Additions to MUD creek water pollution control plant
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66249-NONST-2026-000000095
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 72153101 Bowling alley installation service
- 95121513 Bank
- 95121610 Tramway platform
- 95121642 Sewage pumping station
- 72121505 Waste water and sewage treatment plant construction service
- 95121510 Garden
- 95121708 Lifeboat station
- 95121707 Mountain rescue building
- 72141123 Manhole construction service
- 95121811 Aquaduct or other water supply conduit, except pipeline
Show all 35
- 72121407 Mausoleum construction service
- 72121404 Post office construction service
- 72121301 Automotive garage construction service
- 95121809 Movable weir
- 95121812 Floating structure
- 95121512 Waterside leisure facility
- 95121808 Oil or gas platform
- 95121609 Tramway depot
- 95121709 Coastguard building
- 95121810 Irrigation and flood control waterworks
- 72121300 Automotive garage and service station construction services
- 72121400 Specialized public building construction services
- 72111004 Patio and deck construction and repair service
- 72121302 Automotive service station construction service
- 95121502 Parking structure
- 95121710 Rescue service station
- 95121517 Crematorium
- 72103305 Drain laying service
- 72141120 Sewer line construction service
- 95121643 Sewage outfall
- 72121504 Waste disposal plant construction service
- 72141121 Water main construction service
- 72141125 Pumping station construction service
- 95121805 Well
- 95121804 Water tower
- Point of contact
-
- Stephanie Jones sjones@turnipseed.com (706) 863-8800
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Valdosta, Georgia is soliciting competitive bids for construction improvements to the Mud Creek Water Pollution Control Plant located in Liberty County. The project scope encompasses drain valve replacement, septage receiving station installation, influent pump station bypass construction, dewatered sludge conveyor system implementation, and all associated appurtenances and mechanical equipment, along with electrical work, painting, SCADA systems, and miscellaneous metals fabrication and installation. Bidders must submit sealed bids to the Engineering Department at 300 N Lee Street, Valdosta, Georgia 31601 with a deadline of Friday, May 26, 2026 at 11:00 AM local time, after which all received bids will be publicly opened and read. The project timeline includes 365 days for substantial completion and 395 days for final completion. Bidding documents are available for purchase and electronic download from https://turnipseed.com/current-projects/out-for-bid/ for $250, and prospective bidders are required to register as plan holders on the designated website to receive periodic updates on addenda and relevant information. Bidding documents may also be obtained or examined at the Issuing Office, Turnipseed Engineers, located at 4210 Columbia Road, Building 3, Augusta, Georgia 30907, during regular business hours of 8:00 a.m. to 5:00 p.m., Monday through Friday. All official notifications, addenda, and bidding documents will be provided exclusively through the designated website, and interested parties should reference the Instructions to Bidders contained within the bidding documents for complete requirements regarding bid submittal, qualifications, procedures, and contract award.
The procurement documents do not specify set-aside designations, disadvantaged enterprise restrictions, or organizational eligibility limitations. No incumbent vendors, current contractors, or existing contractual relationships are identified in the available documentation. The contract does not reference specific infrastructure or technology integration requirements beyond the SCADA systems and miscellaneous metals fabrication outlined in the project scope. The solicitation documents provided do not disclose the project budget, contract award value, or estimated cost range. Interested bidders should contact the City of Valdosta Engineering Department or Turnipseed Engineers directly for additional information regarding evaluation criteria, specific technical qualifications required, and any other contractual details not contained in the advertisement for bids.
Opportunity text
Improvements to the Mud Creek Water Pollution Control Plant including drain valve replacement, septage receiving station, influent pump station bypass, dewatered sludge conveyor system and all appurtenances and mechanical equipment. To include electrical, painting, SCADA and miscellaneous metals, fabrication and installation
Files
| File | Type | Posted |
|---|---|---|
| Additions to Mud Creek Water Pollution Contro.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity