Annual Roadway Striping and Pavement Marking Services

Closed State & local contract opportunity Posted

Solicitation number
25/26-104
State
Florida
Responses due

Opportunity facts

Jurisdictions
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Clay County, Florida is soliciting annual roadway striping and pavement marking services, with proposals due September 24, 2026.

The scope encompasses traffic stripes and markings using two application methods — thermoplastic material per Florida Department of Transportation Standard Specifications Section 711, or paint per Section 710 — plus removal of existing markings via water blasting (preferred) or grinding, installation of Raised Pavement Markers (RPMs) with adhesive, and retroreflectivity testing per the Florida Method of Test. All work must comply with the latest editions of the Florida Department of Transportation Standard Specifications for Road and Bridge Construction, Florida Department of Transportation Design Standards, and the Federal Highway Administration Manual on Uniform Traffic Control Devices in effect at the time each task order or purchase order is issued. RPMs must remain in place for a minimum of 30 days; the contractor bears the cost of replacing any failed markers.

The source document does not specify estimated contract value, contract term, incumbent contractor, set-asides or preference programs, evaluation criteria, or additional procurement timeline milestones such as pre-bid meeting dates or question deadlines. The complete RFP or IFB documentation, which typically contains pricing terms, quantities, award schedule, and renewal options, was not provided.

Opportunity text

A. Traffic Stripes and Markings

1. Method 1 Thermoplastic Material:

a. All Work shall be performed in accordance with the requirements of latest edition, at the time the applicable Task Order and/or Purchase Order is issued to the Contractor, of the following manuals and publications, including, but not limited to, Section 711 from the Florida Department of Transportation Standard Specifications for Road and Bridge Construction, the latest edition and supplement, and any other section applicable and the Florida Department of Transportation Design Standards and the Federal Highway Administration Manual on Uniform Traffic Control Devices. These standards shall be used for all thermoplastic pavement markings.

2. Method 2 Paint:

a. All Work shall be performed in accordance with the requirements of the latest edition in effect at the time the applicable Task Order and/or Purchase Order is issued to the Contractor of the following manuals and publications, including, but not limited to: Section 710 from the Florida Department of Transportation Standard Specifications for Road and Bridge Construction, the latest edition and supplement and any other applicable section, Florida Department of Transportation Design Standards, and the Federal Highway Administration Manual on Uniform Traffic Control Devices.

B. Removal of Markings

1. Preferred Method Water Blasting, Secondary Method Grinding

C. Raised Pavement Markers

1. Place Raised Pavement Markers (RPMs) and adhesive, which upon installation produces a positive guidance system to supplement other reflective pavement markings in accordance with Florida Department of Transportation Standard Specifications for Road and Bridge Construction, current edition and applicable section. Raised Pavement Markers (RPMs) must stay in place for 30 days. Any Raised Pavement Markers (RPMs) that do not stay in place must be replaced by the contractor at their expense.

D. Retroreflectivity 1. Clay County may use the Florida Method of Test for FIELD EVALUATION of TRAFFIC MARKING MATERIALS Designation: 5-541 and/or Florida Method FM195-579 or the latest method at the time the applicable Task Order and/or Purchase Order is issued to the contractor to test for retro reflectivity. The County also reserves the right to test the completed road using a Pavement Marking retroreflectometer.

E. Hand Liners

1. Hand lining/striping/marking shall be used only for transverse pavement markings and taper of gore sections of pavement striping and markings. Hand lining/striping/marking shall not be used for long line pavement stripes longer than two hundred feet unless the stripes are part of a taper or gore area or intersection lane line that cannot be installed with a truck mounted applicator.

F. Long Line Work

1. Must have a truck mounted applicator and be capable of two (2) or more miles of continuous striping.

G. Ground-In Rumble Stripes

1. All work shall be performed in accordance with the requirements of latest edition at the time the applicable Task Order and/or Purchase Order is issued to the contractor of the following manuals and publications, including, but not limited to: Section 546 subsection 546-3.3 Ground-In Rumble Stripes (see FDOT Indexes 546-010 and 456- 020) from the Florida Department of Transportation Standard Specifications for Road and Bridge Construction, the latest edition and supplement and any other applicable section, Florida Department of Transportation Design Standards, and the Federal Highway Administration Manual of Uniform Traffic Control Devices.

Files