Agricultural Center - Low Voltage Data Cabling RFP
Closed State & local contract opportunity Posted
- Solicitation number
- PE-55127-NONST-2025-000000005
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 28029 Communications/Telecommunications Cable And Wire
- 83826 Cabinets For Data, Frames, Runway, Cable Management, Raceway, Wire Mesh Or Basket Tray, Interduct (Telecom Closets)
- 83828 Cable, Copper (Cat. 5E 6 Etc) Including Interconnecting Components And Accessories (See Class 280 For Other Communications Cable)
- 83829 Cable, Fiber Optic W/Interconnecting Components And Accessories (See Class 280 For Other Communications Cable
- 83896 Wire And Cable, Telecommunication (Not Otherwise Specified)
- 91429 Communication Systems, Including Infrastructure
- 95115 Infrastructure & Infrastructure Improvements
- UNSPSC codes
- 26121507 Radio or television wire
- 26121608 Aerial cable
- 26121609 Network cable
- 26121616 Telecommunications cable
- 26121623 Radio frequency RF cable
- 26121632 Outside plant communications cable
- 26121633 Outside plant telecommunications cable
- 26121666 Communication cable assembly
- 26121667 Backplane input output cable
- 72151521 Electric instrumentation communication cable service
Show all 33
- 26121637 Outdoor fiber optics cable
- 26121650 Fiber optic cable assembly
- 26121655 Simplex and duplex fiber optic cable
- 26121656 Submarine fiber optic cable
- 26121657 Flame retardant fiber optic cable
- 41113716 Fiber optic fault locators
- 41113717 Fiber optic test sources
- 43223310 Fiber optic connector
- 43223311 Fiber optic attenuator
- 43223318 Fiber optic emitter
- 43223321 Fiber optic connector clip
- 43223322 Fiber optic support grip
- 43223323 Fiber optic adapter
- 43223326 Fiber optic patch cord
- 43223335 Fiber optic music wire
- 43223336 Fiber optic scope adapter
- 43223337 Fiber optic enclosure
- 43223338 Fiber optic connection closure
- 43223339 Fiber optic distribution box
- 43223340 Fiber optic fusion splicer
- 43223341 Combiner
- 43223342 Waveguide and connection kit
- 43223343 Network punchdown tool
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
Madison County Schools in the state of Georgia is issuing a request for proposals (RFP) for a structured cabling system for their new Agricultural Center project located in Laurens County. The scope of work includes the installation of 35 access point drops, 47 camera drops, and 30 data drops for a total of 118 drops, as well as two fiber runs between data closets. One 24-strand single-mode fiber run will be installed from the existing district main distribution frame (MDF) to the new Agricultural Center, with enough capacity for the Agricultural Center and two additional planned structures. The RFP seeks a vendor(s) to provide a high-quality, cost-effective cabling solution and requires respondents to provide detailed pricing terms and information. Site visits for prospective bidders are scheduled, and proposals are due on September 11, 2024 at 1:00 PM EST. The school system will evaluate proposals based on factors such as price, qualifications, prior experience, project management capability, and references.
The RFP does not mention any set-asides or restrictions on the types of organizations that can respond. It also does not provide details on any incumbent vendors or current contractors, nor does it specify a budget range or award values. The RFP states the intent is to contract with a vendor(s) to provide the required structured cabling system, but it does not provide additional information on funding requirements or sources for this project.
Opportunity text
It is the intention of Madison County Schools to contract with a vendor(s) to provide a high quality, cost- effective structured cabling system for this project. Please refer to EXHIBIT A (separate document) for drop and IDF locations. Included in this project are 35 access point drops, 47 camera drops, and 30 data drops for 118 total. There are also two fiber runs between data closets. There is one fiber run (24 strands) from the existing district MDF (800 Madison Street) to the new Agricultural Center. The fiber run will have enough capacity for the Agricultural Center PLUS two additional planned structures.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity