Artificial Intelligence Center of Excellence
Closed State & local contract opportunity
- Solicitation number
- RFP01-CIO-25-229
- State
- Texas
- Responses due
Opportunity facts
- NIGP codes
- 20617 Chips: Accelerator, Graphics, Math Co-Processor, Memory (Ram And Rom), Network, Etc.
- 20623 Communication Processors And Protocol Converters: Front-End Processor, Network Interface Module, Protocol Interchange, Switching Controls, Etc.
- 20632 Controllers, Local And Remote
- 20646 Drives: Hard/Fixed Disk
- 20664 Network Components: Adapter Cards, Bridges, Connectors, Expansion Modules/Ports, Hubs, Line Drivers, Msaus, Routers, Transceivers, Etc.
- 20938 Database Software
- 20987 Software, Mini/Mainframe Computer (Not Otherwise Classified)
- 92031 Installation Of Computers, Peripherals, And Related Equipment (Including Software)
- 92037 Networking Services (Including Installation, Security, And Maintenance)
- UNSPSC codes
- 45111807 Interfaces
- 81161502 Network Account Administration Service
- 32101622 Flash memory
- 43201501 Asynchronous transfer mode ATM telecommunications interface cards
- 43201533 Musical instrument digital interface MIDI interfaces
- 43201540 Channel converter
- 43201544 Interface bus converter or controller
- 43201549 Interface bus switches
- 43201550 Network packet data synchronization device
- 81111803 Local area network LAN maintenance or support
Show all 27
- 81111804 Wide area network WAN maintenance or support
- 32101624 Synchronous graphic random access memory SGRAM
- 43201500 System boards processors interfaces or modules
- 43201534 Exchange component CODEC interfaces
- 43201541 Channel to channel interface mainframe
- 81111508 Application implementation services
- 81111809 System installation service
- 81111706 Network planning services
- 81111801 Computer or network or internet security
- 81161503 Network folder administration service
- 32101623 Rambus dynamic random access memory RDRAM
- 43201546 Audio conferencing boards
- 41113718 Protocol analyzers
- 44102607 Word processors
- 81111701 Wide area network communications design
- 81111702 Local area network communications design
- 81111707 Systems planning services
Opportunity details come from txsmartbuy.com. Updated .
About this opportunity
The Texas A&M University System is seeking qualified vendors to collaborate on the design, development, and implementation of an Artificial Intelligence (AI) Center of Excellence through a Request for Proposal (RFP) for an NVIDIA DGX SuperPOD solution. The procurement offers two configuration options: a 3-node system with 760 H200 GPUs or a 4-node system with 1,016 H200 GPUs, accompanied by high-speed networking infrastructure and 8PB of usable storage capacity. Vendors must provide comprehensive project management, site preparation, infrastructure assessment, hardware installation, network integration, technical assistance, user training, and documentation support. The system must be capable of running specific AI models like Grok-1 and Llama 3.1 405B and support both Kubernetes and Slurm scheduling. Proposals are due December 27, 2024, at 2:00 PM Central Time, with implementation expected to begin in June 2025 and last 9-12 months. Evaluation criteria will include demonstrated competence, knowledge, qualifications, implementation timeline, and cost reasonableness. Technical requirements mandate compliance with Texas A&M Information Security Controls Catalog based on NIST standards and integration capabilities with cloud services from AWS, Azure, GCP, and OCI.
The RFP includes a 15% Historically Underutilized Business (HUB) participation goal for subcontracting opportunities, encouraging diversity in vendor selection. Only NVIDIA products will be accepted, with DDN storage alternatives potentially considered. Vendors must maintain specific insurance coverages, including worker's compensation, automobile liability ($1M), commercial general liability ($1M/$2M), and cyber liability ($2M). The project provides 30 NVIDIA Deep Learning Institute training credits and requires TX-RAMP cloud computing certification. The data center infrastructure features 6MW power availability with current rack power limited to 35kW and 14 24-ton CRACs for cooling. While no specific incumbent vendors are mentioned, the infrastructure must have a minimum useful life of 5-7 years and be delivered to Texas A&M University in College Station. Although a precise budget is not explicitly stated, the comprehensive hardware requirements, including 95-127 DGX H200 systems, extensive networking equipment, and advanced storage solutions, suggest a multi-million dollar investment in cutting-edge AI infrastructure.
Files
Show all 13
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity