to ensure timely completion shall be at no additional expense to the State of Utah beyond the original contract price.
INSPECTION:
Surveillance Plan: The Government will inspect completed acres and provide recommendations to improve work quality while work is in progress. The Contractor is responsible for providing quality control to ensure that work complies with the contract specifications.
Final Inspection:
Location: Meeting shall be held at the project sites, or as determined by the Project Manager.
Notification: The Contractor shall notify the Project Manager at least three (3) working days before the completion date so the Government can schedule the final inspection.
Deficiencies: The Contractor shall correct deficiencies and project areas will be re-inspected by the Project Manager.
ACCEPTANCE:
Based on inspection results, if the quality level falls below contract specifications, the Project Manager will immediately notify the Contractor in writing and instruct the Contractor to improve the quality of work. If the quality of the work is not raised to an acceptable level after written notification, the Project Manager may issue a suspension work order to resolve the problem, during which time contract time will continue to run.
If untreated or unsatisfactorily treated areas are the primary reason for unsatisfactory work, the Contractor shall rework acres designated by the Government until satisfactory work quality is obtained.
PAYMENT:
One lump-sum final payment will be made for the actual number of acres completed following a final inspection of the completed project, and consistent with the payment clause in the State’s standard terms and conditions.
Normally, requests for partial payments will not be considered. However, if a partial payment request is considered, approval of said request shall be at the total discretion of the State. The contractor must get a partial payment request approved in writing before submitting an invoice for partial payment. Partial payment invoices received without prior approval will be returned to the contractor as not proper for payment.
WINTER STOPPAGE:
At the sole discretion of the State and or the Federal Partner this contract may be stopped at any time due to frozen soil or other winter conditions. Once the contract work is stopped for winter, the state may pay the contractor and cancel the remaining portion of the contract, or issue a resumption of work order when spring weather permits. The contractor must proceed diligently with all work as weather permits until a stop-work order is issued.
CHANGE ORDERS:
Minor Change Order. If the State determines that a change in the Scope of Work is necessary, they may modify acreage totals or parcel configuration by up to 10% of the originally proposed Project Area by providing written notice to the Contractor (“Minor Change Order”). Issuance of a Minor Change Order does not excuse the Contractor from their obligation to perform the work under their original per-acre bid price, nor does it excuse the State from paying Contractor for work completed to project specifications. Changes in acreage or parcel configuration will add or exchange work areas with characteristics similar to those in the original Project Area.
When possible, a Minor Change Order should be implemented so as to leave a consolidated and contiguous project area having similar access to that originally described in the Scope of Work.
Major Change Order. If the State determines that a change in the Scope of Work is necessary, and that change does not qualify as a Minor Change Order, the State and the Contractor may negotiate a Major Change Order as an amendment to the original contract. Examples of Major Change Orders include: (1) a reduction or cancellation of acreage that is greater than 10% of the original Project Area or (2) a change in the Project Area such that the new project characteristics are not comparable to those described in the original Scope of Work.
Major Change Orders may authorize an increase in the unit price of per-acre bid submitted by the Contractor, payment of part or all of equipment mobilization costs incurred by the Contractor, or a combination of both.
Any Major Change Order shall be supported by documentation supporting the equitable adjustment in contract terms and is subject to approval by the State of Utah Division of Purchasing.
Change Order Limitations. The sum of all payments made under one or more Change Orders on a single contract may not exceed the liability cap for the contract, calculated by identifying the per-acre bid price, and multiplying that figure by 10% of the acreage within the Project Area that remains untreated. For example, the maximum payment authorized under a Major Change Order would be calculated as follows:
$50 per acre bid price x (10% of 500 acres left untreated) = $2,500 Maximum or $250 per acre bid price x (10% of 1250 acres left untreated) = $31,250 Maximum
Nothing in this Section relieves the Contractor from their obligation to perform as described in Section 1, unless the State determines that a change order is appropriate. Under no circumstances may a Change Order exceed the total approved contract price. In most cases, the actual Change Order amount will be substantially less than the maximum liability cap for the contract. Nothing herein shall be construed as eliminating or modifying a Contractor’s obligation to mitigate damages they may incur due to the circumstances necessitating a Major Change Order, or the State’s right to terminate an Agreement in lieu of issuing a Change Order.
| SECTION I – PROJECT REQUIREMENTS |
| SPECIFIC TASKS: |
| GOVERNMENT FURNISHED PROPERTY: |
| CONTRACTOR FURNISHED EQUIPMENT: |
| EQUIPMENT AND WORKMANSHIP: |
| SECTION II – BID REQUIREMENTS/INFORMATION |
| SITE VISIT: |
| MAPS/FILES |
| QUESTIONS: |
| BIDDING: |
| CONTRACT AWARD: |
| USE OF SUBCONTRACTORS: |
| SECTION III – ADDITIONAL REQUIREMENTS |
| ENVIRONMENTAL CONSIDERATIONS: |
| PUBLIC ACCESS: |
| SECURITY OF EQUIPMENT AND PROPERTY: |
| CREW SUPERVISION: |
| WORK CAMPS: |
| WORK HOURS: |
| WORK SCHEDULE: |
| DELAYS: |
| PROJECT MEETINGS: |
| Progress Meetings: |
| FIRE DANGER SEASON: |
| PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA: |
| PROTECTION OF CULTURAL RESOURCES: |
| NOTICE TO PROCEED: |
| CONTRACT PERFORMANCE: |
| INSPECTION: |
| ACCEPTANCE: |
| PAYMENT: |
| CHANGE ORDERS: |
File details come from the government source that posted it. Updated .