Fiber Clarification August 30.pdf

PDF 12 KB Posted

Attached to
Agricultural Center - Low Voltage Data Cabling RFP
Solicitation number
PE-55127-NONST-2025-000000005
Issued by
Laurens County, Georgia

About this file

This document is a clarification related to a fiber optic cabling project for the Agricultural Center being constructed by Madison County Schools in Georgia. The scope of work calls for a 24-strand fiber run from the existing MDF at the Board of Education office to the new Agricultural Center, with an approximate length of 650 feet. The general contractor will provide the conduit from the Agricultural Center to the road, and the low voltage/fiber contractor will provide the conduit from the existing MDF, under the road, to the conduit provided by the general contractor.

The related State and Local Contract Opportunity is an RFP for the low voltage data cabling at the Agricultural Center project. This includes 35 access point drops, 47 camera drops, and 30 data drops for a total of 118 drops. There are also two fiber runs between data closets, including the 24-strand fiber run from the district MDF to the Agricultural Center, which will have enough capacity for the Agricultural Center and two additional planned structures.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fiber to the Ag Building - Clarification 8/30/2024

The posted scope of work calls for (1) 24-strand fiber run from the MDF in the BOE office to the new Ag facility with an approximate length of 650'.

The general contractor will provide the conduit from the Ag Building to the road.

The LV/fiber contractor will provide the conduit from the existing MDF, under the road, to the conduit provided by the GC.