AC Units for the Green at 38th
Closed State & local contract opportunity
- Solicitation number
- 26-48
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 03102 Air Conditioning Units, Portable (For Computer Rooms, Hospital Rooms, Sporting Events, Etc.)
- 03104 Air Conditioners: Controlled Environment (For Computer Rooms, Etc.), And Parts And Accessories Not Individually Itemized)
- 03106 Air Conditioning And Heating: Central Units, And Parts And Accessories Not Individually Itemized
- 03118 Coil And Fan Units, Air Conditioning
- 55705 Air Conditioning, Heating And Ventilation
- UNSPSC codes
- Point of contact
-
- Whitney Mugford-Smith wmsmith@wheatridge.gov (720) 517-9337
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Wheat Ridge, Colorado is requesting proposals for the purchase and installation of mini-split air conditioning units at the Green at 38th, a public gathering space that opened in August 2025, with responses due October 2, 2026 at 2:00 p.m.
The scope covers site assessment, complete installation of climate control equipment in a storage building at 7101 W. 38th Avenue to preserve electronics and stored materials, including unit mounting, electrical connections, refrigerant piping, condensate drainage, and building system integration. The vendor must also provide initial testing and commissioning, training for City personnel, and comprehensive documentation including operation manuals, warranty information, and commissioning reports. Materials must be delivered within 30 days of contract award and are subject to inspection upon delivery.
Proposers must submit lump-sum and itemized quotes with all freight and delivery costs included, excluding sales and use tax (the City holds a sales tax exemption certificate). All prices must remain firm for one year following acceptance, with future escalation requests limited to one adjustment per contract term and capped at 3 percent of the original contract value.
Required insurance includes Workers Compensation with statutory limits, Commercial General Liability at $1 million per occurrence and $2 million general aggregate, Builder's Risk insurance for 100 percent of replacement value, Commercial Automobile Liability at $1 million per accident, and Professional Liability/Errors and Omissions at $1 million each. Proposers must provide proof of insurance for not less than $1 million and at minimum three references from similar projects completed within the past five years.
The City evaluates proposals on best value rather than lowest price alone and reserves the right to make multiple awards, reject any or all proposals, and waive minor defects. Proposers must comply with Colorado's Keep Jobs in Colorado Act requiring 80 percent Colorado labor and cannot be debarred per sam.gov listings. No proposals may be withdrawn for 60 calendar days following the proposal opening date.
Opportunity text
The City of Wheat Ridge began public engagement in 2018 to transform the area between Stevens Elementary and 38th Avenue into a public gathering space. After engagement concluded in 2021, design concepts were approved in 2022. Construction began in summer 2024, with the parking lot completed ahead of the 2024-2025 school year and park construction starting immediately after. The Green at 38th officially opened in August 2025. The City of Wheat Ridge is seeking to purchase and install air conditioning units in the building located at the Green at 38th.