SBE_Letter_of_Intent_Form_PW26740069.pdf
PDF 546 KB Posted
- Attached to
- ARIZONA SCIENCE CENTER STORMWATER AND SEWER PIPE REPLACEMENT CONSTRUCTION MANAGER AT RISK SERVICES
- Solicitation number
- PW26740069
- Issued by
- Maricopa County, Phoenix City, Arizona
About this file
This is a City of Phoenix Small Business Enterprise (SBE) Program Letter of Intent form for subcontractor participation on the Arizona Science Center Stormwater and Sewer Pipe Replacement Construction Manager at Risk Services project (Project Number PW26740069). The form documents an SBE subcontractor's commitment to perform specific scopes of work under a prime contractor if selected for award. The SBE subcontractor must identify their City of Phoenix SBE certification area(s) and detail the work scopes they will perform, with pricing provided either by unit/hourly rate or as a lump sum for general or specialty construction trades. The form requires completion by both the SBE subcontractor and prime contractor, with authorized signatures from each party affirming the accuracy and commitment to the stated work and pricing. Qualifications for the overall contract opportunity must be submitted through the City's Procurement Portal before 12:00 pm on Friday, December 11, 2026.
The LOI form establishes mechanisms for tracking and reporting SBE participation, requiring identification of any work scopes or amounts that will not be performed by the SBE or fall outside their certification description. For trucking services, the form specifies that only the amount performed by the SBE's own employed drivers and owned or leased trucks (without drivers) qualifies toward SBE utilization goals. For broker or traffic control/security services, the SBE must report their fee or commission percentage and total amount. Only the qualifying amounts are reflected in the Bidder's Statement of Proposed Utilization for compliance purposes. The form emphasizes that the prime contractor may not alter or modify the document except for entering unit/hours and total quote amounts in designated sections.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Phoenix
Small Business Enterprise Program
Letter of Intent (LOI) To Perform as an SBE Subcontractor (THIS FORM MUST BE COMPLETED BY THE SBE SUBCONTRACTOR-BOTH SBE SUBCONTRACTOR & PRIME SIGNATURE ARE REQUIRED)
Project Description: AZ SCIENCE CENTER
(STORMWATER PIPE REPLACEMENT) CONSTRUCTION
MANAGER AT RISK SERVICES
Project Number: PW26740069 Contract#:
TO: _______________________ (Insert Name of Prime Contractor)
FROM: ____________________ (Insert Name of SBE Firm) A. The undersigned declares that the firm bidding to perform the work described herein, has been granted certification by the City of Phoenix (COP) as a Small Business Enterprise (SBE) in the area(s) of:
(COP) Certification Description:
B. The undersigned is bidding to perform the following scope(s) of work on the above referenced project:
SECTION 1 - COMPLETE THIS PORTION IF THE SCOPE OF WORK IS BEING BID BY UNIT PRICE OR HOURLY RATE
SUPPLIER, BROKER, TRUCKING, HAULING, UNIFORMED OFFICERS MUST USE THIS SECTION
Scope of Work Unit/Hourly Rate # of Units/Hours Total Quote Amount
SECTION 2 - GENERAL OR SPECIAL TY CONSTRUCTION TRADE AREAS MUST USE THIS SECTION
Scope of Work Total Quote Amount
C. Of the Total Quote Amount reflected in Part B-SECTION 2, the following scope(s) of work with the given amount will not be performed by the SBE or is/are not covered under the SBE's certification description:
Scope(s) of Work __________________ Amount$ ______ _
Subtract Amount in Part C above from the Total Quote Amount in Part B-Section 2 =* $
* Only this amount shall be reflected on the Bidder's Statement of Proposed Utilization.
D. If trucking services are included in Part B - SECTION 1 above, SBE MUST complete the following:
Of the Total Quote Amount noted in part B-Section 1, the SBE affirms that the amount of*$ __________ _ shall be performed by drivers the firm employs, and trucks the SBE owns and leases without drivers.
(The amount referenced above is transferred from Step 9 of the Worksheet (L.0./. W.-1). *Only this amount shall be on the Statement of Proposed Utilization)
E. All subcontractors providing Broker or Traffic Control/Security Services indicated in Part B-SECTION 1 above
MUST Com lete the Followin
Rate of the SBE's fees/commissions ___ %; for a Total Amount in fees/commissions of:$ _________ _ The Percentage and Total Amount referenced above is transferred from Steps 2 and 3 of the Worksheet (page L.0.I. W.-1).
Only the Total Amt in fee/commissions shall be reflected on the Bidders Statement of Proposed Utilization.
Should the prime contractor receiving this form be selected for award of the contract, the undersigned affirms that he/she will enter into an agreement to perform the work bid herein.
(SBE Subcontractor Authorized Signature) (Date)
(Print Name and Title) (Phone Number)
By signing this LOI document, the Prime Contractor affirms that it has not altered or modified this document in any way other than, if applicable, entering the Unit/Hours and Total Quote Amount in Part B SECTION 1.
(Prime Contractor Authorized Signature) (Date)
File details come from the government source that posted it. Updated .