About this opportunity

The City of Phoenix Office of the City Engineer is soliciting statements of qualifications for Construction Manager at Risk services on the Arizona Science Center stormwater and sewer pipe replacement, with a mandatory pre-submittal meeting at 11:00 a.m. on December 1, 2026 and qualifications due by 12:00 p.m. on December 11, 2026. SBE participation is a central eligibility and scoring factor: SBE subcontracting goals will be established before construction based on SBE subcontractor availability, and only firms with physical business locations within Maricopa County are eligible to meet those goals. SBE firms must perform at least 75 percent of their contract work with their own workforce to satisfy commercially useful function requirements and must hold current City of Phoenix certification.

The scope covers preconstruction services, including cost estimating, constructability reviews, value engineering, long-lead procurement studies, permitting assistance, and SBE participation coordination, followed by construction services through closeout. Construction services include two Guaranteed Maximum Price proposals, subcontractor management, and 24-hour emergency response. The work replaces and remediates all existing drain, waste, vent, and storm drainage systems serving the Arizona Science Center at 600 E. Washington Street, with an estimated construction cost of $8.2 million. Firms must hold appropriate Arizona contractor licenses, be registered in the City's Vendor Management System before submittal, and provide a current Experience Modification Rate, a bonding capacity statement from an A- rated or better surety, and three project references. Reference check forms go to soq.referencechecks@phoenix.gov by the same deadline. The first three submitted are evaluated, with up to 7 points each, and missing or late forms negatively affect proposal evaluation.

Evaluation is qualifications-based across 1,021 points: General Information (150), Experience and Qualifications of the Firm (250), Experience of Key Personnel (250), Understanding of the Project and Approach (350), and Reference Checks (21). Statements of qualifications are capped at 12 pages and submitted through the City's Procurement Portal at https://procurement.opengov.com/portal/phoenix. Selection notification is anticipated for mid-January 2027, with a scope meeting at the end of January 2027. Where competitive subcontractor bidding is used, the selected firm must submit at least three qualified subcontractors per trade unless the City approves fewer, and the City approves all subcontractor selections.

Opportunity text

The City of Phoenix is requesting qualifications for ARIZONA SCIENCE CENTER STORMWATER AND SEWER PIPE REPLACEMENT CONSTRUCTION MANAGER AT RISK SERVICES. Qualifications are to be submitted via the City's Procurement Portal at https://procurement.opengov.com/portal/phoenix before 12:00 pm on Friday, December 11, 2026.