751/24434. JBB; Au Train River Bridge Superstructure Removal
Closed State & local contract opportunity Posted
- Solicitation number
- RFQ-171-250000000369-3
- State
- Michigan
- Responses due
Opportunity facts
- Jurisdiction
- UNSPSC codes
- 72121004 Paper or pulp mill construction and remodeling service
- 72121501 Chemical plant construction service
- 95122402 Cold storage installation
- 95121600 Transport buildings and structures
- 72121007 Truck and automobile assembly plant constructionand remodeling service
- 72121002 Food product manufacturing or packing plant construction and remodeling service
- 72121008 Warehouse construction and remodeling service
- 95122400 Industrial buildings and structures
- 72121005 Pharmaceutical manufacturing plant construction and remodeling service
- 95122401 Workshop
Show all 19
- 72121000 New industrial building and warehouse construction services
- 72121500 Industrial plant construction services
- 72121001 Dry cleaning plant construction and remodeling service
- 72121003 Grain elevator construction and remodeling service
- 72121401 Bank building construction service
- 72121502 Mine loading and discharging station construction service
- 72121507 Tank construction and servicing
- 72121508 Preparation plant construction service
- 95122403 Warehouse store
Updated .
About this opportunity
The Michigan Department of Natural Resources (MDNR) and Department of Technology, Management and Budget (DTMB) are seeking qualified contractors for the Au Train River Bridge Superstructure Removal project in Alger County. The procurement involves completely removing and disposing of the center span of an existing trail bridge, specifically a 50'x16' steel plate girder superstructure and timber deck down to the top of pile caps. The project requires compliance with state prevailing wage rates, environmental regulations, and specific demolition protocols, including proper disposal of hazardous materials like lead-based paint. A mandatory virtual pre-bid meeting is scheduled for April 29, 2025, at 9:00 A.M. EST via Microsoft Teams, with final bids due electronically on May 14, 2025, at 2:00 p.m. Eastern time through SIGMA VSS. Bidders must submit their proposals with a 5% bid security and are limited to two attachments of less than 25 MB each. Contractors must email any questions to Steve Wright at swright@upea.com by May 7, 2025, and the contract time is set at 21 days after contractor work begins.
The contract includes potential preferences for Qualified Disabled Veteran (QDV) businesses and requires contractors to be registered with the State Project Registration (SPR) system. Bidders must provide performance and payment bonds and carry builders' risk insurance. The project has specific environmental constraints, including restrictions on work during fish spawning seasons and careful management of soil erosion and sedimentation controls. While no specific award value is explicitly stated, the contract will be funded by the State of Michigan, with the final amount determined by the bid submissions. Contractors will need to navigate complex site access requirements, including limited foot traffic on side spans during construction and potential use of smaller equipment on approach spans. The project is managed by U.P. Engineers & Architects, Inc., located in Houghton, Michigan, and utilizes NIGP Code 91313. Potential bidders should be prepared to demonstrate compliance with state regulations, environmental standards, and technical specifications outlined in the detailed bid documents.
Opportunity text
751/24434.JBB; Au Train River Bridge Superstructure Removal